Author: Tsyganov, A.S.
Paper Title Page
WEXMH01 Feeding BINP Colliders with the New VEPP-5 Injection Complex 56
 
  • F.A. Emanov, A.V. Andrianov, K.V. Astrelina, V.V. Balakin, A.M. Barnyakov, O.V. Belikov, D.E. Berkaev, M.F. Blinov, Y.M. Boimelshtain, D. Bolkhovityanov, A.G. Chupyra, N.S. Dikansky, A.R. Frolov, Ye.A. Gusev, G.V. Karpov, A.S. Kasaev, V.I. Kokoulin, A.A. Kondakov, I. Koop, I.V. Kuptsov, G.Y. Kurkin, R.M. Lapik, N.N. Lebedev, A.E. Levichev, P.V. Logatchov, Yu. Maltseva, P.V. Martyshkin, A.A. Murasev, D.A. Nikiforov, A.V. Pavlenko, V.M. Pavlov, A.V. Petrenko, V. Podlevskih, V.V. Rashchenko, S.L. Samoylov, S.V. Shiyankov, A.N. Skrinsky, A.A. Starostenko, D.P. Sukhanov, A.G. Tribendis, A.S. Tsyganov, S.V. Vasiliev, V.D. Yudin, I.M. Zemlyansky
    BINP SB RAS, Novosibirsk, Russia
  • Yu. A. Rogovsky
    Budker INP & NSU, Novosibirsk, Russia
  • A.L. Romanov
    Fermilab, Batavia, Illinois, USA
 
  VEPP-4 and VEPP-2000 e+e colliders are switching to feed from VEPP-5 Injection Complex via newly constructed K-500 beam transfer line. Since first operation of K-500 at the end of 2015 injection complex delivered e+ and e- beams to VEPP-2000 facility and is getting ready to work with VEPP-4. Upgraded injection chain demonstrated ability to provide design luminosity toVEPP-2000 and techniques of reliable operation are now under development. The designand operation experience of Injection Complex and transfer lines will be presented.  
slides icon Slides WEXMH01 [6.228 MB]  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WECBMH02 Collector Ring Project at FAIR: Present Status 86
 
  • P.Yu. Shatunov, V.V. Anashin, E.A. Bekhtenev, D.E. Berkaev, M.I. Bryzgunov, D. Gurov, A.S. Kasaev, V.V. Kolmogorov, I. Koop, A.A. Krasnov, O.I. Meshkov, Yu. A. Rogovsky, T.V. Rybitskaya, A.V. Semenov, Y.M. Shatunov, S.V. Shiyankov, D.B. Shwartz, A.A. Starostenko, A.V. Sukhanov, A.S. Tsyganov, A.V. Utkin
    BINP SB RAS, Novosibirsk, Russia
 
  In November 2013, the FAIR management delegated the responsibility for the technical design, construction, installation, and commissioning of the whole CR and its components from GSI to Budker Institute of Nuclear Physics (BINP). Since that time a lot of modifications of the original design were made aiming to improve the beam parameters and the machine performance. This work shows the present status of the development.  
slides icon Slides WECBMH02 [20.497 MB]  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)