Author: Emanov, F.A.
Paper Title Page
TUA02 Current Status of VEPP-5 Injection Complex 37
 
  • Yu.I. Maltseva, A.V. Andrianov, K.V. Astrelina, V.V. Balakin, A.M. Barnyakov, A.M. Batrakov, O.V. Belikov, D.E. Berkaev, D. Bolkhovityanov, F.A. Emanov, A.R. Frolov, G.V. Karpov, A.S. Kasaev, A.A. Kondakov, N.Kh. Kot, E.S. Kotov, G.Y. Kurkin, R.M. Lapik, N.N. Lebedev, A.E. Levichev, A.Yu. Martynovsky, P.V. Martyshkin, S.V. Motygin, A.A. Murasev, V. Muslivets, D.A. Nikiforov, A.V. Pavlenko, A.M. Pilan, Yu.A. Rogovsky, S.L. Samoylov, A.G. Tribendis, S. Vasiliev, V.D. Yudin
    BINP SB RAS, Novosibirsk, Russia
  • A.V. Andrianov, V.V. Balakin, F.A. Emanov, E.S. Kotov, A.E. Levichev, Yu.I. Maltseva, D.A. Nikiforov, A.V. Pavlenko, Yu.A. Rogovsky
    NSU, Novosibirsk, Russia
  • A.G. Tribendis
    NSTU, Novosibirsk, Russia
 
  VEPP-5 Injection Complex (IC) supplies VEPP-2000 and VEPP-4 colliders at Budker Institute of Nuclear Physics (BINP, Russia) with high energy electron and positron beams. Since 2016 the IC has shown the ability to support operation of both colliders routinely with maximum positron storage rate of 1.7·1010 e+/s. Stable operation at the energy of 430 MeV has been reached. Research on further improvements on the IC performance is carried out. In particular control system was improved, additional beam diagnostics systems were developed, monitoring of RF system was upgraded. In this paper, the latest achieved IC performance, operational results and prospects are presented.  
slides icon Slides TUA02 [2.966 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-RuPAC2021-TUA02  
About • Received ※ 28 September 2021 — Revised ※ 01 October 2021 — Accepted ※ 09 October 2021 — Issued ※ 11 October 2021
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPSC56 Beam Parameters Measurement and Control Software Tools for VEPP-5 Injection Complex Damping Ring 443
 
  • V.V. Balakin, D.E. Berkaev, F.A. Emanov
    BINP SB RAS, Novosibirsk, Russia
 
  Beam parameters control and operation software tools for BINP VEPP-5 Injection Complex Damping ring consisting of two parts were developed. Beam parameters control includes processing of measured turn-by-turn beam coordinates from all Damping ring beam position monitors and displaying such features as tunes and beam position into vacuum chamber. This part gives an opportunity to measure Damping ring response matrices and carry out its processing too. Beam parameters operation is based on knobs creating. Knob is combination of accelerator control elements, which performs an isolated shift of one selected parameter, e.g. only vertical betatron tune. This part is devoted to their creation and application on Injection Complex VEPP-5. This paper presents review of developed software tools and their application result on VEPP-5 Injection Complex: beam position adjustment via response matrix measurements and quantification the amount of Damping ring captured particles during the injection process depending on beam tunes.  
DOI • reference for this paper ※ doi:10.18429/JACoW-RuPAC2021-WEPSC56  
About • Received ※ 06 September 2021 — Accepted ※ 27 September 2021 — Issued ※ 16 October 2021  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)