MOPTY008 Preliminary Hardware Implementation of Compensation Mechanism of Superconducting Cavity Failure in C-ADS Linac 953
 
  • Z. Xue, J.P. Dai
    IHEP, Beijing, People's Republic of China
  • L. Cheng, Y. Yang
    SINANO, Suzhou, People's Republic of China
 
  For the proton linear accelerators used in applications such as ADS, due to the nature of the operation, it is essential to have beam failures at the rate several orders of magnitude lower than usual performance of similar accelerators. In order to achieve this extremely high performance reliability requirement, in addition to hardware improvement, a failure tolerant design is mandatory. A compensation mechanism to cope with hardware failure, mainly RF failures of superconducting cavities, will be in place in order to maintain the high uptime, short recovery time and extremely low frequency of beam loss. The hardware implementation of the mechanism poses high challenges due to the extremely tight timing constraints, high logic complexity, and mostly important, high flexibility and short turnaround time due to varying operation contexts. We will explore the hardware implementation of the scheme using fast electronic devices and Field Programmable Gate Array (FPGA). In order to achieve the goals of short recovery time and flexibility in compensation algorithms, an advanced hardware design methodology including high-level synthesis will be used.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-MOPTY008  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPF055 Status of the Superconducting Cavity Development at IHEP for the CADS Linac 3824
 
  • F.S. He, J.P. Dai, J. Dai, X. Huang, L.H. Li, Z.Q. Li, Q. Ma, Z.H. Mi, B. Ni, W.M. Pan, X.H. Peng, T. Qi, P. Sha, G.W. Wang, Q.Y. Wang, Z. Xue, X.Y. Zhang, G.Y. Zhao
    IHEP, Beijing, People's Republic of China
  • H. Huang, H.Y. Lin
    Institute of High Energy Physics (IHEP), Chinese Academy of Sciences, Beijing, People's Republic of China
 
  IHEP (Institute of High Energy Physics) is developing a CW 10MeV proton injector and part of the 25MeV main linac for the CADS project. 14 SRF (superconducting radio frequency) spoke-012 cavities for the injector, as well as 6 SRF spoke-021 cavities for the main linac are to be beam commissioned before middle of 2016; meanwhile, VT (vertical test) of two more types of prototype cavities are to be finished with 2015, for the future phases of the project. In this paper, the VT statistics of 10 spoke012 cavities, 4 spoke021 cavities, and a 5-cell β0.82 elliptical cavity are reported; the cavity performance during beam commissioning of the TCM (test cryomodule) is reported as well.  