Author: Makarov, A.V.
Paper Title Page
WEPML009 Superconducting Magnet Performance in LCLS-II Cryomodules 2693
 
  • V.S. Kashikhin, S. Cheban, J. DiMarco, E.R. Harms, A.V. Makarov, T. Strauss, M.A. Tartaglia
    Fermilab, Batavia, Illinois, USA
 
  Abstract' New LCLS-II Linear Superconducting Accelerator Cryomodules under construction at Fermilab. Inside each SCRF Cryomodule installed superconducting magnet package to focus and steer an electron beam. The magnet package has the iron dominated configuration with racetrack type quadrupole and dipole conductively cooled coils. For easier installation the magnet could be split in the vertical plane. Initially the magnet was tested in a liquid helium bath, and were performed high precision magnetic field measurements. Several Cryomodules with magnets inside were built and successfully tested at Fermilab test facility. In the paper presented Cryomodule magnet packages test results, discussed the magnet, and current leads conduction cooling performance.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPML009  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPML011 Garnet Ring Measurements for the Fermilab Booster 2nd Harmonic Cavity 2700
 
  • R.L. Madrak, J.E. Dey, K.L. Duel, J. Kuharik, A.V. Makarov, W. Pellico, J. Reid, G.V. Romanov, M. Slabaugh, D. Sun, C.-Y. Tan, I. Terechkine
    Fermilab, Batavia, Illinois, USA
 
  A perpendicularly biased tuneable 2nd harmonic cavity is being constructed for use in the Fermilab Booster. The cavity's tuner uses National Magnetics AL800 garnet as the tuning media. For quality control, the magnetic properties of the material and the uniformity of the properties within the tuner must be assessed. We describe two tests which are performed on the rings and on their corresponding witness samples.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPML011  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPML012 Progress on the Construction of the Perpendicularly Biased 2nd Harmonic Cavity for the Fermilab Booster 2703
 
  • R.L. Madrak, J.E. Dey, K.L. Duel, M.R. Kufer, J. Kuharik, A.V. Makarov, R.D. Padilla, W. Pellico, J. Reid, G.V. Romanov, M. Slabaugh, D. Sun, C.-Y. Tan, I. Terechkine
    Fermilab, Batavia, Illinois, USA
 
  A perpendicularly biased tuneable 2nd harmonic cavity, designed for the Fermilab Booster, is being assembled for testing this summer (2018). The cavity will work at twice the frequency of the fundamental cavities, and will be on only during the injection and transition (or extraction) periods. The main purpose of adding this cavity is to improve beam capture and reduce losses as required by Fermilab's Proton Improvement Plan (PIP). After three years of testing and optimization, the cavity design has now been finalized and all constituent parts have been received. We report on the cavity final design and on the status of the construction.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPML012  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)