Paper | Title | Page |
---|---|---|
WEA01 | Beam Transfer Systems of NICA Facility: from HILAC to Booster | 61 |
|
||
New accelerator complex is being constructed by Joint Institute for Nuclear Research (Dubna, Russia) in frame of Nuclotron-based Ion Collider fAcility (NICA) project. The NICA layout includes new Booster and existing Nuclotron synchrotrons as parts of the heavy ion injection chain of the NICA Collider as well as beam transport lines which are the important link for the whole accelerator facility. Designs and current status of beam transfer systems in the beginning part of the NICA complex, which are partially commissioned, are presented in this paper. | ||
![]() |
Slides WEA01 [26.886 MB] | |
DOI • | reference for this paper ※ doi:10.18429/JACoW-RuPAC2021-WEA01 | |
About • | Received ※ 07 October 2021 — Revised ※ 08 October 2021 — Accepted ※ 13 October 2021 — Issued ※ 22 October 2021 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPSC52 |
NICA Booster Control System and Beam Diagnostics | |
|
||
The new superconducting ion synchrotron NICA Booster started it’s operation in December 2020 at the Joint Institute for Nuclear Research (Dubna, Russia). The report describes experience with TANGO based Booster control and beam diagnostics system during two first Booster runs. | ||
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |