Paper |
Title |
Page |
THPAL028 |
Commissioning of the Bunch-by-Bunch Feedback System in the MAX IV 1.5 GeV Ring |
3688 |
|
- D. Olsson, Å. Andersson, F.J. Cullinan, P.F. Tavares
MAX IV Laboratory, Lund University, Lund, Sweden
|
|
|
The MAX IV 1.5 GeV ring is an electron storage ring for production of synchrotron light in the IR to soft X-ray spectral range. The ring will deliver light to its first users during 2018. Bunch-By-Bunch (BBB) feedback has been needed to suppress coupled-bunch mode instabilities (CBMIs), and the feedback has this far been provided in all three planes by a single stripline kicker. This is done by combining the horizontal and vertical baseband feedback signals with the longitudinal feedback signal that is upconverted to the 150 MHz - 250 MHz range. The combined signal is then fed to two stripline electrodes. The layout of the BBB feedback system in the MAX IV 1.5 GeV ring is presented in this paper. Results from instability studies are also discussed.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-THPAL028
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPMK004 |
Pulse-Picking by Resonant Excitation (PPRE) for Timing Users at the MAX IV 3 GeV Storage Ring |
4300 |
|
- T. Olsson, Å. Andersson, D.K. Olsson
MAX IV Laboratory, Lund University, Lund, Sweden
|
|
|
At synchrotron light storage rings there is demand for serving both high-brilliance and timing users simultaneously. At many rings this is commonly achieved by operating fill patterns with gaps of sufficient length, but this is not favorable for rings that operate with passive harmonic cavities to damp instabilities and increase Touschek lifetime by lengthening the bunches. For such rings, gaps in the fill pattern could severely reduce the achievable bunch lengths. For the MAX IV 3 GeV storage ring, sufficient bunch lengthening is also essential for conserving the ultralow emittance and reducing heat load on vacuum components at high current. It is therefore of interest to study methods to serve timing users while operating without gap in the fill pattern. Once such method is PPRE, where the transverse emittance of one bunch in the bunch train is increased by an incoherent betatron excitation. This paper presents simulations for the MAX IV 3 GeV storage ring and discusses the machine requirements as well as the achievable performance for timing users.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-THPMK004
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|