Author: Shaposhnikova, E.N.
Paper Title Page
TUPEA053 Feasibility Study of the AWAKE Facility at CERN 1253
 
  • E. Gschwendtner, C. Bracco, B. Goddard, M. Meddahi, A. Pardons, E.N. Shaposhnikova, H. Timko, F.M. Velotti, H. Vincke
    CERN, Geneva, Switzerland
 
  Plasma Wakefield acceleration is a rapidly developing field which appears to be a promising candidate technology for future high-energy accelerators. The Proton Driven Plasma Wakefield Acceleration has been proposed as an approach to eventually accelerate an electron beam to the TeV energy range in a single plasma section. To verify this novel technique, a proof-of-principle demonstration experiment, AWAKE, is proposed using 400 GeV proton bunches from the SPS. Detailed studies on the identification of the best site for the installation of the AWAKE facility resulted in proposing the CNGS facility as best location. Design and integration layouts covering the beam line, the experimental area and all interfaces and services will be shown. Among other issues, radiation protection, safety and civil engineering constraints will be raised.  
 
TUPFI002 Electron Cloud and Scrubbing Studies for the LHC 1331
 
  • G. Iadarola
    Naples University Federico II, Science and Technology Pole, Napoli, Italy
  • G. Arduini, V. Baglin, H. Bartosik, C.O. Domínguez, J.F. Esteban Müller, G. Iadarola, G. Rumolo, E.N. Shaposhnikova, L.J. Tavian, F. Zimmermann
    CERN, Geneva, Switzerland
  • C.O. Domínguez
    EPFL, Lausanne, Switzerland
  • G.H.I. Maury Cuna
    CINVESTAV, Mexico City, Mexico
 
  Electron cloud build-up resulting from beam-induced multipacting is one of the major limitations for the operation of the LHC with beams with close bunch spacing. Electron clouds induce unwanted pressure rise, heat loads on the beam screens of the superconducting magnets and beam instabilities. Operation with bunch spacing of 50 ns in 2011 and 2012 has required decreasing the Secondary Electron Yield of the beam screens below the multipacting threshold for beams with this bunch spacing. This was achieved by continuous electron bombardment induced by operating the machine with high intensity beams with 50 and 25 ns spacing during dedicated periods at injection energy (450 GeV) and at top energy (3.5 and 4 TeV). The evolution of the Secondary Electron Yield during these periods, at different sections of the machine, can be estimated by pressure, heat load and by bunch-by-bunch RF stable phase measurements. The experimental information on the scrubbing process will be discussed and a possible “scrubbing strategy” to allow the operation with 50ns and 25ns beams after the Long Shutdown in 2013-2014 will be presented.  
 
TUPME032 Update on Beam Induced RF Heating in the LHC 1646
 
  • B. Salvant, O. Aberle, G. Arduini, R.W. Aßmann, V. Baglin, M.J. Barnes, W. Bartmann, P. Baudrenghien, O.E. Berrig, A. Bertarelli, C. Bracco, E. Bravin, G. Bregliozzi, R. Bruce, F. Carra, F. Caspers, G. Cattenoz, S.D. Claudet, H.A. Day, M. Deile, J.F. Esteban Müller, P. Fassnacht, M. Garlaschè, L. Gentini, B. Goddard, A. Grudiev, B. Henrist, S. Jakobsen, O.R. Jones, O. Kononenko, G. Lanza, L. Lari, T. Mastoridis, V. Mertens, N. Mounet, E. Métral, A.A. Nosych, J.L. Nougaret, S. Persichelli, A.M. Piguiet, S. Redaelli, F. Roncarolo, G. Rumolo, B. Salvachua, M. Sapinski, R. Schmidt, E.N. Shaposhnikova, L.J. Tavian, M.A. Timmins, J.A. Uythoven, A. Vidal, J. Wenninger, D. Wollmann, M. Zerlauth
    CERN, Geneva, Switzerland
  • H.A. Day
    UMAN, Manchester, United Kingdom
  • L. Lari
    IFIC, Valencia, Spain
 
  Since June 2011, the rapid increase of the luminosity performance of the LHC has come at the expense of increased temperature and pressure readings on specific near-beam LHC equipment. In some cases, this beam induced heating has caused delays whilie equipment cools down, beam dumps and even degradation of these devices. This contribution gathers the observations of beam induced heating attributable to beam coupling impedance, their current level of understanding and possible actions that are planned to be implemented during the long shutdown in 2013-2014.  
 
TUPME034 Experimental Studies for Future LHC Beams in the SPS 1652
 
  • H. Bartosik, T. Argyropoulos, T. Bohl, S. Cettour-Cave, J.F. Esteban Müller, W. Höfle, G. Iadarola, Y. Papaphilippou, G. Rumolo, B. Salvant, F. Schmidt, E.N. Shaposhnikova, H. Timko
    CERN, Geneva, Switzerland
  • A.Y. Molodozhentsev
    KEK, Ibaraki, Japan
 
  The High Luminosity LHC (HL-LHC) project requires significantly higher beam intensity than presently accessible in the LHC injector chain. The aim of the LHC injectors upgrade project (LIU) is to prepare the CERN accelerators for the future needs of the LHC. Therefore a series of machine studies with high brightness beams were performed, assessing the present performance reach and identifying remaining limitations. Of particular concern are beam loading and longitudinal instabilities at high energy, space charge for beams with 50ns bunch spacing and electron cloud effects for beams with 25ns bunch spacing. This paper provides a summary of the performed studies, that have been possible thanks to the implementation of the SPS low gamma-transition optics.  
 
TUPWA039 Identification of the SPS Impedance at 1.4 GHz 1793
 
  • T. Argyropoulos, T. Bohl, H. Damerau, J.F. Esteban Müller, E.N. Shaposhnikova, H. Timko
    CERN, Geneva, Switzerland
 
  In the SPS spectrum measurements of very long single bunches were used in the past to identify sources of longitudinal microwave instability. Shielding of the identified objects significantly improved the beam stability. However, longitudinal instabilities are still one of the limitations for high intensity LHC beams in the SPS. Recently the same measurement technique was used again, revealing a strong high frequency resonance. During the slow de-bunching with the RF switched off, the presence of different resonant impedances leads to a line density modulation at the resonant frequencies. Longitudinal profiles of bunches of various intensities were acquired. For sufficiently high intensities their spectra show a fast growing and strong modulation at 1.4 GHz. Measurements using two transverse optics with different transition energy are compared. Reproducing the measurements with numerical simulations, including the known SPS longitudinal impedances, allowed the parameter range of this unknown source to be determined. Possible candidates as impedance sources in the SPS ring are investigated.  
 
TUPWA040 Loss of Landau Damping for Inductive Impedance in a Double RF System 1796
 
  • T. Argyropoulos, E.N. Shaposhnikova
    CERN, Geneva, Switzerland
  • A.V. Burov
    Fermilab, Batavia, USA
 
  In this paper the thresholds of the loss of Landau damping due to the presence of inductive impedance in a single and double harmonic RF systems are determined, both from calculations and particle simulations. High harmonic RF system, operating in bunch lengthening mode is used in many accelerators with space charge or inductive impedance to reduce the peak line density or stabilize the beam. An analytical approach, based on emerging of the discrete Van Kampen modes, shows that improved stability in a double RF system can be achieved only below some critical value of longitudinal emittance. Above this threshold, a phase shift of more than 15 degrees between the two RF components is proven to stabilize the bunch. These results, confirmed also by particle simulations, are able to explain now observations during the ppbar operation of the SPS. The thresholds in bunch shortening mode as well as in a single RF case are compared with this regime.  
 
TUPWA049 Short High-Intensity Bunches for Plasma Wakefield Experiment AWAKE in the CERN SPS 1820
 
  • H. Timko, T. Argyropoulos, H. Bartosik, T. Bohl, J.F. Esteban Müller, E.N. Shaposhnikova
    CERN, Geneva, Switzerland
  • A.V. Petrenko
    BINP SB RAS, Novosibirsk, Russia
 
  Obtaining the shortest possible bunch length in combination with the smallest transverse emittances and highest bunch intensity – this is the wish list of the proton-bunch driven, plasma wakefield acceleration experiment AWAKE currently under feasibility study at CERN. A few measurement sessions were conducted to determine the achievable bunch properties and their reproducibility. To obtain a short bunch length, the bunches were rotated in longitudinal phase space using the maximum available RF voltage prior to extraction. Measurements were carried out in two optics with different transition energies. The main performance limitation is longitudinal beam instability that develops during the acceleration ramp. With lower transition energy, beam stability is improved, but the bucket area is smaller for the same voltage. Based on the results obtained, we shall discuss the choice of optics, the impact of longitudinal instabilities, the importance of reproducibility, as well as options for improving the bunch parameters.  
 
WEPEA053 Progress with the Upgrade of the SPS for the HL-LHC Era 2624
 
  • B. Goddard, T. Argyropoulos, W. Bartmann, H. Bartosik, T. Bohl, F. Caspers, K. Cornelis, H. Damerau, L.N. Drøsdal, L. Ducimetière, J.F. Esteban Müller, R. Garoby, M. Gourber-Pace, W. Höfle, G. Iadarola, L.K. Jensen, V. Kain, R. Losito, M. Meddahi, A. Mereghetti, V. Mertens, Ö. Mete, E. Montesinos, Y. Papaphilippou, G. Rumolo, B. Salvant, E.N. Shaposhnikova, M. Taborelli, H. Timko, F.M. Velotti
    CERN, Geneva, Switzerland
  • E. Gianfelice-Wendt
    Fermilab, Batavia, USA
 
  The demanding beam performance requirements of the HL-LHC project translate into a set of requirements and upgrade paths for the LHC injector complex. In this paper the performance requirements for the SPS and the known limitations are reviewed in the light of the 2012 operational experience. The various SPS upgrades in progress and still under consideration are described, in addition to the machine studies and simulations performed in 2012. The expected machine performance reach is estimated on the basis of the present knowledge, and the remaining decisions that still need to be made concerning upgrade options are detailed.  
 
THPFI056 Design Study for a Future LAGUNA-LBNO Long-baseline Neutrino Facility at CERN 3418
 
  • I. Efthymiopoulos, J. Alabau-Gonzalvo, A. Alekou, F. Antoniou, M. Benedikt, M. Calviani, A. Ferrari, R. Garoby, F. Gerigk, S.S. Gilardoni, B. Goddard, A. Kosmicki, C. Lazaridis, J.A. Osborne, Y. Papaphilippou, A.S. Parfenova, E.N. Shaposhnikova, R. Steerenberg, P. Velten, H. Vincke
    CERN, Geneva, Switzerland
 
  A design study for a long baseline neutrino oscillation experiment (LBNO) with a new conventional neutrino beamline facility (CN2PY) at CERN was initiated in September 2011, supported by EU/FP7 funds. The beam will be aimed at a next generation deep-underground neutrino observatory located at the Pyhasalmi (Finland) mine at a distance of 2300 km. In an initial phase the CN2PY facility will use a 400 GeV beam extracted from SPS up to a maximum power of 750 kW, and in a second phase a 2 MW beam of about 50 GeV produced by a new High-Power Proton Synchrotron accelerator using the LP-SPL as injector also under design. The paper will focus on the design challenges of this MW-class facility and on the optimization studies of the secondary beam elements (target and horns) to produce a neutrino beam spectrum that matches best the experimental requirements for neutrino flavor oscillations and CP-violation tests. The challenges and bottlenecks in the existing CERN accelerator complex to produce the high-intensity beams foreseen for this facility at the initial phase are discussed.  
 
THPWO077 Status and Plans for the Upgrade of the LHC Injectors 3936
 
  • R. Garoby, H. Damerau, S.S. Gilardoni, B. Goddard, K. Hanke, A.M. Lombardi, D. Manglunki, M. Meddahi, B. Mikulec, L. Ponce, E.N. Shaposhnikova, R. Steerenberg, M. Vretenar
    CERN, Geneva, Switzerland
 
  The plans for preparing the LHC injectors to fulfill the needs of the LHC during the next decade have significantly progressed in 2012. Linac4 construction has passed major steps of pre-series fabrication. Hardware developments and beam studies have allowed refining the baseline actions to implement and the beam characteristics achievable at injection into the collider for protons as well as for Lead ions. These achievements are described in this paper, together with the updated project planning matched to the new schedule of the LHC.  
 
THPWO080 Operational Performance of the LHC Proton Beams with the SPS Low Transition Energy Optics 3945
 
  • Y. Papaphilippou, G. Arduini, T. Argyropoulos, W. Bartmann, H. Bartosik, T. Bohl, C. Bracco, S. Cettour-Cave, K. Cornelis, L.N. Drøsdal, J.F. Esteban Müller, B. Goddard, A. Guerrero, W. Höfle, V. Kain, G. Rumolo, B. Salvant, E.N. Shaposhnikova, H. Timko, D. Valuch, G. Vanbavinckhove, J. Wenninger
    CERN, Geneva, Switzerland
  • E. Gianfelice-Wendt
    Fermilab, Batavia, USA
 
  An optics in the SPS with lower integer tunes (20 versus 26) was proposed and introduced in machine studies since 2010, as a measure for increasing transverse and longitudinal instability thresholds, especially at low energy, for the LHC proton beams. After two years of machine studies and careful optimisation, the new “Q20” optics became operational in September 2012 and steadily delivered beam to the LHC until the end of the run. This paper reviews the operational performance of the Q20 optics with respect to transverse and longitudinal beam characteristics in the SPS, enabling high brightness beams injected into the LHC. Aspects of longitudinal beam stability, transmission, high-energy orbit control and beam transfer are discussed.  
 
THPWO081 Design Options of a High-power Proton Synchrotron for LAGUNA-LBNO 3948
 
  • Y. Papaphilippou, J. Alabau-Gonzalvo, A. Alekou, F. Antoniou, M. Benedikt, I. Efthymiopoulos, R. Garoby, F. Gerigk, B. Goddard, C. Lazaridis, A.S. Parfenova, E.N. Shaposhnikova, R. Steerenberg
    CERN, Geneva, Switzerland
 
  Design studies have been initiated at CERN, exploring the prospects of future high-power proton beams for producing neutrinos, within the LAGUNA-LBNO project. These studies include the design of a 2 MW high-power proton synchrotron (HP-PS) using the LP-SPL as injector. This paper resumes the design options under study in order to reach this high power, and their implications regarding layout, magnet technology beam loss control and RF considerations. Optics optimization studies are also presented including beam transfer and collimation considerations.