Paper | Title | Page |
---|---|---|
PLT006 |
Recent Progress in Superconducting Cavity Production | |
|
||
Overview of recent progress on superconducting cavity production and high gradient performance in 1.3 GHz 9-cell cavities for ILC is presented and discussed. | ||
![]() |
Slides PLT006 [6.123 MB] | |
WG3005 |
Progress of cERL injector cavities at KEK | |
|
||
The injector cryomodule for cERL is under developing at KEK. This cryomodule with three L-band 2-cell cavities will be constructed until March 2012. Three L-band 2-cell cavities with five HOM couplers for this module were fabricated at May 2011. Now, these cavities are under testing by vertical test, and the feedthoughs with high thermal conductivity are also under developing for HOM couplers using by these tests to achieve 15 MV/m operation at CW in cryomodule. The results of vertical test for three 2-cell cavities with HOM pick-up probes will be reported in this paper. | ||
![]() |
Slides WG3005 [0.902 MB] | |
WG3046 |
Tuner Performance in S1-G Cryomodule | |
|
||
![]() |
Slides WG3046 [3.013 MB] | |
WG3052 |
High Power Input Couplers for cERL Injector | |
|
||
![]() |
Slides WG3052 [3.275 MB] | |