Status of the FAIR Project |
63 |
|
- P.J. Spiller, M. Bai, O. Boine-Frankenheim, A. Dolinskyy, F. Hagenbuck, C.M. Kleffner, K. Knie, S. Menke, C. Omet, A. Schuhmann, H. Simon, M. Winkler
GSI, Darmstadt, Germany
- J. Blaurock, M. Ossendorf
FAIR, Darmstadt, Germany
- I. Koop
BINP SB RAS, Novosibirsk, Russia
- D. Prasuhn, R. Tölle
FZJ, Jülich, Germany
|
|
|
The realization of the new Facility for Antiproton and Ion Research, FAIR at GSI, Germany, has advanced significantly. The civil construction process of the Northern part of the building complex, including the excavation of the SIS100 synchrotron tunnel has been launched end of 2017. On site of the GSI campus, major preparations and upgrade measures for the injector operation of the existing accelerator facilities are ongoing and will be completed mid of 2018. The shielding of the SIS18 accelerator tunnel has been enhanced for the booster operation at high repetition rates and high intensity Proton beams. Two new transformer stations were set-up and commissioned which will provide the required pulse and common power for FAIR. All major contracts for series production of SIS100 components have been signed and a large number of the superconducting SIS100 magnets has been produced and accepted. Major testing infrastructures for superconducting magnets of SIS100 and Super-FRS have been set-up at JINR, CERN and GSI. Also for all other FAIR accelerator systems, the procurement of the components is progressing well
|
|
|
Slides MOZGBF2 [4.266 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-MOZGBF2
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPAF083 |
SIS100 Tunnel Design and Civil Construction Status |
927 |
|
- C. Omet, J. Falenski, H. Kisker, K. Konradt, P.J. Spiller
GSI, Darmstadt, Germany
- A. Fischer
FAIR, Darmstadt, Germany
|
|
|
As the FAIR Project is proceeding, building designs have been frozen and the according work packages tendered. For the future FAIR main driver accelerator, SIS100, the 1.1 km long accelerator tunnel "T110", has been planned 17 m deep under ground. In this article, environmental boundary conditions, the chosen layout and the current status of civil construction is presented.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF083
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPAF085 |
Status of Link Existing Facility Project for FAIR |
934 |
|
- J. Stadlmann, C. Omet, A. Schuhmann, P.J. Spiller
GSI, Darmstadt, Germany
|
|
|
The project "Link existing Facility", or GaF (GSI Anbindung an FAIR), is an important subproject of the overall FAIR facility. In order to serve as injector for SIS100, the main accelerator of FAIR, the existing GSI synchrotron SIS18 is undergoing an upgrade program leading to about 100 times higher beam intensities. Especially the foreseen operation with 4 GeV Protons with up to 5·1012 protons per second increases the radiation protection requirements to such an extent that the existing radiation protection measures are no longer sufficient. The project consists of 78 individual measures. The four most substantial activities are the construction of a table-like structure to carry additional shielding. The creation of an opening and a first part of transfer tunnel for the beamlines towards the future FAIR campus. The preparation for the building, beam dump and connection of the FAIR proton injector. The incorporation of state-of-the-art radiation- and fire-protection measures into the present facilities including the a new technical building to house technical infrastructure. We report on the project status which is foreseen to finish mid-2018.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF085
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPML030 |
First Tests of the Main Quadrupole and Corrector Magnets for the SIS100 Synchrotron of FAIR |
2751 |
|
- E.S. Fischer, A. Bleile, V.I. Datskov, V.M. Marusov, J.P. Meier, C. Omet, P.J. Spiller, K. Sugita
GSI, Darmstadt, Germany
- P.G. Akishin, V.V. Borisov, H.G. Khodzhibagiyan, S.A. Kostromin, D.N. Nikiforov, M.M. Shandov, A.V. Shemchuk
JINR, Dubna, Moscow Region, Russia
|
|
|
The heavy ion synchrotron SIS100 is the main accelerator of the FAIR complex (Facility for Antiproton and Ion Research) in Darmstadt, Germany. Currently the construction site and facility are advancing fast. The series production of the main dipoles was already started in 2017. In parallel, the first two quadrupoles, a chromaticity sextupole and a steerer were built and tested in cooperation between GSI and JINR at the cryogenic test facility in Dubna. We present the operation performance of these two first of series quadrupole units (consisting both of a corrector magnet mechanically and hydraulically combined with a quadrupole). Besides the thermal stability of the fast ramped superconducting magnets special attention is directed to their magnetic field properties. The obtained results provide the basis for starting the series production of all SIS100 quadrupole and corrector magnets in 2018.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-WEPML030
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPML035 |
Superconducting Dipoles for SIS100 |
2768 |
|
- C. Roux, P. Aguar Bartolome, A. Bleile, E.S. Fischer, G. Golluccio, F. Kaether, J. Ketter, J.P. Meier, A. Mierau, C. Omet, P.J. Spiller, K. Sugita, P.B. Szwangruber, A. Warth, H.G. Weiss
GSI, Darmstadt, Germany
|
|
|
The international facility for antiproton and ion research (FAIR) is currently being developed in Darmstadt, Germany, for fundamental research in various fields of modern physics. Its main accelerator, the SIS100 heavy ion synchrotron, utilizes fast-cycling superconducting magnets operated at cryogenic temperatures. An intense measurement program of first of series (FoS) module revealed excellent behaviour with respect to, e.g., quench performance and AC losses. With an optimized fabrication technique, the geometrical accuracy was improved to be sufficient to provide a highly homogeneous field. Consequently, the series production of 110 dipoles was released. First significant results on the reproducibility and the variation of physical properties along the series production gained at the test facility of GSI are presented.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-WEPML035
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|