Paper | Title | Page |
---|---|---|
MOBPL02 | TANGO Kernel Development Status | 27 |
|
||
Funding: On behalf of the TANGO Controls Collaboration The TANGO Controls Framework continues to improve. This paper will describe how TANGO kernel development has evolved since the last ICALEPCS conference. TANGO kernel projects source code repositories have been transferred from subversion on Sourceforge.net to git on GitHub.com. Continuous integration with Travis CI and the GitHub pull request mechanism should foster external contributions. Thanks to the TANGO collaboration contract, parts of the kernel development and documentation have been sub-contracted to companies specialized in TANGO. The involvement of the TANGO community helped to define the roadmap which will be presented in this paper and also led to the introduction of Long Term Support versions. The paper will present how the kernel is evolving to support pluggable protocols - the main new feature of the next major version of TANGO. |
||
![]() |
Talk as video stream: https://youtu.be/t6L6hj0rNDc | |
![]() |
Slides MOBPL02 [5.754 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-ICALEPCS2017-MOBPL02 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THCPL05 | TANGO Heads for Industry | 1195 |
|
||
The TANGO Controls Framework* continues to mature and be adopted by new sites and applications. This paper will describe how TANGO has moved closer to industry with the creation of startups and addressing industrial use cases. It will describe what progress has been made since the last ICALEPCS in 2015 to ensure the sustainability of TANGO for scientific and industrial users. It will present TANGO web based technologies and the deployment of TANGO in the cloud. Furthermore it will describe how the community has re-organised itself to fund and improve code sharing, documentation, code quality assurance and maintenance.
* http://tango-controls.org |
||
![]() |
Talk as video stream: https://youtu.be/O-_JLDN4BSg | |
![]() |
Slides THCPL05 [9.769 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-ICALEPCS2017-THCPL05 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
FRAPL07 | The ESRF's Extremely Brilliant Source - a 4th Generation Light Source | 2010 |
|
||
After 20 years of operation, the ESRF has embarked upon an extremely challenging project - the Extremely Brilliant Source (ESRF - EBS) . The goal of this project is to construct a 4th generation light source storage ring inside the existing 844m long tunnel. The EBS will increase the brilliance and coherence by a factor of 100 with respect to the present ESRF storage ring. A major challenge is to keep the present ring operating 24x7 while designing and pre-constructing all the elements of the new ring. This is the first time a 4th generation light source will be constructing inside an existing tunnel. This paper concentrates on the control system aspects. The control system is 100% TANGO based. The paper will list the main challenges of the new storage ring like the Hot Swap Powersupply, the new timing system, how reliable operation was maintained while modernizing the injector control system and preparing the new storage ring control system, the new historical database, and how extensive use was made of software simulators achieve this.
http://www.esrf.fr/files/live/sites/www/files/about/upgrade/documentation/whitepaper-upgrade-phaseII.pdf P. Raimondi, "The ESRF Low Emittance Upgrade", IPAC'16, , Busan, Korea, May 2016, Paper WEXA01 |
||
![]() |
Talk as video stream: https://youtu.be/Wtocf0pieP0 | |
![]() |
Slides FRAPL07 [9.634 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-ICALEPCS2017-FRAPL07 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |