Keyword: niobium
Paper Title Other Keywords Page
TUPD21 AC Coupling Studies and Circuit Model for Loss Monitor Ring background, ion, coupling, simulation 455
 
  • Z. Liu, J.L. Crisp, S.M. Lidia
    FRIB, East Lansing, Michigan, USA
 
  Funding: This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661, the State of Michigan and Michigan State University.
As a follow-up study to the initial design of FRIB Loss Monitor Ring (previously named Halo Monitor Ring [1]), we present recent results of coupling studies between the FRIB CW beam and the Loss Monitor Ring (LMR). While a ~33 kHz low-pass filter was proposed to attenuate high-frequency AC-coupled signals [1,2], the LMR current signal may still contain low frequency signals induced by the un-intercepted beam, for example, by the 50μs beam notch that repeats every 10ms. We use CST Microwave Studio to simulate the AC response of a Gaussian source signal and benchmarked it to analytical model. A circuit model for beam-notch-induced AC signal is deduced and should put a ~33pA (peak) bipolar pulse on the LMR at 100Hz repetition rate. Although its amplitude falls into our tolerable region, we could consider an extended background integration to eliminate this effect.
 
poster icon Poster TUPD21 [1.201 MB]  
Export • reference for this paper to ※ LaTeX, ※ Text, ※ IS/RefMan, ※ EndNote (xml)  
 
WECZB1 A SQUID-Based Beam Current Monitor for FAIR/CRYRING pick-up, electronics, cryogenics, ion 510
 
  • R. Geithner, T. Stöhlker
    IOQ, Jena, Germany
  • R. Geithner, T. Stöhlker
    HIJ, Jena, Germany
  • F. Kurian, H. Reeg, M. Schwickert, T. Stöhlker
    GSI, Darmstadt, Germany
  • R. Neubert, P. Seidel
    FSU Jena, Jena, Germany
 
  A SQUID-based beam current monitor was developed for the upcoming FAIR-Project, providing a non-destructive online monitoring of the beam currents in the nA-range. The Cryogenic Current Comparator (CCC) was optimized for a lowest possible noise-limited current resolution together with a high system bandwidth. This CCC should be installed in the CRYRING facility, working as a test bench for FAIR. In this contribution we present results of the completed CCC for FAIR/CRYRING and also arrangements that have been done for the installation of the CCC at CRYRING, regarding the cryostat design.  
slides icon Slides WECZB1 [6.109 MB]  