Paper | Title | Page |
---|---|---|
TUPSA22 | Commissioning of Electron Cooling System of NICA Booster | 188 |
|
||
At the NICA project, two electron cooling systems were planned at the booster and collider. The booster cooler will be used for the multiturn injection procedure and for the formation of necessary beam parameters before injection from the booster to Nuclotron. This article presents the status of the commissioning of the electron cooling system at the NICA booster. The electron cooling system was produced in BINP (Novosibirsk) and delivered to JINR (Dubna) last year. This year the commissioning of the cooler was done for parameter of the injection energy of ions 3.2 GeV/u. In the nearest future it will test for the intermediate ion energy 100 GeV/u. And finally, the cooler should operates at both energy during one injection cycle. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-RUPAC2018-TUPSA22 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |