Paper |
Title |
Page |
MOXA03 |
The 30MeV Stage of the ARIEL e-linac |
6 |
|
- R.E. Laxdal, Z.T. Ang, T. Au, K. Fong, O.K. Kester, S.R. Koscielniak, A.N. Koveshnikov, M.P. Laverty, Y. Ma, D.W. Storey, E. Thoeng, Z.Y. Yao, Q. Zheng, V. Zvyagintsev
TRIUMF, Vancouver, Canada
|
|
|
A MW class cw superconducting electron linac (e-Linac) is being installed at TRIUMF as a driver for radioactive beam production as part of the ARIEL project. The e-linac final configuration is planned to consist of five 1.3GHz nine-cell cavities housed in three cryomodules with one single cavity injector cryomodule (EINJ) and two double cavity accelerating cryomodules (EACA, EACB) to accelerate in continuous-wave (cw) up to 10mA of electrons to 50MeV. The e-Linac is being installed in stages. A demonstrator phase (2014) consisting of a 300kV electron gun, EINJ, and a partially outfitted EACA with just one accelerating cavity was installed for initial technical and beam tests to 22.9MeV. A Stage 2 upgrade now installed has a completed EACA to reach an operational goal of 3mA of electrons to 30MeV for first science from the ARIEL ISOL targets. A single 290kW klystron is used to feed the two EACA cavities in vector-sum closed-loop control. The paper is focused on the SRF challenges: systems design, cavity and cryomodule performance, rf ancillaries preparation and performance, LLRF and RF system performance and final beam test results.
|
|
|
Slides MOXA03 [13.981 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-SRF2017-MOXA03
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|