TUP048 Identifying Jitter Sources in the LCLS Linac 506
 
  • F.-J. Decker, R. Akre, A. Brachmann, W.S. Colocho, Y.T. Ding, D. Dowell, P. Emma, J.C. Frisch, A. Gilevich, G.R. Hays, P. Hering, Z. Huang, R.H. Iverson, K.D. Kotturi, A. Krasnykh, C. Limborg-Deprey, H. Loos, S. Molloy, H.-D. Nuhn, D.F. Ratner, J.L. Turner, J.J. Welch, W.E. White, J. Wu
    SLAC, Menlo Park, California
 
 

The beam stability for the Linac Coherent Light Source (LCLS) Free-Electron Laser (FEL) at Stanford Linear Accelerator Center (SLAC) are critical for X-Ray power, pointing, and timing stability. Studies of the transverse, longitudinal, and intensity stability of the electron beam are presented. Identifying these sources by different methods like correlations, frequency spectrum analysis and other methods is critical for finally eliminating or reducing them.

 

slides icon

Slides

 
FR102 Commissioning of the LCLS Linac 1095
 
  • H. Loos, R. Akre, A. Brachmann, F.-J. Decker, Y.T. Ding, D. Dowell, P. Emma, J.C. Frisch, A. Gilevich, G.R. Hays, P. Hering, Z. Huang, R.H. Iverson, C. Limborg-Deprey, A. Miahnahri, S. Molloy, H.-D. Nuhn, J.L. Turner, J.J. Welch, W.E. White, J. Wu
    SLAC, Menlo Park, California
  • D.F. Ratner
    Stanford University, Stanford, Califormia
 
 

Funding: This work was supported by U.S. Department of Energy, Office of Basic Energy Sciences, under Contract DE-AC02-76SF00515
Construction of the Linac Coherent Light Source (LCLS) X-ray free electron laser at the Stanford Linear Accelerator Center (SLAC) is nearing completion. A new injector and upgrades to the existing accelerator were installed in two phases in 2006 and 2007. We report on the commissioning of the injector, the two new bunch compressors at 250 MeV and 4.3 GeV, and transverse and longitudinal beam diagnostics up to the end of the existing linac at 13.6 GeV. The commissioning of the new transfer line from the end of the linac through the undulator beam line to the main dump is scheduled to start in January 2009 and for the undulator magnets in March 2009 with first light to be expected by May 2009.

 