MOPAS082 Status of the Spallation Neutron Source Superconducting RF Facilities 623
 
  • D. Stout, S. Assadi, I. E. Campisi, F. Casagrande, M. T. Crofford, W. R. DeVan, X. Geng, T. W. Hardek, S. Henderson, M. P. Howell, Y. W. Kang, W. C. Stone, W. H. Strong, D. C. Williams, P. A. Wright
    ORNL, Oak Ridge, Tennessee
 
  Funding: SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U. S. Department of Energy

The SNS project was completed with only limited SRF facilities installed as part of the project, namely a 5 MW, 805 MHz RF test stand, a fundamental power coupler processing system, a concrete test cave shell, and temporary cleaning/assembly facilities. A concerted effort has been initiated to install the infrastructure and equipment necessary to maintain and repair the superconducting Linac, and to support power upgrade R&D. Installation of a Class10/100/10,000 cleanroom and outfitting of the test cave with RF, vacuum, controls, personnel protection and cryogenics systems is underway. A horizontal cryostat, which can house a helium vessel/cavity and fundamental power coupler for full power, pulsed testing, is being procured. Equipment for cryomodule assembly/disassembly and cavity processing also is being designed. This effort, while derived from the experience of the SRF community, will provide a unique high power test capability as well as long term maintenance capabilities. This paper presents the current status and the future plans for the SNS SRF facilities.

 
WEPMS074 Design and High Power Processing of RFQ Input Power Couplers 2505
 
  • Y. W. Kang, A. V. Aleksandrov, D. E. Anderson, M. S. Champion, M. T. Crofford, P. E. Gibson, T. W. Hardek, P. Ladd, M. P. McCarthy, D. Stout, A. V. Vassioutchenko
    ORNL, Oak Ridge, Tennessee
 
  Funding: This work was supported by SNS through UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U. S. Department of Energy.

A RF power coupling system has been developed for future upgrade of input coupling of the RFQ in the SNS linac. The design employs two coaxial loop couplers for 402.5 MHz operation. Each loop is fed through a coaxial ceramic window that is connected to an output of a magic-T waveguide hybrid through a coaxial to waveguide transition. The coaxial loop couplers are designed, manufactured, and high power processed. Two couplers will be used in parallel to power the accelerating structure with up to total 800 kW peak power at 8% duty cycle. RF and mechanical properties of the couplers are discussed. Result of high power RF conditioning that is performed in the RF test facility of the SNS is presented.

 
WEPMS076 Status of the SNS Cryomodule Test 2511
 
  • S.-H. Kim, I. E. Campisi, F. Casagrande, M. T. Crofford, Y. W. Kang, Z. Kursun, D. Stout, A. V. Vassioutchenko
    ORNL, Oak Ridge, Tennessee
 
  Funding: SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U. S. Department of Energy

The cryomodule tests are on going to have better understandings of physics as a whole and eventually to provide safe and reliable operation for neutron production. Some features are revealed to be interesting issues and need more attentions than expected, such as operating condition, collective effects between cavities, HOM coupler issues, end-group stability, cavity-coupler interactions, and vacuum/gas physics, waiting for more investigations. Up to now SNS cryomodules were mainly tested at 4.4 K, 10 pulse per second (pps) and 30 pps/60 pps tests are under progress. This paper presents the experiences and the observations during tests of cryomodules.

 
WEPMS072 Status and Performance of the Spallation Neutron Source Superconducting Linac 2502
 
  • I. E. Campisi, S. Assadi, F. Casagrande, M. S. Champion, M. T. Crofford, G. W. Dodson, J. Galambos, M. Giannella, S. Henderson, M. P. Howell, Y. W. Kang, K.-U. Kasemir, S.-H. Kim, Z. Kursun, P. Ladd, H. Ma, D. Stout, W. H. Strong, Y. Zhang
    ORNL, Oak Ridge, Tennessee
 
  Funding: SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U. S. Department of Energy

The Superconducting Linac at SNS has been operating with beam for almost two years. As the first operational pulsed superconducting linac, many of the aspect of its performance were unknown and unpredictable. A lot of experience has been gathered during the commissioning of its components, during the beam turn on and during operation at increasingly higher beam power. Some cryomodules have been cold for well over two years and have been extensively tested. The operation has been consistently conducted at 4.4 K and 10 and 15 pulses per second, with some cryomodules tested at 30 and 60 pps and some tests performed at 2 K. Careful balance between safe operational limits and the study of conditions, parameters and components that create physical limits has been achieved. This paper presents the experience and the performance of the superconducting cavities and of the associated systems with and without beam.