  A MW class cw superconducting electron linac (e-Linac) is being installed at TRIUMF as a driver for radioactive beam production as part of the ARIEL project. The e-linac final configuration is planned to consist of five 1.3GHz nine-cell cavities housed in three cryomodules with one single cavity injector cryomodule (EINJ) and two double cavity accelerating cryomodules (EACA, EACB) to accelerate in continuous-wave (cw) up to 10mA of electrons to 50MeV. The e-Linac is being installed in stages. A demonstrator phase (2014) consisting of a 300kV electron gun, EINJ, and a partially outfitted EACA with just one accelerating cavity was installed for initial technical and beam tests to 22.9MeV. A Stage 2 upgrade now installed has a completed EACA to reach an operational goal of 3mA of electrons to 30MeV for first science from the ARIEL ISOL targets. A single 290kW klystron is used to feed the two EACA cavities in vector-sum closed-loop control. The paper is focused on the SRF challenges: systems design, cavity and cryomodule performance, rf ancillaries preparation and performance, LLRF and RF system performance and final beam test results.  
slides icon Slides MOXA03 [13.981 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2017-MOXA03  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPB042 The TRIUMF/VECC Injector Cryomodule Performance 144
 
  • Y. Ma, K. Fong, T. Junginger, D. Kishi, A.N. Koveshnikov, R.E. Laxdal, N. Muller, R.R. Nagimov, D.W. Storey, E. Thoeng, Z.Y. Yao, V. Zvyagintsev
    TRIUMF, Vancouver, Canada
  • U. Bhunia, A. Chakrabarti, S. Dechoudhury, V. Naik
    VECC, Kolkata, India
 
  The collaboration on superconducting electron Linac for rare ion beam facilities ARIEL (Advanced Rare Iso-topE Laboratory) [1-4] and ANURIB [5] (Advanced Na-tional facility for Unstable and Rare Isotope Beams) has resulted in production of a superconducting Injector Cryomodule (VECC ICM) at TRIUMF for VECC. The cryomodule design utilizes a unique box cryomodule with a top-loading cold mass. The hermetic unit consists of a niobium cavity which operating at 1.3GHz and connected with two symmetrically opposed couplers which can deliver 100kW RF power to the beam. Liquid helium supplied at 4.4 K is converted to superfluid helium-II through a cryogenic insert on board which includes 4 K phase separator, 4K/2K heat exchanger and Joule-Thompson valve. In 2016, the VECC ICM has been tested at TRIUMF and demonstrated 10.5 MeV acceleration. A summary of the VECC ICM commissioning are presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2017-MOPB042  