Author: Mori, T.
Paper Title Page
MOPRO023 SuperKEKB Beam abort System 116
 
  • T. Mimashi, N. Iida, M. Kikuchi, T. Mori
    KEK, Ibaraki, Japan
  • K. Abe
    Hitachi Power Semiconductor Device, Ltd., Hitachishi, Ibaraki, Japan
  • A. Sasagawa
    KYOCERA Corporation, Higashiomi-city, Shiga, Japan
  • A. Tokuchi
    Pulsed Power Japan Laboratory Ltd., Kusatsu-shi Shiga, Japan
 
  The abort system of the SuperKEKB is described. The beam abort system consists of the beam abort kicker magnets, pulsed quadrupole magnets, a lambertson septum magnet and extracted window. The dumped beam is extracted with beam abort kicker through the extraction window. The pulsed quadrupole magnets make the beam spot size large at the window. The damages of the extraction window is tested with KEKB beam. The pulsed kicker power supply is under development.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-MOPRO023  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPRO025 Electron Beam Injection System for SuperKEKB Main Ring 122
 
  • T. Mori, N. Iida, M. Kikuchi, T. Mimashi, Y. Sakamoto, S. Takasaki, M. Tawada
    KEK, Ibaraki, Japan
 
  The SuperKEKB project is in progress toward the initial physics run in the year 2015. It assumes the nano-beam scheme, in which the emittance of the colliding beams is ε=4.6\mbox{nm}. The emittance of the injected beam is ε=1.46\mbox{nm}. To acheave such a low emittance, it is vitally important to preserve the emittance during the transport of the beam from the linac to the main ring. One of the most difficult sections is the injection system. It has been pointed out that the injected beam has possibility of leading to blowup in the ring, which is caused by a beam-beam interaction with the stored positron beam. To avoid the beam blowup, the synchrotron injection is adopted as a backup option. The orbit of the electron injection beam has been designed and the septum magnet prototype has been constructed. The optics study for electron injection and the current R&D status for the septum magnet will be reported in this paper.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-MOPRO025  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPRI004 SuperKEKB Positron Source Construction Status 579
 
  • T. Kamitani, M. Akemoto, D.A. Arakawa, Y. Arakida, A. Enomoto, S. Fukuda, Y. Funakoshi, K. Furukawa, T. Higo, H. Honma, N. Iida, M. Ikeda, E. Kadokura, H. Kaji, K. Kakihara, H. Katagiri, M. Kikuchi, H. Koiso, M. Kurashina, S. Matsumoto, T. Matsumoto, H. Matsushita, S. Michizono, K. Mikawa, T. Mimashi, T. Miura, F. Miyahara, T. Mori, A. Morita, H. Nakajima, K. Nakao, T. Natsui, Y. Ogawa, Y. Ohnishi, S. Ohsawa, M. Sato, T. Shidara, A. Shirakawa, M. Suetake, H. Sugimoto, T. Suwada, T. Takatomi, T. Takenaka, M. Tanaka, M. Tawada, Y. Yano, K. Yokoyama, M. Yoshida, L. Zang, X. Zhou
    KEK, Ibaraki, Japan
  • D. Satoh
    TIT, Tokyo, Japan
 
  The KEKB positron source is under the upgrade for SuperKEKB. The previous positron production target and capture section have been removed and the new system is constructed at a location forty meters upstream to have sufficient energy margin for beam injection to the newly introduced damping ring. A flux concentrator is introduced in the new capture section to make an adiabatic matching system. Large aperture (30mm in diameter) S-band accelerating structures are introduced in the capture section and in the subsequent accelerator module to enlarge the transverse phase space acceptance. The beam focusing system of quadrupoles is also upgraded for a comparable beam acceptance to that of the capture section. This paper reports on the status of the SuperKEKB positron source construction and the preliminary positron beam commissioning.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-MOPRI004  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)