Author: Cerutti, F.
Paper Title Page
MOPJE058 FLUKA Modeling of the ESS Accelerator 434
 
  • L. Lari, M. Eshraqi, L.S. Esposito, L. Tchelidze
    ESS, Lund, Sweden
  • F. Cerutti, L.S. Esposito, L. Lari, A. Mereghetti
    CERN, Geneva, Switzerland
 
  In order to evaluate the energy deposition and radiation issues concerning the ESS accelerator, a FLUKA model of the machine has been created. The geometry of the superconducting beam line is built according to the machine optics, described in the TraceWin file and the CATIA drawings of the beam elements, using the LineBuilder tool developed at CERN. The objective is to create a flexible FLUKA model that is able to be adapted to the optimization of the optics, design modifications and machine integration constraints. Preliminary results are also presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-MOPJE058  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPTY024 Updated Simulation Studies of Damage Limit of LHC Tertiary Collimators 2053
 
  • E. Quaranta, A. Bertarelli, R. Bruce, F. Carra, F. Cerutti, P. Gradassi, A. Lechner, S. Redaelli, E. Skordis
    CERN, Geneva, Switzerland
 
  The tertiary collimators (TCTs) in the LHC, installed in front of the experiments, in standard operation intercept fractions of 103 halo particles. However, they risk to be hit by high-intensity primary beams in case of asynchronous beam dump. TCT damage thresholds were initially inferred from results of destructive tests on a TCT jaw, supported by numerical simulations, assuming simplified impact scenarios with one single bunch hitting the jaw with a given impact parameter. In this paper, more realistic failure conditions, including a train of bunches and taking into account the full collimation hierarchy, are used to derive updated damage limits. The results are used to update the margins in the collimation hierarchy and could thus potentially have an influence on the LHC performance.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPTY024  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPTY028 Collimator Layouts for HL-LHC in the Experimental Insertions 2064
 
  • R. Bruce, F. Cerutti, L.S. Esposito, J.M. Jowett, A. Lechner, E. Quaranta, S. Redaelli, M. Schaumann, E. Skordis, G.E. Steele
    CERN, Geneva, Switzerland
  • H. Garcia Morales, R. Kwee-Hinzmann
    JAI, Egham, Surrey, United Kingdom
 
  This paper presents the layout of collimators for HL-LHC in the experimental insertions. On the incoming beam, we propose to install additional tertiary collimators to protect potential new aperture bottlenecks in cells 4 and 5, which in addition reduce the experimental background. For the outgoing beam, the layout of the present LHC with three physics debris absorbers gives sufficient protection for high-luminosity proton operation. However, collisional processes for heavy ions cause localized beam losses with the potential to quench magnets. To alleviate these losses, an installation of dispersion suppressor collimators is proposed.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPTY028  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPTY046 Impact of Beam Losses in the LHC Collimation Regions 2116
 
  • E. Skordis, R. Bruce, F. Cerutti, A. Ferrari, P.D. Hermes, A. Lechner, A. Mereghetti, P.G. Ortega, S. Redaelli, V. Vlachoudis
    CERN, Geneva, Switzerland
 
  The upgrade of the LHC energy and brightness, from the 2015 restart at close to design energy until the HL-LHC era with considerable hardware development and layout renewal, poses tight challenges in terms of machine protection. The collimation insertions and especially the one dedicated to betatron cleaning (IR7), where most of the beam halo is intercepted to spare from losses the cold sectors of the ring, will be subject to a significant increase of radiation load, whose leakage to the nearby dispersion suppressors must be kept sustainable. The past LHC run, while displaying a remarkable performance of the collimation system, offered the opportunity for a demanding benchmarking of the complex simulation chain describing the beam losses and the macroscopic effects of the induced particle showers, this way strengthening the confidence in the reliability of its predictions. This paper discusses the adopted calculation strategy and its evolution options, showing the accuracy achieved with respect to Beam Loss Monitor measurements in controlled loss scenarios. Expectations at design energy, including lifetime considerations concerning critical elements, will also be presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPTY046  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPTY050 Considerations for the Beam Dump System of a 100 TeV Centre-of-mass FCC hh Collider 2132
 
  • T. Kramer, M.G. Atanasov, M.J. Barnes, W. Bartmann, J. Borburgh, E. Carlier, F. Cerutti, L. Ducimetière, B. Goddard, A. Lechner, R. Losito, G.E. Steele, L.S. Stoel, J.A. Uythoven, F.M. Velotti
    CERN, Geneva, Switzerland
 
  A 100 TeV centre-of-mass energy frontier proton collider in a new tunnel of 80–100 km circumference is a central part of CERN’s Future Circular Colliders (FCC) design study. One of the major challenges for such a machine will be the beam dump system, which for each ring will have to reliably abort proton beams with stored energies in the range of 8 Gigajoule, more than an order of magnitude higher than planned for HL-LHC. The transverse proton beam energy densities are even more extreme, a factor of 100 above that of the presently operating LHC. The requirements for the beam dump subsystems are outlined, and the present technological limitations are described. First concepts for the beam dump system are presented and the feasibility is discussed, highlighting in particular the areas in which major technological progress will be needed. The potential implications on the overall machine and other key subsystems are described, including constraints on filling patterns, interlocking, beam intercepting devices and insertion design.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPTY050  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPTY067 Beam Induced Background Simulation Studies at IR1 with New High Luminosity LHC Layout 2184
 
  • R. Kwee-Hinzmann, S.M. Gibson
    JAI, Egham, Surrey, United Kingdom
  • R. Bruce, F. Cerutti, L.S. Esposito, A. Lechner
    CERN, Geneva, Switzerland
  • S.M. Gibson
    Royal Holloway, University of London, Surrey, United Kingdom
 
  Funding: Research supported by FP7 HiLumi LHC – Grant agreement 284404
In the High Luminosity LHC (HL-LHC), the collimation system will be upgraded in the high-luminosity experimental regions. Additional protection is planned for the Q4 and Q5 magnets that are located further upstream of the tertiary collimators that protect the inner triplet magnets. We evaluate the effect of this proposed collimation layout for the incoming beam 1 on machine-induced background in the experimental area of IR1 (ATLAS). The main scenario is the round optics with β∗ of 15 cm, but a flat scenario is also briefly discussed.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPTY067  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMA045 Energy Deposition and DPA in the Superconducting Links for the HiLumi LHC project at the LHC Interaction Points 2865
 
  • F. Broggi, A. Bignami, C. Santini
    INFN/LASA, Segrate (MI), Italy
  • A. Ballarino, F. Cerutti, L.S. Esposito
    CERN, Geneva, Switzerland
 
  Funding: The work is part of HiLumi LHC Design Study, partly funded by the European Commission, GA 284404, and included in the High Luminosity LHC project.
In the framework of the upgrade of the LHC machine, the powering of the LHC magnets foresees the removal of the power converters and distribution feedboxes from the tunnel and its location at the surface[1]. The Magnesium Diboride (MgB2) connecting lines in the tunnel will be exposed to the debris from 7+7 TeV p-p interaction. The Superconducting (SC) Links will arrive from the surface to the tunnel near the separation dipole, at about 80 m from the Interaction Point at IP1 and IP5. The Connection Box (where the cables of the SC Links are connected to the NbTi bus bar) will be close to the beam pipe. The debris and its effect on the MgB2 SC links in the connection box (energy deposition and displacement per atom) are presented. The effect of thermal neutrons on the Boron consumption and the contribution of the lithium nucleus and the alpha particle on the DPA are evaluated. The results are normalized to an integrated luminosity of 3000 fb-1, value that represents the LHC High Luminosity lifetime. The dose delivered to the SC Links is found to be below the damage limit. Further studies are necessary to correlate the induced displacement per atom to the superconducting properties.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-WEPMA045  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPF097 Feasibility Study of a New SPS Beam Dump System 3930
 
  • F.M. Velotti, J.L. Abelleira, M.J. Barnes, C. Bracco, E. Carlier, F. Cerutti, K. Cornelis, R. Folch, B. Goddard, V. Kain, M. Meddahi, R.F. Morton, J.A. Osborne, F. Pasdeloup, V. Senaj, G.E. Steele, J.A. Uythoven, H. Vincke
    CERN, Geneva, Switzerland
 
  The CERN Super Proton Synchrotron (SPS) presently uses an internal beam dump system with two separate blocks to cleanly dispose of low and high energy beams. In view of the increased beam power and brightness needed for the LHC Injector Upgrade project for High Luminosity LHC (HL-LHC), the performance of this internal beam dump system has been reviewed for future operation. Different possible upgrades of the beam dumping system have been investigated. The initially considered solution for the SPS Beam Dump System is to design a new, dedicated external system, with a dump block in a shielded cavern separated from the machine ring. Unfortunately this solution is not feasible with the present technology. In this paper, the design requirements and the possible solutions are investigated, including considering a new internal beam dump in the Long Straight Section 5 (LSS5).  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-THPF097  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)