Author: D'Arcy, R.T.P.
Paper Title Page
THPF126 PXIE Low Energy Beam Transport Commissioning 4013
 
  • L.R. Prost, M.L. Alvarez, R. Andrews, J.-P. Carneiro, R.T.P. D'Arcy, B.M. Hanna, V.E. Scarpine, A.V. Shemyakin
    Fermilab, Batavia, Illinois, USA
  • R.T.P. D'Arcy
    UCL, London, United Kingdom
  • C. Wiesner
    IAP, Frankfurt am Main, Germany
 
  Funding: Operated by Fermi Research Alliance, LLC, under Contract DE-AC02-07CH11359 with the United States Department of Energy
The Proton Improvement Plan II at Fermilab is a program of upgrades to the injection complex [1]. At its core is the design and construction of a CW-compatible, pulsed H superconducting RF linac. To validate the concept of the front-end of such machine, a test accelerator (a.k.a. PXIE) is under construction [2]. It includes a 10 mA DC, 30 keV H ion source, a 2m-long LEBT, a 2.1 MeV CW RFQ, followed by a MEBT that feeds the first of 2 cryomodules taking the beam energy to ~25 MeV, and a High Energy Beam Transport section (HEBT) that takes the beam to a dump. The ion source and LEBT, which includes 3 solenoids, several clearing electrodes/collimators and a chopping system, have been built, installed, and commissioned to full specification parameters. This report presents the outcome of our commissioning activities, including phase-space measurements at the end of the beam line under various neutralization schemes obtained by changing the electrodes’ biases and chopper parameters.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-THPF126  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPTY082 Beam Instrumentation of the PXIE LEBT Beam Line 1129
 
  • R.T.P. D'Arcy
    UCL, London, United Kingdom
  • B.M. Hanna, L.R. Prost, V.E. Scarpine, A.V. Shemyakin
    Fermilab, Batavia, Illinois, USA
 
  The PXIE accelerator is the front-end test stand of the proposed Proton Improvement Plan (PIP-II) initiative: a CW-compatible pulsed H superconducting RF linac upgrade to Fermilab’s injection system. The PXIE Ion Source and Low-Energy Beam Transport (LEBT) section are designed to create and transfer a 1–10 mA H beam, in either pulsed (0.001–16 ms) or DC mode, from the ion source through to the injection point of the RFQ. This paper discusses the range of diagnostic tools —Allison-type Emittance Scanner, Faraday Cup, Toroid, DCCT, electrically isolated diaphragms – involved in the commissioning of the beamline and preparation of the beam for injection into the RFQ.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-MOPTY082  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPF105 Status of the RAL Front End Test Stand 3959
 
  • A.P. Letchford, M.A. Clarke-Gayther, M. Dudman, D.C. Faircloth, S.R. Lawrie
    STFC/RAL/ISIS, Chilton, Didcot, Oxon, United Kingdom
  • S.M.H. Alsari, M. Aslaninejad, J.K. Pozimski, P. Savage
    Imperial College of Science and Technology, Department of Physics, London, United Kingdom
  • J.J. Back
    University of Warwick, Coventry, United Kingdom
  • G.E. Boorman, A. Bosco, S.M. Gibson
    Royal Holloway, University of London, Surrey, United Kingdom
  • R.T.P. D'Arcy, S. Jolly
    UCL, London, United Kingdom
  • J.K. Pozimski
    STFC/RAL, Chilton, Didcot, Oxon, United Kingdom
 
  The Front End Test Stand (FETS) under construction at RAL is a demonstrator of front end systems for future high power proton linacs. Possible applications include a linac upgrade for the ISIS spallation neutron source, new future neutron sources, accelerator driven sub-critical systems, high energy physics proton drivers etc. Designed to deliver a 60mA H-minus beam at 3MeV with a 10% duty factor, FETS consists of a high brightness surface plasma ion source, magnetic solenoid low energy beam transport (LEBT), 4-vane 324MHz radio frequency quadrupole and medium energy beam transport (MEBT) containing a high speed beam chopper and non-destructive laser diagnostics. This paper describes the current status of the project and future plans.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-THPF105  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)