Paper | Title | Page |
---|---|---|
MOPTEV002 | Extended Range SRF Cavity Tuner for LCLS II HE Project | 203 |
|
||
Funding: This manuscript has been authorized by Fermi Research Alliance LLC under Contract N. DE-AC02-07CH11359 with U.S. Department of Energy. The off-frequency detune method is being considered to be applied in the LCLS-II-HE superconducting linac to produce multi-energy electron beams for supporting multiple undulator lines simultaneously. To deliver off-frequency operation (OFO) requirements for SRF cavity tuner must be changed. Tuner design modifications and results of the testing eight cavity/tuner system, deployed in verification cryomodule (vCM), will be presented. |
||
![]() |
Poster MOPTEV002 [0.710 MB] | |
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2021-MOPTEV002 | |
About • | Received ※ 22 June 2021 — Revised ※ 16 July 2021 — Accepted ※ 19 August 2021 — Issue date ※ 23 September 2021 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
MOPCAV013 | LCLS-II-HE Vertical Acceptance Testing Plans | 291 |
|
||
LCLS-II-HE has performance requirements similar to but generally more demanding than those of LCLS-II, with an operating gradient of 21 MV/m (up from 16 MV/m in LCLS-II) and tighter restrictions on field emission and multipacting. In this paper, we outline the requirements for the 1.3 GHz cavities and the plans for qualification of these cavities by vertical test. We discuss lessons learned from LCLS-II and highlight the changes implemented in the vertical test procedure for the new project. | ||
![]() |
Poster MOPCAV013 [0.418 MB] | |
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2021-MOPCAV013 | |
About • | Received ※ 21 June 2021 — Revised ※ 12 July 2021 — Accepted ※ 21 August 2021 — Issue date ※ 02 May 2022 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPCAV009 | Statistical Modeling of Peak Accelerating Gradients in LCLS-II and LCLS-II-HE | 804 |
|
||
In this report, we study the vertical test gradient performance and the gradient degradation between vertical test and cryomodule test for the 1.3 GHz LCLS-II cavities. We develop a model of peak gradient statistics, and use our understanding of the LCLS-II results and the changes implemented for LCLS-II-HE to estimate the expected gradient statistics for the new machine. Finally, we lay out a plan to ensure that the LCLS-II-HE cryomodule gradient specifications are met while minimizing cavity disqualification by introducing a variable acceptance threshold for the accelerating gradient. | ||
![]() |
Poster THPCAV009 [1.311 MB] | |
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2021-THPCAV009 | |
About • | Received ※ 21 June 2021 — Revised ※ 14 September 2021 — Accepted ※ 02 November 2021 — Issue date ※ 23 November 2021 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPTEV003 | LCLS-II Cryomodules Production Experience and Lessons Learned Towards LCLS-II-HE Project | 832 |
|
||
Funding: DOE LCLS-II is an upgrade project for the linear coherent light source (LCLS) at SLAC. The LCLS-II linac consists of thirty-five 1.3 GHz and two 3.9 GHz superconducting RF (SRF) continuous wave (CW) cryomodules with high quality factor cavities. Cryomodules were produced at Fermilab and at Jefferson Lab in collaboration with SLAC. Fermilab successfully completed the assembly, testing and delivery of seventeen 1.3 GHz and three 3.9 GHz cryomodules. LCLS-II-HE is a planned upgrade project to LCLS-II. The LCLS-II-HE linac will consist of twenty-three 1.3 GHz cryomodules with high gradient and high quality factor cavities. This paper presents LCLS-II-HE cryomodule production plans, emphasizing the improvements done based on the challenges, mitigations, and lessons learned from LCLS-II. |
||
![]() |
Poster THPTEV003 [0.620 MB] | |
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2021-THPTEV003 | |
About • | Received ※ 21 June 2021 — Revised ※ 11 August 2021 — Accepted ※ 21 August 2021 — Issue date ※ 27 October 2021 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |