THPF126 | PXIE Low Energy Beam Transport Commissioning | 4013 |
|
||
Funding: Operated by Fermi Research Alliance, LLC, under Contract DE-AC02-07CH11359 with the United States Department of Energy The Proton Improvement Plan II at Fermilab is a program of upgrades to the injection complex [1]. At its core is the design and construction of a CW-compatible, pulsed H− superconducting RF linac. To validate the concept of the front-end of such machine, a test accelerator (a.k.a. PXIE) is under construction [2]. It includes a 10 mA DC, 30 keV H− ion source, a 2m-long LEBT, a 2.1 MeV CW RFQ, followed by a MEBT that feeds the first of 2 cryomodules taking the beam energy to ~25 MeV, and a High Energy Beam Transport section (HEBT) that takes the beam to a dump. The ion source and LEBT, which includes 3 solenoids, several clearing electrodes/collimators and a chopping system, have been built, installed, and commissioned to full specification parameters. This report presents the outcome of our commissioning activities, including phase-space measurements at the end of the beam line under various neutralization schemes obtained by changing the electrodes’ biases and chopper parameters. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-THPF126 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
MOPTY082 | Beam Instrumentation of the PXIE LEBT Beam Line | 1129 |
|
||
The PXIE accelerator is the front-end test stand of the proposed Proton Improvement Plan (PIP-II) initiative: a CW-compatible pulsed H− superconducting RF linac upgrade to Fermilab’s injection system. The PXIE Ion Source and Low-Energy Beam Transport (LEBT) section are designed to create and transfer a 1–10 mA H− beam, in either pulsed (0.001–16 ms) or DC mode, from the ion source through to the injection point of the RFQ. This paper discusses the range of diagnostic tools Allison-type Emittance Scanner, Faraday Cup, Toroid, DCCT, electrically isolated diaphragms – involved in the commissioning of the beamline and preparation of the beam for injection into the RFQ. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-MOPTY082 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPF105 | Status of the RAL Front End Test Stand | 3959 |
|
||
The Front End Test Stand (FETS) under construction at RAL is a demonstrator of front end systems for future high power proton linacs. Possible applications include a linac upgrade for the ISIS spallation neutron source, new future neutron sources, accelerator driven sub-critical systems, high energy physics proton drivers etc. Designed to deliver a 60mA H-minus beam at 3MeV with a 10% duty factor, FETS consists of a high brightness surface plasma ion source, magnetic solenoid low energy beam transport (LEBT), 4-vane 324MHz radio frequency quadrupole and medium energy beam transport (MEBT) containing a high speed beam chopper and non-destructive laser diagnostics. This paper describes the current status of the project and future plans. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-THPF105 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |