Author: Einstein-Curtis, J.
Paper Title Page
THP060 Experience With LCLS-II Cryomodule Testing at Fermilab 1018
 
  • E.R. Harms, E. Cullerton, C.M. Ginsburg, B.J. Hansen, B.D. Hartsell, J.P. Holzbauer, J. Hurd, V.S. Kashikhin, M.J. Kucera, F.L. Lewis, A. Lunin, D.L. Newhart, D.J. Nicklaus, P.S. Prieto, O.V. Prokofiev, J. Reid, N. Solyak, R.P. Stanek, M.A. Tartaglia, G. Wu
    Fermilab, Batavia, Illinois, USA
  • C. Contreras-Martinez
    FRIB, East Lansing, Michigan, USA
  • J. Einstein-Curtis
    Private Address, Naperville, USA
 
  Funding: This manuscript has been authored by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy, Office of Science, Office of High Energy Physics.
The Cryomodule Test Stand (CMTS1) at Fermilab has been engaged with testing 8-cavity 1.3 GHz cryomodules designed and assembled for the LCLS-II project at SLAC National Accelerator Laboratory since 2016. Over these three years twenty cryomodules have been cooled to 2K and power tested in continuous wave mode on a roughly once per month cycle. Test stand layout and testing procedures are presented together with results from the cryomodules tested to date. Lessons learned and future plans will also be shared.
 
poster icon Poster THP060 [2.774 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2019-THP060  
About • paper received ※ 22 June 2019       paper accepted ※ 30 June 2019       issue date ※ 14 August 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)