Author: Scarpine, V.E.
Paper Title Page
TUO1C06 Instrumentation Developments and Beam Studies for the Fermilab Proton Improvement Plan Linac Upgrade and New RFQ Front-End 315
 
  • V.E. Scarpine, D.S. Bollinger, K.L. Duel, N. Eddy, P.R. Karns, N. Liu, W. Pellico, A. Semenov, C.-Y. Tan, R.E. Tomlin
    Fermilab, Batavia, USA
 
  Funding: This work was supported by the U.S. Department of Energy under contract No. DE-AC02-07CH11359.
Fermilab is developing a Proton Improvement Plan (PIP) to increase throughput of it's the proton source. The plan addresses hardware modifications to increase repetition rate and improve beam loss while ensuring viable operation of the proton source through 2025. The first phase of the PIP will enable the Fermilab proton source to deliver 1.8·1017 protons per hour by mid-2013. As part of this initial upgrade, Fermilab plans to install a new front-end consisting of dual H ion sources and a 201 MHz pulsed RFQ. This talk will present beam studies measurements of this new front-end as well as present new beam instrumentation upgrades for the Fermilab linac.
 
slides icon Slides TUO1C06 [2.546 MB]  
 
WEO3B03 PXIE at FNAL 414
 
  • N. Solyak, C.M. Baffes, A.Z. Chen, Y.I. Eidelman, B.M. Hanna, S.D. Holmes, V.A. Lebedev, S. Nagaitsev, J.-F. Ostiguy, R.J. Pasquinelli, D.W. Peterson, L.R. Prost, G.W. Saewert, A. Saini, V.E. Scarpine, A.V. Shemyakin, D. Sun, V.P. Yakovlev
    Fermilab, Batavia, USA
 
  PXIE is the integrated systems test for the Project X frontend. It is expected to accelerate 1-2 mA CW beam up to 30 MeV. The major goal of the project is a validation of the Project X concept and elimination of technical risks. It is expected to be constructed in the period of 2012-2016. In presentation the conceptual design of the experimental test facility, lattice and beam dynamics studies will be discussed in details.  
slides icon Slides WEO3B03 [4.561 MB]  
 
FRO1B02 Qinclosing Plenary Summary of Working Group E:Diagnostics and Instrumentation for High-Intensity Beams 625
 
  • R. Dölling
    PSI, Villigen PSI, Switzerland
  • N. Hayashi
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken, Japan
  • V.E. Scarpine
    Fermilab, Batavia, USA
 
  Working Group E Summary: Working group E was charged with presentations and discussions on diagnostics and instrumentation of high intensity beams. We had 2 sessions, consisting of a total of 12 talks, each of 20 minutes for presentation followed by some discussion. One session was followed by a discussion session of two hours. All sessions took place in parallel with the sessions of WG-D (Commissioning, operations and performance), inevitably preventing some possibly useful overlap. In addition, seven posters, regarding beam diagnostics, were presented in the single poster session.  
slides icon Slides FRO1B02 [18.507 MB]