Paper |
Title |
Page |
MOPEA028 |
Present Status of the KEK PF-Ring and PF-AR |
136 |
|
- K. Tsuchiya, S. Asaoka, K. Haga, K. Harada, T. Honda, Y. Honda, M. Isawa, Y. Kamiya, T. Miyajima, H. Miyauchi, S. Nagahashi, N. Nakamura, T. Nogami, T. Obina, T. Ozaki, H. Sagehashi, H. Sakai, S. Sakanaka, H. Sasaki, Y. Sato, M. Shimada, K. Shinoe, T. Shioya, M. Tadano, T. Tahara, T. Takahashi, R. Takai, Y. Tanimoto, T. Uchiyama, A. Ueda, K. Umemori, M. Yamamoto
KEK, Ibaraki, Japan
- H. Takaki
ISSP/SRL, Chiba, Japan
|
|
|
In KEK, two synchrotron light sources have been operated. One is the 2.5 GeV Photon Factory storage ring (PF-ring) and the other is the 6.5 GeV Photon Factory advanced ring (PF-AR). In this paper, present operational status and recent R&D activities such as fast local bump system for helicity switching undulator, hybrid injection system, pulsed-sextupole injection, etc. Futhermore, upgrade plan towards the top-up injection of 6.5 GeV PF-AR ring is underway. Construction of the straight injection tunnel from linac to PF-AR will be started next fiscal year. Design detail and strategy for the injection scheme will be reported.
|
|
|
TUPME015 |
Proposal of Polarized Gamma-ray Source for ILC Based on CSR Inverse Compton Scattering |
1598 |
|
- M. Shimada, K. Yokoya
KEK, Ibaraki, Japan
- R. Hajima
JAEA, Ibaraki-ken, Japan
- M. Tecimer
University of Hawaii at Manoa, Honolulu, USA
|
|
|
The positron source of International Linear Collider (ILC) requires a circular polarized gamma-ray with a flux more than 1016 phs./s and a helical undulator-based gamma-ray source is proposed in the baseline design. Although the undulator scheme is technically feasible, it is not easy for a stand-alone operation because of the required electron energy, ~ 150GeV. In this paper, we propose an alternative method, the inverse Compton scattering with a high-power mid-infrared optical pulse generated from coherent synchrotron radiation (CSR). To achieve the high flux gamma-ray, CSR with a few MHz is stacked in a high-finesse optical cavity made of a photonic crystal. In the proposed scheme, a stand-alone operation is feasible because the electron energy is less than 10GeV.
|
|
|
WEPWA015 |
Progress in Construction of the 35 MeV Compact Energy Recovery Linac at KEK |
2159 |
|
- S. Sakanaka, S. Adachi, M. Akemoto, D.A. Arakawa, S. Asaoka, K. Enami, K. Endo, S. Fukuda, T. Furuya, K. Haga, K. Hara, K. Harada, T. Honda, Y. Honda, H. Honma, T. Honma, K. Hosoyama, K. Hozumi, E. Kako, Y. Kamiya, H. Katagiri, H. Kawata, Y. Kobayashi, Y. Kojima, Y. Kondou, T. Kume, T. Matsumoto, H. Matsumura, H. Matsushita, S. Michizono, T. Miura, T. Miyajima, S. Nagahashi, H. Nakai, H. Nakajima, N. Nakamura, K. Nakanishi, K. Nakao, K.N. Nigorikawa, T. Nogami, S. Noguchi, S. Nozawa, T. Obina, T. Ozaki, F. Qiu, H. Sagehashi, H. Sakai, S. Sasaki, K. Satoh, M. Satoh, T. Shidara, M. Shimada, K. Shinoe, T. Shioya, T. Shishido, M. Tadano, T. Takahashi, R. Takai, T. Takenaka, Y. Tanimoto, M. Tobiyama, K. Tsuchiya, T. Uchiyama, A. Ueda, K. Umemori, K. Watanabe, M. Yamamoto, Y. Yamamoto, Y. Yano, M. Yoshida
KEK, Ibaraki, Japan
- E. Cenni
Sokendai, Ibaraki, Japan
- R. Hajima, S.M. Matsuba, R. Nagai, N. Nishimori, M. Sawamura, T. Shizuma
JAEA, Ibaraki-ken, Japan
- H. Takaki
ISSP/SRL, Chiba, Japan
|
|
|
The 35-MeV Compact Energy Recovery Linac (the Compact ERL or cERL) is under construction at the High Energy Accelerator Research Organization (KEK) in Japan. With the Compact ERL, we aim at establishing cutting-edge technologies for the GeV-class ERL-based synchrotron light source. To install the accelerator components of the cERL, we have constructed a shielding room having an area of about 60 m x 20 m. We have then installed a 500-kV DC photocathode gun, a 5-MV superconducting (SC) cryomodule for the injector, a 30-MV SC cryomodule for the main linac, and some of the other components. High-power test on the main SC cryomodule is underway in December, 2012. High-power or high-voltage tests on the injector cryomodule and on the DC gun are planned during January to March, 2013. An injector of the Compact ERL will be commissioned in April, 2013. We report the newest status of its construction.
|
|
|