Author: Waldschmidt, G.J.
Paper Title Page
TUPMF003 Dynamic Tuning of the APS-U Booster 5-cell Cavities 1251
 
  • G.J. Waldschmidt, M. Abliz, T.G. Berenc, D. Horan, U. Wienands
    ANL, Argonne, Illinois, USA
 
  The booster synchrotron for the APS-U is being upgraded to accommodate high-charge bunches, up to 20 nC, for extraction into the MBA lattice. The booster is required to operate at 85% efficiency in order to achieve bunch swap-out into the storage ring. In order to compensate for significant beam-loading effects as well as support a frequency ramp to achieve higher efficiency, a ferrite tuner is being considered to dynamically adjust the cavity frequency. A tuner design will be presented that spans 60 kHz and utilizes a low-loss YIG garnet similar to that used in the Recycler Ring at Fermilab.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPMF003  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPMF010 A Conceptual Design of a Compact Wakefield Accelerator for a High Repetition Rate Multi User X-ray Free-Electron Laser Facility 1266
 
  • A. Zholents, D.S. Doran, W.G. Jansma, M. Kasa, R. Kustom, J.G. Power, N.O. Strelnikov, K.J. Suthar, E. Trakhtenberg, I. Vasserman, G.J. Waldschmidt, J.Z. Xu
    ANL, Argonne, Illinois, USA
  • S. Baturin
    Enrico Fermi Institute, University of Chicago, Chicago, Illinois, USA
  • H. Perez
    IIT, Chicago, Illinois, USA
 
  Funding: Supported by U.S. Department of Energy, Office of Science, under Contract No. DE-AC02-06CH11357
A preliminary design of a collinear wakefield accelerator is described. It is assumed that the array of such accelerators will play a central role in a free-electron laser-based x-ray user facility under consideration at Argonne National Laborator [1].
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPMF010  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPML009 Design and Test Plan for a Prototype Corrugated Waveguide 1550
 
  • G.J. Waldschmidt, D.S. Doran, G. Ha, R. Kustom, A. Nassiri, J.G. Power, A. Zholents
    ANL, Argonne, Illinois, USA
  • A.E. Siy
    UW-Madison/PD, Madison, Wisconsin, USA
 
  A cylindrical, corrugated wakefield accelerating structure with a 1 mm radius bore is being designed to facilitate sub-terahertz Čerenkov radiation produced by an elec-tron bunch propagating along the waveguide. A 220 GHz axial mode for the wakefield is being considered. The waveguide is being optimized to maximize the trailing wakefield potential while maintaining a ratio of the trail-ing potential to the peak decelerating voltage in the bunch, or transformer ratio, of approximately 5 for the door step peak current distribution [1]. In order to evalu-ate the manufacturing tolerances and perform rf and electron beam testing of the waveguide, a 21 GHz proto-type waveguide structure will be built consisting of re-configurable parts allowing modelling of various fabrica-tion errors. Measurements with an electron beam will be performed at the Argonne Wakefield Accelerator (AWA) test facility. Analysis of the experimental layout has been performed.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPML009  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPAF007 A Scheme for Asynchronous Operation of the APS-U Booster Synchrotron 1823
 
  • U. Wienands, T.G. Berenc, T. Fors, F. Lenkszus, N. Sereno, G.J. Waldschmidt
    ANL, Argonne, Illinois, USA
 
  Funding: Work supported by US DOE
The APS-U 6-GeV MBA storage ring will have 42 pm beam emittance and relatively tight acceptance. This requires limiting the beam emittance out of the Booster synchrotron which is achieved by operating the Booster off-momentum, thus manipulating the damping partitions. However, the much higher charge for the APS-U strongly favors injecting on momentum into the Booster for maximum acceptance. An rf-frequency ramping scheme is proposed to allow injecting on momentum and then moving the beam off momentum. The ramp is adjusted from cycle to cycle to vary the total time taken by the beam from injection to extraction, thus aligning the Booster bunch with any chosen MBA storage ring bucket. The two rf systems will not be locked at any time of the cycle. The proposed scheme is compatible with the existing synchronization of the APS injector cycle to the 60-Hz line voltage which induces a variation in the start time of the acceleration cycle. The scheme removes the need to realign the Booster ring for total path length while optimizing its operation for high charge acceleration. A ferrite tuner is being considered for dynamic tuning of the rf cavities.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPAF007  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMF005 Design and Testing of a 12 kW, 352 MHz Solid State rf System at the Advanced Photon Source 2378
 
  • D. Horan, D.J. Bromberek, A. Goel, T.J. Madden, A. Nassiri, G.J. Waldschmidt
    ANL, Argonne, Illinois, USA
 
  A 12 kW, 352 MHz rf power amplifier system was designed and constructed at the Advanced Photon Source as a research and development test bed for eventual development of a 200 kW cw rf system capable of supporting accelerator beam operation. The system utilizes six 2 kW laterally diffused metal oxide field effect transistor (MOSFET) rf amplifiers, an output cavity combiner terminated with a WR2300 waveguide output flange, and a monitoring system based on programmable logic controller technology. The combining cavity has a total capacity of 108 two-kilowatt inputs to support eventual operation up to 216kW maximum output power. Design details and operational performance of the 12 kW system will be discussed.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPMF005  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)