WECBMH02 | Collector Ring Project at FAIR: Present Status | 86 |
|
||
In November 2013, the FAIR management delegated the responsibility for the technical design, construction, installation, and commissioning of the whole CR and its components from GSI to Budker Institute of Nuclear Physics (BINP). Since that time a lot of modifications of the original design were made aiming to improve the beam parameters and the machine performance. This work shows the present status of the development. | ||
![]() |