THP026 | Initial Operation of the LCLS-II Electron Source | 891 |
|
||
Funding: This work supported under DOE Contract DE-AC02-76SF00515 The Early Injector Commissioning program for LCLS-II aims to demonstrate CW electron beam production this year in the first two meters of the injector that includes the room-temperature 185.7 MHz single-cell gun and the 1.3 GHz two-cell buncher cavity. These cavities were designed and built by LBNL based on their experience with similar ones for their Advanced Photo-Injector Experiment (APEX) program. With the 258 nm laser system and Cs2Te cathodes, bunches of up to 300 pC are expected at rates as high as 1 MHz. The paper presents results from this program including the vacuum levels achieved, RF processing and field control experience, dark current measurements and laser and beam characterization. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2019-THP026 | |
About • | paper received ※ 26 June 2019 paper accepted ※ 30 June 2019 issue date ※ 14 August 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |