Author: Henry, J.
Paper Title Page
WEPTEV008 VSR Demo Cold String: Recent Developments and Manufacturing Status 647
 
  • N. Wunderer, V. Dürr, A. Frahm, H.-W. Glock, F. Glöckner, J. Knobloch, E. Sharples-Milne, A.V. Tsakanian, A. Veléz
    HZB, Berlin, Germany
  • M. Bonezzi, A. D’Ambros, R. Paparella
    INFN/LASA, Segrate (MI), Italy
  • J. Guo, J. Henry, R.A. Rimmer
    JLab, Newport News, Virginia, USA
  • J. Knobloch
    University of Siegen, Siegen, Germany
  • A. Veléz
    Technical University Dortmund, Dortmund, Germany
 
  The BESSY VSR project aims to demonstrate the possibility to simultaneously run both long (15ps) and short bunches (1.7ps) within BESSY II storage ring. To achieve this, a new SRF cavity system with higher harmonic cavities (3 and 3.5 harm.) needs to be installed. The combined cavity SRF beating allows for stable bunch shortening for half of the buckets while standard lengths remaining for the other half. These SRF cavities will be equipped with waveguide-connected HOM absorbers and will be controlled with a blade tuner plus piezos. To demonstrate the feasibility of this complex system the VSR DEMO cold string consists of two 1.5 GHz cavities, each featuring five waveguides and a higher power coupler, plus all interconnecting elements coupled to the beam vacuum. For most of these components the fundamental development work is completed and has been reported in the past. This paper summarizes recent enhancements, component detailing and manufacturing status. The key cold string components such as cavities, higher power couplers and blade tuners have already entered the manufacturing phase. All other cold string components will be ready for purchase at the latest beginning of 2022.  
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2021-WEPTEV008  
About • Received ※ 18 June 2021 — Revised ※ 09 August 2021 — Accepted ※ 22 November 2021 — Issue date ※ 05 January 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)