Commissioning of Klystron Transmitters with 270 kWCW at 1.3 GHz |
499 |
|
- B. Schriefer, W. Anders, A. Heugel, H. Hoffmann, G. Mielczarek, H. Stein
HZB, Berlin, Germany
|
|
|
In Berlin-Adlershof the Helmholtz-Zentrum Berlin (HZB) is constructing the energy recovery linac ¿BERLinPro¿. Three klystron transmitters each 270 kWCW at 1.3 GHz are installed at the injection path of the ERL. The RF plant includes circulators and water loads. This paper describes the commissioning of the first klystron, calibration of the RF level control system as well as comparison with calorimetric output power measurements to verify the results.
|
|