Author: Bazin, N.
Paper Title Page
WEPFAV001 Cryomodule Development for the Materials Irradiation Facility: From IFMIF-EVEDA to IFMIF-DONES 534
 
  • N. Bazin, S. Chel
    CEA-DRF-IRFU, France
 
  For several years, CEA has been involved in the development of superconducting linac for fusion related project, with the goal to develop an high flux neutrons source to test and qualify specific materials to be used in fusion power plants. In the framework of the ITER Broder Approch, a prototype cryomodule is under construction in Japan for the IFMIF/EVEDA phase(Engineering Validation and Engineering Design Activities) and the construction of the Accelerator Prototype (LIPAc) at Rokkasho, fully representative of the IFMIF low energy (9 MeV) accelerator (125 mA of D+beam in continuous wave). Meanwhile, the design studies of a plant called DONES (Demo Oriented NEutron Source, derived from IFMIF) started, with a superconducting linac made of 5 cryomodules. These one are based on the same principles as the one developed for IFMIF/EVEDA, but taking into account the lessons learnt from the prototype. This paper will present the similarities but also the differences between the cryomodules for IFMIF/EVEDA and DONES.  
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2021-WEPFAV001  
About • Received ※ 28 June 2021 — Revised ※ 23 August 2021 — Accepted ※ 23 August 2021 — Issue date ※ 13 October 2021
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPTEV015 Design of the 650 MHz High Beta Prototype Cryomodule for PIP-II at Fermilab 671
 
  • V. Roger, S.K. Chandrasekaran, S. Cheban, M. Chen, J. Helsper, J.P. Holzbauer, Y.M. Orlov, V. Poloubotko, B. Squires, N. Tanovic, G. Wu
    Fermilab, Batavia, Illinois, USA
  • N. Bazin, O. Napoly, C. Simon
    CEA-DRF-IRFU, France
  • R. Cubizolles, M. Lacroix
    CEA-IRFU, Gif-sur-Yvette, France
  • M.T.W. Kane
    STFC/DL/ASTeC, Daresbury, Warrington, Cheshire, United Kingdom
  • P. Khare
    RRCAT, Indore (M.P.), India
 
  Funding: This manuscript has been authored by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy, Office of Science, Office of High Energy Physics
The Proton Improvement Plan II (PIP-II) is the first U.S. accelerator project that will have significant contributions from international partners. The prototype High Beta 650 MHz cryomodule (pHB650 CM) is designed by an integrated design team, consisting of Fermilab (USA), CEA (France), UKRI-STFC (UK), and RRCAT (India). The manufacturing & assembly of this prototype cryomodule will be done at Fermilab, whereas the production cryomodules will be manufactured and/or assembled by UKRI-STFC, RRCAT, or Fermilab. Similar to the prototype Single Spoke Resonator 1 cryomodule (pSSR1 CM), this cryomodule is based on a strong-back at room temperature supporting the coldmass. The pSSR1 CM led to significant lessons being learnt on the design, procurement, and assembly processes. These lessons were incorporated into the design and processes for the pHB650 CM. Amongst many challenges faced, the main challenges of the pHB650 CM design were to make the cryomodule compatible to overseas transportation and to design components that can be procured in USA, Europe, and India.
 
poster icon Poster WEPTEV015 [0.937 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2021-WEPTEV015  
About • Received ※ 21 June 2021 — Revised ※ 28 February 2022 — Accepted ※ 20 April 2022 — Issue date ※ 16 May 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTEV006 Design of the PIP-II 650 MHz Low Beta Cryomodule 841
 
  • N. Bazin, S. Berry, G. Maitre, O. Napoly, C. Simon
    CEA-DRF-IRFU, France
  • S. Bouaziz, R. Cubizolles, M. Lacroix
    CEA-IRFU, Gif-sur-Yvette, France
  • S.K. Chandrasekaran, Y.M. Orlov, V. Roger
    Fermilab, Batavia, Illinois, USA
 
  The Proton Improvement Plan II (PIP-II) that will be installed at Fermilab is the first U.S. accelerator project that will have significant contributions from international partners. CEA joined the international collaboration in 2018, and is responsible of the 650 MHz low-beta section made of 9 cryomodules, with the design of the cryostat (i.e the cryomodule without the cavities, the power couplers and the frequency tuning systems) and the manufacturing of its components, the assembly and tests of the pre-production cryomodule and the 9 series ones. This paper will present the design of the 650 MHz low-beta cryomodule.  
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2021-THPTEV006  
About • Received ※ 02 July 2021 — Accepted ※ 30 January 2022 — Issue date ※ 01 May 2022  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)