Author: Chase, B.
Paper Title Page
MOOAC02 Status and Plans for a Superconducting RF Accelerator Test Facility at Fermilab 58
 
  • J.R. Leibfritz, R. Andrews, C.M. Baffes, K. Carlson, B. Chase, M.D. Church, E.R. Harms, A.L. Klebaner, M.J. Kucera, A. Martinez, S. Nagaitsev, L.E. Nobrega, J. Reid, M. Wendt, S.J. Wesseln
    Fermilab, Batavia, USA
  • P. Piot
    Northern Illinois University, DeKalb, Illinois, USA
 
  Funding: Operated by Fermi Research Alliance, LLC, under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy.
The Advanced Superconducting Test Acccelerator (ASTA) is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, multiple downstream beamlines for testing diagnostics and conducting various beam tests, and a high power beam dump. When completed, it is envisioned that this facility will initially be capable of generating a 750 MeV electron beam with ILC beam intensity. An expansion of this facility was recently completed that will provide the capability to upgrade the accelerator to a total beam energy of 1.5 GeV. Two new buildings were also constructed adjacent to the ASTA facility to house a new cryogenic plant and multiple superconducting RF (SRF) cryomodule test stands. In addition to testing accelerator components, this facility will be used to test RF power systems, instrumentation, and control systems for future SRF accelerators such as the ILC and Project-X. This paper describes the current status and overall plans for this facility.
 
slides icon Slides MOOAC02 [13.423 MB]  
 
WEPPC059 A Two-stage Injection-locked Magnetron for Accelerators with Superconducting Cavities 2348
 
  • G.M. Kazakevich, G. Flanagan, R.P. Johnson, F. Marhauser, M.L. Neubauer
    Muons, Inc, Batavia, USA
  • B. Chase, S. Nagaitsev, R.J. Pasquinelli, N. Solyak, V. Tupikov, D. Wolff, V.P. Yakovlev
    Fermilab, Batavia, USA
 
  Funding: Supported in part by SBIR Grant 4743 11SC06261
A concept for a two-stage injection-locked CW magnetron intended to drive Superconducting Cavities (SC) for intensity-frontier accelerators has been proposed. The concept is based on a theoretical model that considers a magnetron as a forced oscillator; the model has been experimentally verified with a 2.5 MW pulsed magnetron. The two-stage CW magnetron can be used as a RF power source for Fermilab’s Project-X to feed separately each of the SC of the 8 GeV pulsed linac. For Project-X the 1.3 GHz two-stage magnetron with output power of 20-25 kW and expected output/input power ratio of about 35-40 dB would operate in a quasi-CW mode with a pulse duration ≤ 10 ms and repetition rate of 10 Hz. The magnetrons for both stages should be based on the commercial prototypes to decrease the cost of the system. An experimental model of the two-stage CW S-band magnetron with peak power of 1 kW, with pulse duration of 1-10 ms, has been developed and built for study. A description of the theoretical and experimental models, simulations, and experimental results are presented and discussed in this work.
 
 
WEPPC060 A High-power 650 MHz CW Magnetron Transmitter for Intensity Frontier Superconducting Accelerators 2351
 
  • G.M. Kazakevich, G. Flanagan, R.P. Johnson, F. Marhauser, M.L. Neubauer
    Muons, Inc, Batavia, USA
  • B. Chase, S. Nagaitsev, R.J. Pasquinelli, V.P. Yakovlev
    Fermilab, Batavia, USA
  • T.A. Treado
    CPI, Beverley, Massachusetts, USA
 
  A concept of a 650 MHz CW magnetron transmitter with fast control in phase and power, based on two-stage injection-locked CW magnetrons, has been proposed to drive Superconducting Cavities (SC) for intensity-frontier accelerators. The concept is based on a theoretical model considering a magnetron as a forced oscillator and experimentally verified with a 2.5 MW pulsed magnetron. To fulfill fast control of phase and output power requirements of SC accelerators, both two-stage injection-locked CW magnetrons are combined with a 3-dB hybrid. Fast control in output power is achieved by varying the input phase of one of the magnetrons. For output power up to 250 kW we expect the output/input power ratio to be about 35 to 40 dB in CW or quasi-CW mode with long pulse duration. All magnetrons of the transmitter should be based on commercially available models to decrease the cost of the system. An experimental model using 1 kW, CW, S-band, injection-locked magnetrons with a 3-dB hybrid combiner has been developed and built for study. A description of the model, simulations, and experimental results are presented and discussed in this work.  
 
THPPP062 The Six-Cavity Test - Demonstrated Acceleration of Beam with Multiple RF Cavities and a Single Klystron 3877
 
  • J. Steimel, J.-P. Carneiro, B. Chase, S. Chaurize, E. Cullerton, B.M. Hanna, R.L. Madrak, R.J. Pasquinelli, L.R. Prost, L. Ristori, V.E. Scarpine, P. Varghese, R.C. Webber, D. Wildman
    Fermilab, Batavia, USA
 
  Funding: Operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy.
The High Intensity Neutrino Source (HINS) ‘Six-Cavity Test’ has demonstrated the use of high power RF vector modulators to control multiple RF cavities driven by a single high power klystron to accelerate a non-relativistic beam. Installation of 6 cavities in the existing HINS beamline has been completed and beam measurements have started. We present data showing the energy stability of the 7 mA proton beam accelerated through the six cavities from 2.5 MeV to 3.4 MeV.
 
 
THPPR012 Lorentz Force Compensation for Long Pulses in SRF Cavities 3990
 
  • Y.M. Pischalnikov, G.I. Cancelo, B. Chase, D.J. Crawford, D.R. Edstrom, Jr, E.R. Harms, R.A. Kostin, W. Schappert, N. Solyak
    Fermilab, Batavia, USA
 
  Lorentz force compensation of 8ms pulses in Tesla style elliptical cavities has been studied in Fermilab SRF Test Facility. Detuning measurements and compensation results are presented.