Author: Enami, K.
Paper Title Page
MOOBC02 Status of Main Linac Cryomodule Development for Compact ERL Project 67
 
  • K. Umemori, K. Enami, T. Furuya, H. Sakai, M. Satoh, K. Shinoe
    KEK, Ibaraki, Japan
  • E. Cenni
    Sokendai, Ibaraki, Japan
  • M. Sawamura
    JAEA, Ibaraki-ken, Japan
 
  The Compact ERL, which is a test facility of ERL, is under construction at KEK, in Japan. For the main linac, one cryomodule, containing two 9-cell superconducting cavities, is under development. The cryomodule has been designed under High Pressure Gas Safety Code in Japan. Thermal design and cavity alignment have been also carefully considered. Two 9-cell cavities were already fabricated and their performances were confirmed by vertical tests. They satisfied ERL main linac specifications. Their accelerating field reached to 25 MV/m, without field limits. Two input couplers, three HOM absorbers and two Slide-Jack tuners are also under fabrication for the cryomodule. High power processing will be applied for input couplers, at a test stand using a 300 kW klystron. Cooling tolerance and HOM damping abilities were tested for HOM absorbers. Some performance studies were also applied for the tuner at room temperature condition. Cryomodule assembly is planned on this summer. After cooling tests and high power tests will be carried out, ERL beam operation will be started.  
slides icon Slides MOOBC02 [3.849 MB]