Paper |
Title |
Page |
TUP100 |
Thermal Load Studies on the Photocathode Insert with Exchangeable Plug for the BERLinPro SRF-Photoinjector |
705 |
SUSP039 |
|
|
- J. Kühn, N. Al-Saokal, M. Bürger, M. Dirsat, A. Frahm, A. Jankowiak, T. Kamps, G. Klemz, S. Mistry, A. Neumann, H. Plötz
HZB, Berlin, Germany
|
|
|
For the operation of an SRF photoinjector a well-functioning and efficient cooling system of the photocathode is necessary. A test experiment was set up of the photocathode cooling system based on the original components, which we call thermal contact experiment (TCX). We present the results of our thermal load studies on the photocathode insert with exchangeable photocathode plug. The goal was to test all components before they are installed in the cold string of the BERLinPro SRF-Photoinjector to ensure the operation of very sensitive semiconductor photocathodes. The tests include the investigation of the cooling performance, the thermal load management and the mechanical stability of the photocathode insert.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-SRF2019-TUP100
|
|
About • |
paper received ※ 23 June 2019 paper accepted ※ 30 June 2019 issue date ※ 14 August 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WETEB9 |
Design Development for the 1.5 GHz Couplers for BESSY VSR |
795 |
|
- E. Sharples, M. Dirsat, J. Knobloch, Z. Muza, A.V. Vélez
HZB, Berlin, Germany
|
|
|
The Variable pulse length Storage Ring (BESSY VSR) is a superconducting radio frequency (SRF) upgrade to the existing BESSY II storage ring at Helmholtz-Zentrum Berlin (HZB). BESSY VSR uses the RF beating of superconducting cavities at 1.5 GHz and 1.75 GHz to produce simultaneously long and short bunches. Higher power couplers capable of handling 13 kW peak power at standing wave operation, are required to provide an average power of 1.5 kW for both the 1.5 GHz and 1.75 GHz cavities. These couplers must also provide variable coupling with a range of Qext from 6x106 to 6x107 to allow flexibility to adjust to operating conditions of BESSY VSR. Here the full design development process for the 1.5 GHZ BESSY VSR coupler is presented including the design for a diagnostic prototype to ensure comprehensive monitoring of critical components during testing and cool-down.
|
|
|
Slides WETEB9 [8.085 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-SRF2019-WETEB9
|
|
About • |
paper received ※ 23 June 2019 paper accepted ※ 30 June 2019 issue date ※ 14 August 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|