Author: Pronitchev, O.V.
Paper Title Page
MOP080 Latest Progress in Designs and Testings of PIP-II Power Couplers 263
 
  • S. Kazakov, B.M. Hanna, O.V. Pronitchev, N. Solyak
    Fermilab, Batavia, Illinois, USA
 
  Proton Improvement Plan – II (PIP-II) project is under go in Fermi National Laboratory. Main part of the project is 800 MeV proton superconducting accelerator which includes 116 superconducting cavities of 5 different types and three 162.5, 325 and 650 MHz frequencies. Key elements of accelerator which determine a reliable operation are main couplers for superconducting cavities. This paper describes the latest progress in design and testing of main couplers for PIP-II projects.  
poster icon Poster MOP080 [0.881 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2019-MOP080  
About • paper received ※ 18 June 2019       paper accepted ※ 30 June 2019       issue date ※ 14 August 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUP085 Operation of an SRF Cavity Tuner Submerged into Liquid He 660
 
  • Y.M. Pischalnikov, D.J. Bice, A. Grassellino, T.N. Khabiboulline, O.S. Melnychuk, R.V. Pilipenko, S. Posen, O.V. Pronitchev, A.S. Romanenko
    Fermilab, Batavia, Illinois, USA
 
  To precisely control the resonance of 1.3 GHz SRF cavities during testing at the FNAL’s Vertical Test Facility, we install for the first time a double lever tuner and operate it when submerged into the liquid He bath. Both active components of the tuner: electromechanical actuator (stepper motor) and piezo-actuators are operated inside superfluid helium. Accuracy in controlling the SRF cavity resonance frequency will be presented. Specifics of the tuner operation when submerged into liquid He will be discussed.  
poster icon Poster TUP085 [2.164 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2019-TUP085  
About • paper received ※ 23 June 2019       paper accepted ※ 02 July 2019       issue date ※ 14 August 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THP091 Upgrade of the Fermilab Spoke Test Cryostat for Testing of PIP-II 650 MHz 5-Cell Elliptical Cavities 1124
 
  • A.I. Sukhanov, S.K. Chandrasekaran, B.M. Hanna, T.H. Nicol, J.P. Ozelis, Y.M. Pischalnikov, D. Plant, O.V. Prokofiev, O.V. Pronitchev, V. Roger, W. Schappert, I. Terechkine, V.P. Yakovlev
    Fermilab, Batavia, Illinois, USA
  • C. Contreras-Martinez
    FRIB, East Lansing, Michigan, USA
 
  Design of the high beta 650 MHz prototype cryomodule for PIP-II is currently undergoing at Fermilab. The cryomodule includes six 5-cell elliptical SRF cavities with accelerating voltage up to 20 MV and low heat dissipation (Q0 > 3·10zEhNZeHn). Characterization of performance of fully integrated jacketed cavities with high power coupler and tuner is crucial for the project. Such a characterization of jacketed cavity requires a horizontal test cryostat. Existing horizontal testing facilities at Fermilab, Horizontal Test Stand (HTS) and Spoke Test Cryostat (STC), are not large enough to accommodate jacketed 650 MHz 5-cell cavity. An upgrade of the STC is proposed to install extension to the cryostat and modify cryogenic connections and RF infrastructure to provide testing of 650 MHz cavities. In this paper we describe STC upgrade and commissioning of the upgraded facility. We discuss mitigation of issues and problems specific for testing of high Q0 650 MHz cavities, which require low residual magnetic field and low acoustic and mechanical vibrations environment.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2019-THP091  
About • paper received ※ 23 June 2019       paper accepted ※ 30 June 2019       issue date ※ 14 August 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)