Author: De Silva, S.U.
Paper Title Page
FRIBA04 Crab Cavities for ILC 990
 
  • P.A. McIntosh
    STFC/DL/ASTeC, Daresbury, Warrington, Cheshire, United Kingdom
  • S.A. Belomestnykh, I.V. Gonin, T.N. Khabiboulline, A. Lunin, Y.M. Orlov, V.P. Yakovlev
    Fermilab, Batavia, Illinois, USA
  • G. Burt
    Cockcroft Institute, Lancaster University, Lancaster, United Kingdom
  • R. Calaga
    CERN, Meyrin, Switzerland
  • S.U. De Silva
    JLab, Newport News, Virginia, USA
  • J.R. Delayen
    ODU, Norfolk, Virginia, USA
  • T. Okugi, A. Yamamoto
    KEK, Ibaraki, Japan
  • S. Verdú-Andrés, B.P. Xiao
    BNL, Upton, New York, USA
 
  For the 14 mrad crossing angle proposed, crab cavity systems are fundamentally anticipated for the viable operation of the International Linear Collider (ILC), in order to maximise its luminosity performance. Since 2021, a specialist development team have been defining optimum crab cavity technologies which can fulfil the operational requirements for ILC, both for its baseline centre-of-mass energy of 250 GeV, but also extending those requirements out to higher beam collision intensities. Five design teams have established crab cavity technology solutions, which have the capability to also operate up to 1 TeV centre-of-mass. This presentation showcases the key performance capabilities of these designs and their associated benefits for both manufacture and integration into the ILC Interaction Region. The recommended outcome of the recently conducted crab cavity technology down-selection, will also be highlighted.  
slides icon Slides FRIBA04 [2.526 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2023-FRIBA04  
About • Received ※ 19 June 2023 — Revised ※ 25 June 2023 — Accepted ※ 27 June 2023 — Issue date ※ 20 July 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THTUT02
TEM Cavity Design  
 
  • S.U. De Silva
    ODU, Norfolk, Virginia, USA
 
  This lecture will present fundamental of RF to accelerate or reflect beams. The lecture will cover the electrical design method of the SRF high/medium/low beta cavities. The difference in the cavity design between TM mode and TE will be emphasized.  
slides icon Slides THTUT02 [16.459 MB]  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUCAA02
EIC Project Overview and Related SRF Technologies  
 
  • E.F. Daly, J. Guo, R.A. Rimmer
    JLab, Newport News, Virginia, USA
  • Z.A. Conway, D. Holmes, Q. Wu, B.P. Xiao, W. Xu, A. Zaltsman
    BNL, Upton, New York, USA
  • S.U. De Silva, J.R. Delayen
    ODU, Norfolk, Virginia, USA
  • K.S. Smith
    Brookhaven National Laboratory (BNL), Electron-Ion Collider, Upton, New York, USA
 
  Funding: This is authored by Jefferson Science Associate, LLC under U. S. DOE Contract No. DE-AC05-06OR23177.
The Electron-Ion Collider (EIC), with a range of center-of-mass energies from 20 to 140 GeV, will enable experimental nuclear physics in the gluon-dominated regime with luminosity up to 1034 cm2 per second. The project chose to employ SRF technology for several accelerating and crab cavity geometries used throughout the accelerator complex to achieve the EIC¿s energy and luminosity goals. This presentation will review the current status of the EIC, the SRF technology used in the accelerator complex and current status of SRF R&D. The discussion will share EIC’s fundamental high-power coupler design & performance, high-power HOM power handling hardware, SRF elliptical and crab cavity designs and recent experimental results.
 
slides icon Slides TUCAA02 [3.784 MB]  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPTB046 Development and Performance of RFD Crab Cavity Prototypes for HL-LHC AUP 531
 
  • L. Ristori, P. Berrutti, M. Narduzzi
    Fermilab, Batavia, Illinois, USA
  • A. Castilla
    JLAB, Newport News, USA
  • S.U. De Silva, J.R. Delayen
    ODU, Norfolk, Virginia, USA
  • N.A. Huque
    JLab, Newport News, Virginia, USA
  • Z. Li, A. Ratti
    SLAC, Menlo Park, California, USA
 
  Funding: Operated by Fermi Research Alliance, LLC, under Contract DE-AC02-07CH11359 with the U.S. DOE
The US will be contributing to the HL-LHC upgrade at CERN with the fabrication and qualification of RFD crabbing cavities in the framework of the HL-LHC Accelerator Upgrade Project (AUP) managed by Fermilab. AUP received Critical Decision 3 (CD-3) approval by DOE in December 2020 launching the project into the production phase. The electro-magnetic design of the cavity was inherited from the LHC Accelerator Research Program (LARP) but needed to be revised to meet new project requirements and to prevent issues encountered during beam tests performed at CERN in the R&D phase. Two prototype cavities were manufactured in industry and cold tested. Challenges specific to the RFD cavity were the stringent interface tolerances, the pole symmetry and the higher-order-mode impedance spectrum. Chemical processing and heat treatments were performed initially at FNAL/ANL and are now being transferred to industry for the production phase. HOM dampers are manufactured and validated by JLAB. A summary of cold test results with and without HOM dampers is presented.
 
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2023-TUPTB046  
About • Received ※ 20 June 2023 — Revised ※ 24 June 2023 — Accepted ※ 27 June 2023 — Issue date ※ 11 July 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPTB066 Fabrication and Testing of a Prototype RF-Dipole Crabbing Cavity 573
 
  • S.U. De Silva, J.R. Delayen
    ODU, Norfolk, Virginia, USA
  • H. Park
    Fermilab, Batavia, Illinois, USA
 
  Crabbing cavities are essential in particle colliders to compensate the luminosity degradation due to beam collision at a crossing angle. The 952.6 MHz 2-cell rf-dipole crabbing cavity system was proposed for the Jef-ferson Lab Electron-Ion Collider to restore the head-on collisions of electron and proton bunches at the interac-tion point. A prototype cavity was designed and devel-oped to demonstrate the performance of multi-cell rf-dipole structures. This paper presents the fabrication pro-cess and cold test results of the first 2-cell rf-dipole proto-type cavity.  
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2023-TUPTB066  
About • Received ※ 18 June 2023 — Revised ※ 29 June 2023 — Accepted ※ 30 June 2023 — Issue date ※ 21 August 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPTB068 EIC 197 MHz Crab Cavity RF Optimization 584
 
  • Z. Li
    SLAC, Menlo Park, California, USA
  • S.U. De Silva, J.R. Delayen
    ODU, Norfolk, Virginia, USA
  • R.A. Rimmer
    JLab, Newport News, Virginia, USA
  • Q. Wu, B.P. Xiao, W. Xu
    BNL, Upton, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under U.S. DOE K No. DE-SC0012704, by Jefferson Science Associates, LLC under U.S. DOE K No. DE-SC0002769, and by DOE K No. DE-AC02-76SF00515.
Crab cavities, operating at 197 MHz and 394 MHz respectively, will be used to compensate the loss of luminosity due to a 25 mrad crossing angle at the interaction point in the Electron Ion Collider (EIC). Both crab cavities are of the RF Dipole (RFD) shape. To meet the machine design requirements, there are a few important cavity design considerations that need to be addressed. First, to achieve stable cavity operation at the design voltages, cavity geometry details must be optimized to suppress potential multipacting. Incorporating strong HOM damping in the cavity design is required for the beam stability and quality. Furthermore, due to the finite pole width, the multipole fields, especially the sextupole and the decapole terms, need to be minimized to maintain an acceptable beam dynamic aperture. This paper will present the RF optimization details of the 197 MHz cavity.
 
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2023-TUPTB068  
About • Received ※ 16 June 2023 — Revised ※ 29 June 2023 — Accepted ※ 03 July 2023 — Issue date ※ 08 July 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPWB051 Development of a Prototype 197 MHz Crab Cavity for the Electron-Ion Collider at JLab 685
 
  • N.A. Huque, E.F. Daly, E. Drachuk, J. Henry, M. Marchlik
    JLab, Newport News, Virginia, USA
  • A. Castilla
    JLAB, Newport News, USA
  • S.U. De Silva
    ODU, Norfolk, Virginia, USA
  • B.P. Xiao
    BNL, Upton, New York, USA
 
  Thomas Jefferson National Accelerator Facility (JLab) is currently developing a prototype 197 MHz Radio-Frequency Dipole (RFD) crab cavity as part of the Electron-Ion Collider (EIC) to be built at Brookhaven National Laboratory (BNL). Cryomodules containing these cavities will be part of Hadron Storage Ring (HSR) of the EIC. The prototype cavity is constructed primarily of formed niobium sheets of thickness 4.17 mm, with machined niobium parts used as interfaces where tight tolerancing is required. The cavity¿s large size and complex features present a number of challenges in fabrication, tuning, and RF testing. Structural and forming analyses have been carried out to optimize the design and fabricated processes. An overview of the design phase and the current state of fabrication are presented in this paper.
Work supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics under contract DE-AC05-06OR23177
 
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2023-WEPWB051  
About • Received ※ 17 June 2023 — Revised ※ 25 June 2023 — Accepted ※ 26 June 2023 — Issue date ※ 16 July 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPWB052 Temperature, RF Field, and Frequency Dependence Performance Evaluation of Superconducting Niobium Half-Wave Coaxial Cavity 691
 
  • N.K. Raut, G. Ciovati, P. Dhakal
    JLab, Newport News, Virginia, USA
  • S.U. De Silva, J.R. Delayen, B.D. Khanal, J.K. Tiskumara
    ODU, Norfolk, Virginia, USA
 
  Funding: This is authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05- 06OR23177
Recent advancement in superconducting radio frequency cavity processing techniques, with diffusion of impurities within the RF penetration depth, resulted in high quality factor with increase in quality factor with increasing accelerating gradient. The increase in quality factor is the result of a decrease in the surface resistance as a result of nonmagnetic impurities doping and change in electronic density of states. The fundamental understanding of the dependence of surface resistance on frequency and surface preparation is still an active area of research. Here, we present the result of RF measurements of the TEM modes in a coaxial half-wave niobium cavity resonating at frequencies between 0.3 - 1.3 GHz. The temperature dependence of the surface resistance was measured between 4.2 K and 1.6 K. The field dependence of the surface resistance was measured at 2.0 K. The baseline measurements were made after standard surface preparation by buffered chemical polishing.
 
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2023-WEPWB052  
About • Received ※ 18 June 2023 — Revised ※ 24 June 2023 — Accepted ※ 26 June 2023 — Issue date ※ 20 July 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
FRIBA03 Heavily Damped Crab Cavities for High Luminosity Collisions 986
 
  • B.P. Xiao
    BNL, Upton, New York, USA
  • S.U. De Silva
    ODU, Norfolk, Virginia, USA
 
  Funding: Work supported by BSA under U.S. DOE contract No. DE-SC0012704, by JSA under U.S. DOE Contract No. DE-SC0002769, and by DOE Contract No. DE-AC02-76SF00515.
Next generation colliders require crab cavities to mitigate parasitic collisions caused by finite crossing angle for luminosity leveling and detector data pile up reduction. The Electron Ion Collider (EIC) crab cavity designs will be introduced as an example to fulfill the geometrical constraints, crabbing voltages, multipole components, Higher Order Mode (HOM) power and impedance budgets. Operational challenges such as tuning, high gain low delay control loop, amplitude and phase noises control will be discussed.
 
slides icon Slides FRIBA03 [3.666 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2023-FRIBA03  
About • Received ※ 19 June 2023 — Revised ※ 25 June 2023 — Accepted ※ 28 June 2023 — Issue date ※ 06 July 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)