JACoW logo

Joint Accelerator Conferences Website

The Joint Accelerator Conferences Website (JACoW) is an international collaboration that publishes the proceedings of accelerator conferences held around the world.


RIS citation export for MOPRI004: SuperKEKB Positron Source Construction Status

TY - CONF
AU - Kamitani, T.
AU - Akemoto, M.
AU - Arakawa, D.A.
AU - Arakida, Y.
AU - Enomoto, A.
AU - Fukuda, S.
AU - Funakoshi, Y.
AU - Furukawa, K.
AU - Higo, T.
AU - Honma, H.
AU - Iida, N.
AU - Ikeda, M.
AU - Kadokura, E.
AU - Kaji, H.
AU - Kakihara, K.
AU - Katagiri, H.
AU - Kikuchi, M.
AU - Koiso, H.
AU - Kurashina, M.
AU - Matsumoto, S.
AU - Matsumoto, T.
AU - Matsushita, H.
AU - Michizono, S.
AU - Mikawa, K.
AU - Mimashi, T.
AU - Miura, T.
AU - Miyahara, F.
AU - Mori, T.
AU - Morita, A.
AU - Nakajima, H.
AU - Nakao, K.
AU - Natsui, T.
AU - Ogawa, Y.
AU - Ohnishi, Y.
AU - Ohsawa, S.
AU - Sato, M.
AU - Satoh, D.
AU - Shidara, T.
AU - Shirakawa, A.
AU - Suetake, M.
AU - Sugimoto, H.
AU - Suwada, T.
AU - Takatomi, T.
AU - Takenaka, T.
AU - Tanaka, M.
AU - Tawada, M.
AU - Yano, Y.
AU - Yokoyama, K.
AU - Yoshida, M.
AU - Zang, L.
AU - Zhou, X.
ED - Petit-Jean-Genaz, Christine
ED - Arduini, Gianluigi
ED - Michel, Peter
ED - Schaa, Volker RW
TI - SuperKEKB Positron Source Construction Status
J2 - Proc. of IPAC2014, Dresden, Germany, June 15-20, 2014
C1 - Dresden, Germany
T2 - International Particle Accelerator Conference
T3 - 5
LA - english
AB - The KEKB positron source is under the upgrade for SuperKEKB. The previous positron production target and capture section have been removed and the new system is constructed at a location forty meters upstream to have sufficient energy margin for beam injection to the newly introduced damping ring. A flux concentrator is introduced in the new capture section to make an adiabatic matching system. Large aperture (30mm in diameter) S-band accelerating structures are introduced in the capture section and in the subsequent accelerator module to enlarge the transverse phase space acceptance. The beam focusing system of quadrupoles is also upgraded for a comparable beam acceptance to that of the capture section. This paper reports on the status of the SuperKEKB positron source construction and the preliminary positron beam commissioning.
PB - JACoW
CP - Geneva, Switzerland
SP - 579
EP - 581
KW - positron
KW - electron
KW - target
KW - solenoid
KW - operation
DA - 2014/07
PY - 2014
SN - 978-3-95450-132-8
DO - 10.18429/JACoW-IPAC2014-MOPRI004
UR - http://jacow.org/ipac2014/papers/mopri004.pdf
ER -