Paper | Title | Page |
---|---|---|
MOYA03 | Progress of the RAON | 36 |
|
||
Funding: This work was supported by the Institute for Basic Science funded by the Ministry of Science, ICT and Future Planning (MSIP) and the National Research Foundation (NRF) under Contract 2013M7A1A1075764 Construction of the RAON heavy ion accelerator facility is in-progress in Korea. The driver linac is a superconducting linac with 200 MeV/u for uranium beam and 400 kW beam power. Prototyping of major components and their tests are proceeding including superconducting cavities, superconducting magnets and cryomodules. December 2016, the RFQ accelerated oxygen beam. Status report of the RAON accelerator systems is presented. |
||
![]() |
Slides MOYA03 [10.275 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2017-MOYA03 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |