Author: Masi, A.
Paper Title Page
MOPWO029 Remote Estimate of Collimator Jaw Damages with Sound Measurements during Beam Impacts 951
 
  • D. Deboy, O. Aberle, R.W. Aßmann, F. Carra, M. Cauchi, J. Lendaro, A. Masi, S. Redaelli
    CERN, Geneva, Switzerland
 
  Irregular hits of high-intensity LHC beams on collimators can lead to severe damage of the collimator jaws. The identification of damaged collimator jaws by observation of beam measurements is challenging: online loss measurements at the moment of the impacts can be tricky and degradation of the overall performance from single collimator damage can be difficult to measure. Visual inspections are excluded because collimator jaws are enclosed in vacuum tanks without windows. However, the sound generated during the beam impact can be used to give an estimate of the damage level. In 2012, high-intensity beam comparable to a full nominal LHC bunch at 7 TeV was shot on a tertiary type LHC collimator at the HiRadMat test facility at CERN. The paper presents results from sound recordings of this experiment.  
 
MOPWO040 Analysis of Failures of the LHC Collimators during the 2010-2013 Operation 981
 
  • S. Redaelli, A. Masi
    CERN, Geneva, Switzerland
 
  The LHC collimation system must be available in all phases of the machine operation in order to handle the high stored beam energies. The system availability is therefore crucial to achieve an efficient LHC operation. The collimation system has proved to work reliably in the first years of LHC operation, with total stored energies up to 140 MJ. The impact on the machine availability has been limited. The analysis of collimation system availability and the failure rate in the years 2012-2012 is reviewed with the aim to identify possible further improvements for the future.  
 
WEPEA042 The PS Upgrade Programme: Recent Advances 2594
 
  • S.S. Gilardoni, S. Bart Pedersen, C. Bertone, N. Biancacci, A. Blas, D. Bodart, J. Borburgh, P. Chiggiato, H. Damerau, S. Damjanovic, J.D. Devine, T. Dobers, M. Gourber-Pace, S. Hancock, A. Huschauer, G. Iadarola, L.A. Lopez Hernandez, A. Masi, S. Mataguez, E. Métral, M.M. Paoluzzi, S. Persichelli, S. Pittet, S. Roesler, C. Rossi, G. Rumolo, B. Salvant, R. Steerenberg, G. Sterbini, L. Ventura, J. Vollaire, R. Wasef, C. Yin Vallgren
    CERN, Geneva, Switzerland
  • M. Migliorati
    University of Rome "La Sapienza", Rome, Italy
 
  The LHC Injectors Upgrade project (LIU) has been initiated to improve the performances of the existing injector complex at CERN to match the future requirements of the HL-LHC. In this framework, the Proton Synchrotron (PS) will undergo fundamental changes for many of its main systems: the injection energy will be increased to reduce space-charge effects, the transverse damper will be improved to cope with transverse instabilities the RF systems will be upgraded to accelerate higher beam intensity and brightness. These hardware improvements are triggered by a series of studies meant to identify the most critical performance bottlenecks, like space charge, impedances, longitudinal and transverse instabilities, as well as electron-cloud. Additionally, alternative production schemes for the LHC-type beams have been proposed and implemented to circumvent some of the present limitations. A summary of the most recent advances of the studies, as well as the proposed hardware improvements is given.  
 
THPFI046 First Results of an Experiment on Advanced Collimator Materials at CERN HiRadMat Facility 3391
 
  • A. Bertarelli, O. Aberle, R.W. Aßmann, E. Berthomé, V. Boccone, M. Calderón Cueva, F. Carra, F. Cerutti, N. Charitonidis, C. Charrondière, A. Dallocchio, M. Donzé, P. Francon, M. Garlaschè, L. Gentini, M. Guinchard, N. Mariani, A. Masi, P. Moyret, S. Redaelli, A. Rossi, S.D.M. dos Santos
    CERN, Geneva, Switzerland
  • M. Calderón Cueva
    Universidad San Francisco de Quito, Cumbayá, Colombia
  • N. Charitonidis
    EPFL, Lausanne, Switzerland
  • L. Peroni, M. Scapin
    Politecnico di Torino, Torino, Italy
 
  Funding: The research leading to these results has received funding from the European Commission under the FP7 Research Infrastructures project EuCARD, grant agreement no. 227579
A comprehensive, first-of-its-kind experiment (HRMT-14) has been recently carried out at CERN HiRadMat facility on six different materials of interest for Beam Intercepting Devices (collimators, targets, dumps). Both traditional materials (Mo, W and Cu alloys) as well as advanced metal/diamond and metal/graphite composites were tested under extreme conditions as to pressure, density and temperature, leading to the development of highly dynamic phenomena as shock-waves, spallation, explosions. Experimental data were acquired, mostly in real time, relying on extensive embarked instrumentation (strain gauges, temperature and vacuum sensors) and on remote acquisition devices (laser Doppler vibrometer and high speed camera). The experiment was a success under all points of view in spite of the technological challenges and harsh environment. First measurements are in good agreement with results of complex simulations, confirming the effectiveness of the acquisition system and the reliability of advanced numerical methods when material constitutive models are completely available. Interesting information has been collected as to thermal shock robustness of tested materials.
 
 
THPFI059 Robustness Test of a Silicon Strip Crystal for Crystal-assisted Collimation Studies in the LHC 3427
 
  • A. Lechner, J. Blanco Sancho, F. Burkart, M. Calviani, M. Di Castro, Y. Gavrikov, J. Lendaro, F. Loprete, R. Losito, C. Maglioni, A. Masi, S. Montesano, A. Perillo-Marcone, P.S. Roguet, W. Scandale, D. Wollmann
    CERN, Geneva, Switzerland
  • J. Blanco Sancho
    EPFL, Lausanne, Switzerland
  • F. Burkart
    IAP, Frankfurt am Main, Germany
  • Y. Gavrikov
    PNPI, Gatchina, Leningrad District, Russia
  • V. Guidi, A. Mazzolari
    INFN-Ferrara, Ferrara, Italy
  • V. Guidi, A. Mazzolari
    UNIFE, Ferrara, Italy
  • W. Scandale
    LAL, Orsay, France
 
  Over the past years, the UA9 experiment has successfully demonstrated the viability of enhancing the collimation efficiency of proton and ion beams in the SPS by means of bent crystals. An extension of UA9 to the LHC has been recently approved. The conditions imposed by the LHC operational environment, in particular the tremendous energy density of the beam, require a reliable understanding of the crystal integrity in view of potential accident scenarios such as an asynchronous beam dump. For this purpose, irradiation tests have been performed at the CERN-HiRadMat facility to examine the mechanical strength of a silicon strip crystal in case of direct beam impact. The tests were carried out using a 440 GeV proton beam of 0.5 mm transverse size. The crystal, 3 mm long in beam direction, was exposed to a total of 2*1014 protons, with individual pulse intensities reaching up to 3*1013. First visual inspections reveal no macroscopic damage to the crystal. Complementary post-irradiation tests are foreseen to assess microscopic lattice damage as well as the degradation of the channelling efficiency.
On behalf of the UA9 Collaboration.
 
 
THPWO078 Status of the Upgrade of the CERN PS Booster 3939
 
  • K. Hanke, O. Aberle, M. E. Angoletta, W. Bartmann, S. Bartolome, E. Benedetto, C. Bertone, A. Blas, P. Bonnal, J. Borburgh, D. Bozzini, A.C. Butterworth, C. Carli, E. Carlier, J.R.T. Cole, P. Dahlen, M. Delonca, T. Dobers, A. Findlay, R. Froeschl, J. Hansen, D. Hay, S. Jensen, J.-M. Lacroix, P. Le Roux, L.A. Lopez Hernandez, C. Maglioni, A. Masi, G.W. Mason, S.J. Mathot, B. Mikulec, Y. Muttoni, A. Newborough, D. Nisbet, S. Olek, M.M. Paoluzzi, A. Perillo-Marcone, S. Pittet, B. Puccio, V. Raginel, B. Riffaud, I. Ruehl, A. Sarrió Martínez, J. Tan, B. Todd, V. Venturi, W.J.M. Weterings
    CERN, Geneva, Switzerland
 
  The CERN PS Booster (PSB) is presently undergoing an ambitious consolidation and upgrade program within the frame of the LHC Injectors Upgrade (LIU) project. This program comprises a new injection scheme for H ions from CERN’s new Linac4, the replacement of the main RF systems and an energy upgrade of the PSB rings from 1.4 to 2.0 GeV which includes the replacement of the main magnet power supply as well as the upgrade of the extraction equipment. This paper describes the status and plans of this work program.