Author: Hoffmann, H.
Paper Title Page
TUP036 Commissioning of Klystron Transmitters with 270 kWCW at 1.3 GHz 499
 
  • B. Schriefer, W. Anders, A. Heugel, H. Hoffmann, G. Mielczarek, H. Stein
    HZB, Berlin, Germany
 
  In Berlin-Adlershof the Helmholtz-Zentrum Berlin (HZB) is constructing the energy recovery linac ¿BERLinPro¿. Three klystron transmitters each 270 kWCW at 1.3 GHz are installed at the injection path of the ERL. The RF plant includes circulators and water loads. This paper describes the commissioning of the first klystron, calibration of the RF level control system as well as comparison with calorimetric output power measurements to verify the results.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2019-TUP036  
About • paper received ※ 03 November 2019       paper accepted ※ 03 November 2019       issue date ※ 14 August 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)