Paper | Title | Other Keywords | Page | |||||
---|---|---|---|---|---|---|---|---|
WEP003 | Commissioning of the New Pre-Accelerator Control Systems at DESY | controls, linac, diagnostics, positron | 171 | |||||
|
In the course of the PETRA 3 project, the control systems of the pre-accelerators at DESY have been rebuilt. At all levels from front-end electronics via server or client applications to networks, radical and significant changes have been introduced. This paper describes the chosen architecture and technologies, and reports the experiences gained so far.
|
|
|
Poster
|
|
|