Author: Heilmann, M.
Paper Title Page
TUPAF079 Scaled Alvarez-Cavity Model Investigations for the UNILAC Upgrade 916
 
  • M. Heilmann, X. Du, L. Groening, M. Kaiser, S. Mickat, M. Vossberg
    GSI, Darmstadt, Germany
  • A. Seibel
    IAP, Frankfurt am Main, Germany
 
  The 1:3 scaled aluminum model of an Alvarez-type cavity with 10 gaps was used for comparison of simulation with measurement for the frequency and the electric field on axis. The scaled frequency is 325.224 MHz and an Alvarez cavity has a small frequency tuning range. With this scaled model it was possible to apply different stem configurations for each drift tube to damp parasitic modes and to increase the field stability. The new drift tubes have an optimized free-formed profile on the end plates in order to increase the shunt impedance. In special the assembly, positioning and alignment of the drift tubes can be tested and the frequency change can be investigated in this respect.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF079  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAF080 Final Design of the FoS Alvarez-Cavity-Section for the Upgraded UNILAC 920
 
  • M. Heilmann, X. Du, L. Groening, M. Kaiser, S. Mickat, C. Mühle, A. Rubin, V. Srinivasan
    GSI, Darmstadt, Germany
  • A. Seibel
    IAP, Frankfurt am Main, Germany
 
  The final design describes the First-of-Series (FoS) Alvarez-Cavity-section of the first tank being part of the new post-stripper DTL of the UNILAC. The FoS-cavity has an input energy of 1.358 MeV/u with 11 drift tubes (including quadrupole singlets) in a total length of 1.9 m and a diameter of 2 m with an operation frequency of 108.4 MHz. The drift tubes will have a new shape profile at the end plates. The single layered quadruple singlets inside the drift tubes are pulsed with 10 Hz and will have a maximum field gradient of 51 T/m. The new drift tube design combines the new shape profile with the transverse and longitudinal installation space of the magnet. The FoS Alvarez-cavity will be part of the first section of the new Alvarez DTL. It shall be operated at nominal RF- and magnetic fields prior to procurement of the series.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF080  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAF088 Final factory-side Measurements of the Next SC CH-Cavities for the HELIAC-Project 943
 
  • M. Basten, M. Busch, H. Podlech, M. Schwarz
    IAP, Frankfurt am Main, Germany
  • K. Aulenbacher, W.A. Barth, V. Gettmann, T. Kürzeder, M. Miski-Oglu
    HIM, Mainz, Germany
  • W.A. Barth, F.D. Dziuba, M. Heilmann, S. Yaramyshev
    GSI, Darmstadt, Germany
 
  Funding: Work supported by the EU Framework Programme H2020 662186 (MYRTE); Work supported by BMBF Contr. No. 05P15RFBA;
The upcoming FAIR project (Facility for Antiproton and Ion Research) at GSI will use the existing UNILAC (UNIversal Linear Accelerator) as an injector to provide high intensity heavy ion beams at low repetition rates. As a consequence a new superconducting (sc) continous wave (cw) high intensity heavy ion Linac is required to provide ion beams above the coulomb barrier to keep the Super Heavy Element (SHE) physics program at GSI competitive on an international level. The fundamental Linac design comprises a high performance ion source, the High Charge State Injector (HLI) upgraded for cw-operation and a matching line (1.4 MeV/u) followed by a sc Drift Tube Linac (DTL). Four cryo modules each equipped with three Crossbar-H-mode (CH) structures provide for acceleration up to 7.3 MeV/u. The first section of this ambitious accelerator project has been successfully commissioned and tested with heavy ion beam from the HLI in 2017. It comprises two sc 9.3 T solenoids and a sc 217 MHz CH-cavity with 15 equidistant gaps as a demonstrator. The construction of the next two sc 217 MHz 8 gap CH-cavities is nearly finished and final factory-side measurements will be presented.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF088  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAK002 Advanced Approach for Beam Matching along the Multi-Cavity SC CW Linac at GSI 955
 
  • S. Yaramyshev, W.A. Barth, M. Heilmann
    GSI, Darmstadt, Germany
  • K. Aulenbacher
    IKP, Mainz, Germany
  • K. Aulenbacher, W.A. Barth, V. Gettmann, T. Kürzeder, M. Miski-Oglu
    HIM, Mainz, Germany
  • M. Basten, M. Busch, H. Podlech, M. Schwarz
    IAP, Frankfurt am Main, Germany
 
  A multi-stage program for the development of a heavy ion superconducting (sc) continuous wave (cw) linac is in progress at HIM (Mainz, Germany) and GSI (Darmstadt, Germany) under support of IAP (Frankfurt, Germany). In 2017 the first section of the CW-Linac has been successfully commissioned at GSI. Beam acceleration at the CW-Linac is foreseen to be performed by up to twelve multi-gap CH cavities. The linac should provide the beam for physics experiments, smoothly varying the output particle energy from 3.5 to 7.3 MeV/u, simultaneously keeping high beam quality. Due to a wide variation of the input- and output -beam energy for each cavity, a longitudinal beam matching to every cavity is of high importance. An advanced algorithm for an optimization of matched beam parameters under variable rf-voltage and rf-phase of each cavity has been developed. The description of the method and the obtained results are presented in the paper.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAK002  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAK003 Beam Dynamics Simulations for the New Superconducting CW Heavy Ion LINAC at GSI 959
 
  • M. Schwarz, M. Basten, M. Busch, H. Podlech
    IAP, Frankfurt am Main, Germany
  • K. Aulenbacher
    IKP, Mainz, Germany
  • K. Aulenbacher, W.A. Barth, F.D. Dziuba, V. Gettmann, T. Kürzeder, M. Miski-Oglu
    HIM, Mainz, Germany
  • W.A. Barth, M. Heilmann, A. Rubin, A. Schnase, S. Yaramyshev
    GSI, Darmstadt, Germany
 
  Funding: Work supported by BMBF Contr. No. 05P15RFBA and EU Framework Programme H2020 662186 (MYRTE)
For future experiments with heavy ions near the coulomb barrier within the super-heavy element (SHE) research project a multi-stage R&D program of GSI/HIM and IAP is currently in progress. It aims for developing a supercon-ducting (sc) continuous wave (CW) LINAC with multiple CH cavities as key components downstream the High Charge State Injector (HLI) at GSI. The LINAC design is challenging due to the requirement of intense beams in CW mode up to a mass-to-charge ratio of 6, while covering a broad output energy range from 3.5 to 7.3 MeV/u with unchanged minimum energy spread. Testing of the first CH-cavity in 2016 demonstrated a promising maximum accelerating gradient of Ea = 9.6 MV/m; the worldwide first beam test with this sc multi-gap CH-cavity in 2017 was a milestone in the R&D work of GSI/HIM and IAP. In the light of experience gained in this research so far, the beam dynamics layout for the entire LINAC has recently been updated and optimized.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAK003  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAK004 Superconducting CH-Cavity Heavy Ion Beam Testing at GSI 962
 
  • W.A. Barth, M. Heilmann, A. Rubin, A. Schnase, S. Yaramyshev
    GSI, Darmstadt, Germany
  • K. Aulenbacher
    IKP, Mainz, Germany
  • K. Aulenbacher, F.D. Dziuba, V. Gettmann, T. Kürzeder, M. Miski-Oglu
    HIM, Mainz, Germany
  • M. Basten, M. Busch, H. Podlech, M. Schwarz
    IAP, Frankfurt am Main, Germany
 
  Recently the first section of a standalone superconducting (sc) continuous wave (cw) heavy ion Linac as a demonstration of the capability of 217 MHz multi gap Crossbar H-mode structures (CH) has been commissioned and extensively tested with beam from the GSI- High Charge State Injector. The demonstrator set up reached acceleration of heavy ions up to the design beam energy and beyond. The required acceleration gain was achieved with heavy ion beams even above the design mass to charge ratio at high beam intensity and full beam transmission. This contribution presents systematic beam measurements with varying RF-amplitudes and phases of the CH-cavity, as well as versatile phase space measurements for heavy ion beams with different mass to charge ratio. The worldwide first and successful beam test with a superconducting multi gap CH-cavity is a milestone of the R&D work of Helmholtz Institute Mainz (HIM) and GSI in collaboration with Goethe University Frankfurt (GUF) in preparation of the sc cw heavy ion Linac project and other cw-ion beam applications.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAK004  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPAK006 Bunch Shape Measurements at the GSI CW-Linac Prototype 2091
 
  • T. Sieber, W.A. Barth, P. Forck, V. Gettmann, M. Heilmann, H. Reeg, A. Reiter, S. Yaramyshev
    GSI, Darmstadt, Germany
  • F.D. Dziuba, T. Kürzeder, M. Miski-Oglu
    HIM, Mainz, Germany
  • A. Feschenko, S.A. Gavrilov
    RAS/INR, Moscow, Russia
 
  The existing GSI accelerator will become the injector for FAIR. To preserve and enhance the current experimental program at UNILAC, a new Linac is under development, which shall run in parallel to the FAIR injector, providing cw-beams of ions at energies from 3.5 - 7.3 MeV/u. For this cw-Linac a superconducting prototype cavity has been developed and was first operated with beam in summer 2017. The resonator is a cross-bar H-structure (CH) of 0.7 m length, with a resonant frequency of 216.8 MHz. It has been installed behind the GSI High Charge State Injector (HLI), which provided 108 MHz bunches of 1.4 MeV/u Ar6+/9+/11+ ions at a duty cycle of 25 %. Due to the frequency jump and small longitudinal acceptance of the CH, proper matching of the HLI beam to the prototype was required. The bunch properties of the injected beam as well as the effect of different phase- and amplitude-settings of the cavity were measured in detail with a bunch shape monitor (BSM) fabricated at INR, Moscow, while the mean energy was analyzed by time of flight method. In this contribution, the bunch shape measurements are described and the capabilities of the used BSM measurement principle are discussed.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPAK006  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)