Paper |
Title |
Page |
FRCAMH02 |
Commissioning of New Light Ion RFQ Linac and First Nuclotron Run with New Injector |
153 |
|
- A.V. Butenko, A.M. Bazanov, D.E. Donets, A.D. Kovalenko, K.A. Levterov, D.A. Lyuosev, A.A. Martynov, V.V. Mialkovskiy, D.O. Ponkin, R.G. Pushkar, V.V. Seleznev, K.V. Shevchenko, I.V. Shirikov, A.O. Sidorin
JINR/VBLHEP, Dubna, Moscow region, Russia
- S.V. Barabin, A.V. Kozlov, G. Kropachev, T. Kulevoy, V.G. Kuzmichev
ITEP, Moscow, Russia
- A. Belov
RAS/INR, Moscow, Russia
- V.V. Fimushkin, B.V. Golovenskiy, A. Govorov, V. Kobets, V.A. Monchinsky, A.V. Smirnov, G.V. Trubnikov
JINR, Dubna, Moscow Region, Russia
- S.M. Polozov
MEPhI, Moscow, Russia
|
|
|
The new accelerator complex Nuclotron-based Ion Collider fAcility (NICA) is now under development and construction at JINR, Dubna. This complex is assumed to operate using two injectors: the Alvarez-type linac LU-20 as injector of light ions, polarized protons and deuterons and a new linac HILAc - injector of heavy ions beams. Old HV for-injector of the LU-20, which operated from 1974, is replaced by the new RFQ accelerator, which was commissioned in spring 2016. The first Nuclotron technological run with new fore-injector was performed in June 2016. Beams of D+ and H2+ were successfully injected and accelerated in the Nuclotron ring. Main results of the RFQ commissioning and the first Nuclotron run with new for-injector is discussed in this paper.
|
|
|
Slides FRCAMH02 [30.140 MB]
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
FRCAMH03 |
Commissioning of the New Heavy Ion Linac at the NICA Project |
156 |
|
- A.V. Butenko, A.M. Bazanov, D.E. Donets, A.D. Kovalenko, K.A. Levterov, D.A. Lyuosev, A.A. Martynov, V.V. Mialkovskiy, V.V. Seleznev, K.V. Shevchenko, I.V. Shirikov, A.O. Sidorin
JINR/VBLHEP, Dubna, Moscow region, Russia
- B.V. Golovenskiy, A. Govorov, V. Kobets, V.A. Monchinsky, A.V. Smirnov, E. Syresin, G.V. Trubnikov
JINR, Dubna, Moscow Region, Russia
- H. Hoeltermann, H. Podlech, U. Ratzinger, A. Schempp
BEVATECH, Frankfurt, Germany
- D.A. Liakin
ITEP, Moscow, Russia
|
|
|
The new accelerator complex Nuclotron-based Ion Collider fAcility (NICA) is now under development and construction at JINR, Dubna. This complex is assumed to operate using two injectors: modernized old Alvarez-type linac LU-20 as injector of light polarized ions and a new Heavy Ion Linear Accelerator HILAc - injector of heavy ions beams. The new heavy ion linac accelerate ions with q/A values above 0.16 to 3.2 MeV/u is under commissioning. The main components are 4-Rod-RFQ and two IH - drift tube cavities is operated at 100.6 MHz. Main results of the HILAc commissioning with carbon beam from the laser ion source are discussed.
|
|
|
Slides FRCAMH03 [14.452 MB]
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|