Author: Roger, V.
Paper Title Page
MOP094 Design Strategy of the PIP-II Cryomodules 307
 
  • V. Roger, S.K. Chandrasekaran, D. Passarelli
    Fermilab, Batavia, Illinois, USA
 
  Funding: This manuscript has been authored by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy, Office of Science, Office of High Energy Physics
The Proton Improvement Plan II (PIP-II) is the first U.S. accelerator project that will have significant contributions from international partners. Research institutions in India, Italy, UK and France will build major components of the particle accelerator. The High Beta 650 MHz (HB650) prototype cryomodule is being designed jointly between Fermilab (USA), CEA (France), STFC (UK) and RRCAT (India). The assembly of this prototype cryomodule will be done at Fermilab whereas the production cryomodules will be assembled in UK. Concerning the Low Beta 650 MHz (LB650) cryomodules, they will be designed and assembled at CEA. To reduce the cost of the project and to increase the quality it is essential to define a design strategy for each cryomodule which includes a degree of standardization. In this way, the lessons learned of each prototype cryomodule will have a great impact not only on one cryomodule type but on all cryomodules. An international joint design brings also additional challenges to the project: which unit system should be used? Should a common project lifecycle management system be used for all partners? How to transport the cryomodules overseas.
 
poster icon Poster MOP094 [1.117 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2019-MOP094  
About • paper received ※ 21 June 2019       paper accepted ※ 30 June 2019       issue date ※ 14 August 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOP101 Design and Manufacturing Challenges of the SSR1 Current Leads for PIP-II 329
 
  • S. Cheban, D. Passarelli, V. Roger
    Fermilab, Batavia, Illinois, USA
 
  The SSR1 cryomodule contains eight 325 MHz superconducting single spoke cavities and four solenoid-based focusing lenses operating at 2 K. The focusing lens for SSR1 cryomodule, is a superconducting magnet surrounded by a helium box which will be filled with liquid helium. The magnet assembly is composed of one solenoid with operating current 70 A and 2 quadrupoles correctors with operating current 45 A. The conduction cooled current leads will be used to power magnets. The details of current leads design, fabrication and room temperature qualification will be presented. Main emphasis will be put on the design and production process challenges and possible solutions to fulfilled operation requirement under low temperature conditions.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2019-MOP101  
About • paper received ※ 28 June 2019       paper accepted ※ 30 June 2019       issue date ※ 14 August 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THP091 Upgrade of the Fermilab Spoke Test Cryostat for Testing of PIP-II 650 MHz 5-Cell Elliptical Cavities 1124
 
  • A.I. Sukhanov, S.K. Chandrasekaran, B.M. Hanna, T.H. Nicol, J.P. Ozelis, Y.M. Pischalnikov, D. Plant, O.V. Prokofiev, O.V. Pronitchev, V. Roger, W. Schappert, I. Terechkine, V.P. Yakovlev
    Fermilab, Batavia, Illinois, USA
  • C. Contreras-Martinez
    FRIB, East Lansing, Michigan, USA
 
  Design of the high beta 650 MHz prototype cryomodule for PIP-II is currently undergoing at Fermilab. The cryomodule includes six 5-cell elliptical SRF cavities with accelerating voltage up to 20 MV and low heat dissipation (Q0 > 3·10zEhNZeHn). Characterization of performance of fully integrated jacketed cavities with high power coupler and tuner is crucial for the project. Such a characterization of jacketed cavity requires a horizontal test cryostat. Existing horizontal testing facilities at Fermilab, Horizontal Test Stand (HTS) and Spoke Test Cryostat (STC), are not large enough to accommodate jacketed 650 MHz 5-cell cavity. An upgrade of the STC is proposed to install extension to the cryostat and modify cryogenic connections and RF infrastructure to provide testing of 650 MHz cavities. In this paper we describe STC upgrade and commissioning of the upgraded facility. We discuss mitigation of issues and problems specific for testing of high Q0 650 MHz cavities, which require low residual magnetic field and low acoustic and mechanical vibrations environment.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2019-THP091  
About • paper received ※ 23 June 2019       paper accepted ※ 30 June 2019       issue date ※ 14 August 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)