Author: Schwarz, M.
Paper Title Page
TUPAF088 Final factory-side Measurements of the Next SC CH-Cavities for the HELIAC-Project 943
 
  • M. Basten, M. Busch, H. Podlech, M. Schwarz
    IAP, Frankfurt am Main, Germany
  • K. Aulenbacher, W.A. Barth, V. Gettmann, T. Kürzeder, M. Miski-Oglu
    HIM, Mainz, Germany
  • W.A. Barth, F.D. Dziuba, M. Heilmann, S. Yaramyshev
    GSI, Darmstadt, Germany
 
  Funding: Work supported by the EU Framework Programme H2020 662186 (MYRTE); Work supported by BMBF Contr. No. 05P15RFBA;
The upcoming FAIR project (Facility for Antiproton and Ion Research) at GSI will use the existing UNILAC (UNIversal Linear Accelerator) as an injector to provide high intensity heavy ion beams at low repetition rates. As a consequence a new superconducting (sc) continous wave (cw) high intensity heavy ion Linac is required to provide ion beams above the coulomb barrier to keep the Super Heavy Element (SHE) physics program at GSI competitive on an international level. The fundamental Linac design comprises a high performance ion source, the High Charge State Injector (HLI) upgraded for cw-operation and a matching line (1.4 MeV/u) followed by a sc Drift Tube Linac (DTL). Four cryo modules each equipped with three Crossbar-H-mode (CH) structures provide for acceleration up to 7.3 MeV/u. The first section of this ambitious accelerator project has been successfully commissioned and tested with heavy ion beam from the HLI in 2017. It comprises two sc 9.3 T solenoids and a sc 217 MHz CH-cavity with 15 equidistant gaps as a demonstrator. The construction of the next two sc 217 MHz 8 gap CH-cavities is nearly finished and final factory-side measurements will be presented.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF088  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAK002 Advanced Approach for Beam Matching along the Multi-Cavity SC CW Linac at GSI 955
 
  • S. Yaramyshev, W.A. Barth, M. Heilmann
    GSI, Darmstadt, Germany
  • K. Aulenbacher
    IKP, Mainz, Germany
  • K. Aulenbacher, W.A. Barth, V. Gettmann, T. Kürzeder, M. Miski-Oglu
    HIM, Mainz, Germany
  • M. Basten, M. Busch, H. Podlech, M. Schwarz
    IAP, Frankfurt am Main, Germany
 
  A multi-stage program for the development of a heavy ion superconducting (sc) continuous wave (cw) linac is in progress at HIM (Mainz, Germany) and GSI (Darmstadt, Germany) under support of IAP (Frankfurt, Germany). In 2017 the first section of the CW-Linac has been successfully commissioned at GSI. Beam acceleration at the CW-Linac is foreseen to be performed by up to twelve multi-gap CH cavities. The linac should provide the beam for physics experiments, smoothly varying the output particle energy from 3.5 to 7.3 MeV/u, simultaneously keeping high beam quality. Due to a wide variation of the input- and output -beam energy for each cavity, a longitudinal beam matching to every cavity is of high importance. An advanced algorithm for an optimization of matched beam parameters under variable rf-voltage and rf-phase of each cavity has been developed. The description of the method and the obtained results are presented in the paper.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAK002  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAK003 Beam Dynamics Simulations for the New Superconducting CW Heavy Ion LINAC at GSI 959
 
  • M. Schwarz, M. Basten, M. Busch, H. Podlech
    IAP, Frankfurt am Main, Germany
  • K. Aulenbacher
    IKP, Mainz, Germany
  • K. Aulenbacher, W.A. Barth, F.D. Dziuba, V. Gettmann, T. Kürzeder, M. Miski-Oglu
    HIM, Mainz, Germany
  • W.A. Barth, M. Heilmann, A. Rubin, A. Schnase, S. Yaramyshev
    GSI, Darmstadt, Germany
 
  Funding: Work supported by BMBF Contr. No. 05P15RFBA and EU Framework Programme H2020 662186 (MYRTE)
For future experiments with heavy ions near the coulomb barrier within the super-heavy element (SHE) research project a multi-stage R&D program of GSI/HIM and IAP is currently in progress. It aims for developing a supercon-ducting (sc) continuous wave (CW) LINAC with multiple CH cavities as key components downstream the High Charge State Injector (HLI) at GSI. The LINAC design is challenging due to the requirement of intense beams in CW mode up to a mass-to-charge ratio of 6, while covering a broad output energy range from 3.5 to 7.3 MeV/u with unchanged minimum energy spread. Testing of the first CH-cavity in 2016 demonstrated a promising maximum accelerating gradient of Ea = 9.6 MV/m; the worldwide first beam test with this sc multi-gap CH-cavity in 2017 was a milestone in the R&D work of GSI/HIM and IAP. In the light of experience gained in this research so far, the beam dynamics layout for the entire LINAC has recently been updated and optimized.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAK003  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAK004 Superconducting CH-Cavity Heavy Ion Beam Testing at GSI 962
 
  • W.A. Barth, M. Heilmann, A. Rubin, A. Schnase, S. Yaramyshev
    GSI, Darmstadt, Germany
  • K. Aulenbacher
    IKP, Mainz, Germany
  • K. Aulenbacher, F.D. Dziuba, V. Gettmann, T. Kürzeder, M. Miski-Oglu
    HIM, Mainz, Germany
  • M. Basten, M. Busch, H. Podlech, M. Schwarz
    IAP, Frankfurt am Main, Germany
 
  Recently the first section of a standalone superconducting (sc) continuous wave (cw) heavy ion Linac as a demonstration of the capability of 217 MHz multi gap Crossbar H-mode structures (CH) has been commissioned and extensively tested with beam from the GSI- High Charge State Injector. The demonstrator set up reached acceleration of heavy ions up to the design beam energy and beyond. The required acceleration gain was achieved with heavy ion beams even above the design mass to charge ratio at high beam intensity and full beam transmission. This contribution presents systematic beam measurements with varying RF-amplitudes and phases of the CH-cavity, as well as versatile phase space measurements for heavy ion beams with different mass to charge ratio. The worldwide first and successful beam test with a superconducting multi gap CH-cavity is a milestone of the R&D work of Helmholtz Institute Mainz (HIM) and GSI in collaboration with Goethe University Frankfurt (GUF) in preparation of the sc cw heavy ion Linac project and other cw-ion beam applications.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAK004  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPML040 Further Tests on the Final State of the SC 325 MHz CH-Cavity and Coupler Test Bench Update 2783
 
  • M. Busch, M. Basten, J. List, P. Müller, H. Podlech, M. Schwarz
    IAP, Frankfurt am Main, Germany
  • W.A. Barth, J. List
    GSI, Darmstadt, Germany
  • W.A. Barth
    HIM, Mainz, Germany
  • W.A. Barth
    MEPhI, Moscow, Russia
 
  Funding: Work supported by BMBF Contr. No. 05P15RFBA
At the Institute for Applied Physics, Goethe-University Frankfurt, a sc 325 MHz CH-cavity has been developed and successfully tested up to 14.1 mV/m and has now reached the final production stage with the helium vessel welded to the frontal joints of the cavity and final processing steps have been performed. Further tests in a vertical and horizontal environment are being prepared for intensive studies. This cavity is a prototype for envisaged beam tests with a pulsed ion beam at 11.4 AMeV. In this contribution the results of the performed RF tests are being presented. Furthermore, first measurements of the recently installed 217 MHz coupler test bench are shown.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPML040  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPAF083 LINAC-Multitool - an Open Source Java-Toolkit 3179
 
  • M. Schwarz, D. Bade, J. Corbet, H. Podlech
    IAP, Frankfurt am Main, Germany
 
  Funding: Work supported by BMBF contr. No. 05P15RFRBA and HIC for FAIR.
Dedicating more precious time to advanced research instead of spending it towards time-consuming routine tasks is a desirable goal in particle accelerator simulation and development. Requirements engineering was started at IAP in order to identify routine processes at our institute's R&D that can be automated or simplified. Results indicated that there were several areas to consider: Bead pull measurements, data processing and visualization for the beam dynamics code LORASR, CST field map processing for the use with TraceWin, conversion between different particle distribution data formats and more. Subsequently development of the LINAC-Multitool started to rationalize these processes and replace preexisting scripts also to ensure consistency of results and increase transparency and reliability of computation. In order to guarantee maintainability, expandability and platform independence, LINAC-Multitool is programmed using Java and will be open source. This contribution presents the current state of development.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPAF083  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)