A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Satoh, M.

Paper Title Page
MOZAKI01 Compensation of the Crossing Angle with Crab Cavities at KEKB 27
 
  • K. Oide, T. Abe, K. Akai, M. Akemoto, A. Akiyama, A. Arinaga, K. Ebihara, K. Egawa, A. Enomoto, J. W. Flanagan, S. Fukuda, H. Fukuma, Y. Funakoshi, K. Furukawa, T. Furuya, K. Hara, T. Higo, S. Hiramatsu, H. Hisamatsu, H. Honma, K. Hosoyama, T. Ieiri, N. Iida, H. Ikeda, M. Ikeda, S. Isagawa, H. Ishii, A. Kabe, E. Kadokura, T. Kageyama, K. Kakihara, E. Kako, S. Kamada, T. Kamitani, K.-I. Kanazawa, H. Katagiri, S. Kato, T. Kawamoto, S. Kazakov, M. Kikuchi, E. Kikutani, K. Kitagawa, H. Koiso, Y. Kojima, K. Komada, T. Kubo, K. Kudo, N. K. Kudo, K. Marutsuka, M. Masuzawa, S. Matsumoto, T. Matsumoto, S. Michizono, K. Mikawa, T. Mimashi, S. Mitsunobu, K. Mori, A. Morita, Y. Morita, H. Nakai, H. Nakajima, T. T. Nakamura, H. Nakanishi, K. Nakao, S. Ninomiya, Y. Ogawa, K. Ohmi, Y. Ohnishi, S. Ohsawa, Y. Ohsawa, N. Ohuchi, M. Ono, T. Ozaki, K. Saito, H. Sakai, Y. Sakamoto, M. Sato, M. Satoh, K. Shibata, T. Shidara, M. Shirai, A. Shirakawa, T. Sueno, M. Suetake, Y. Suetsugu, R. Sugahara, T. Sugimura, T. Suwada, O. Tajima, S. Takano, S. Takasaki, T. Takenaka, Y. Takeuchi, M. Tawada, M. Tejima, M. Tobiyama, N. Tokuda, S. Uehara, S. Uno, Y. Yamamoto, Y. Yano, K. Yokoyama, Ma. Yoshida, M. Yoshida, S. I. Yoshimoto, K. Yoshino
    KEK, Ibaraki
  • E. Perevedentsev, D. N. Shatilov
    BINP SB RAS, Novosibirsk
 
  The crab cavities are presently being installed in the KEKB rings to compensate the crossing angle at collision and thus increase luminosity. This will be the first experience with such cavities in colliders. Results on the beam operation of the new cavities, both for single and colliding beams, will be presented including the luminosity performance and limitations.

Work presented on behalf of the KEKB Accelerator Group.

 
slides icon Slides  
WEPMN026 Test Operation of Ball-Screw-Type Tuner for Low-Loss High-Gradient Superconducting Cavity in a Cryomodule 2104
 
  • T. Higo, F. Furuta, Y. Higashi, T. Saeki, K. Saito, M. Satoh, H. Yamaoka
    KEK, Ibaraki
 
  We are constructing a Superconducting RF Test Facility (STF) at KEK as an R&D for ILC accelerator. In STF, four Low-Loss (LL) type 9-cell cavities will be installed into a cryomodule. We are developing ball-screw-type tuner for these cavities aiming at the accelerating gradient of 45 MV/m. At the end of 2006, we installed one LL 9-cell cavity dressed with the ball-screw tuner into the cryomodule. It will be operated without beam in 2007. This paper describes the results of the first operation of the ball-screw tuner for LL 9-cell cavity in the cryomodule of STF.  
THPMN030 Enhancement of the Positron Intensity by a Tungsten Single Crystal Target at the KEKB Injector Linac 2778
 
  • T. Suwada, K. Furukawa, T. Kamitani, H. Okuno, M. Satoh, T. Sugimura, K. Umemori
    KEK, Ibaraki
  • R. Chehab
    IN2P3 IPNL, Villeurbanne
  • R. Hamatsu, T. Haruna, T. Sumiyoshi
    TMU, Hatioji-shi, Tokyo
  • A. Potylitsyn
    INPR, Tomsk
  • I. S. Tropin
    TPU, Tomsk
  • K. Yoshida
    SAGA, Tosu
 
  Funding: This work was supported by the Grant-in-Aid of Ministry of Education, Culture, Sports, Science and Technology of Japan and by the grant of Ministry of Education and Science of the Russian Federation.

A new tungsten single-crystalline positron target has been successfully employed for generation of the intense positron beam at the KEKB injector linac in September 2006. The target is composed of a tungsten single-crystal with a thickness of 10.5 mm. The positron production target is bombarded at an incident electron energy of 4 GeV, and the produced positrons are collected and accelerated up to the final injection energy of 3.5 GeV in the succeeding sections. A conventional tungsten plate with a thickness of 14 mm has been used previously, and the conversion efficiency (Ne+/Ne-), the ratio between the number of positrons (Ne+) captured in the positron capture section and the number of the incident electrons (Ne-), was 0.20 on average. By replacing the tungsten plate with the tungsten crystal, it increased to 0.25 on average. The increase of the conversion efficiency has boosted the positron intensity to its maximum since the beginning of KEKB operation in 1999. Now this new positron source is stably operating and is contributing to increasing the integrated luminosity of the KEKB B-factory.

 
TUPMN044 Status of R&D Efforts Toward the ERL-based Future Light Source in Japan 1016
 
  • T. Kasuga, T. A. Agoh, A. Enomoto, S. Fukuda, K. Furukawa, T. Furuya, K. Haga, K. Harada, S. Hiramatsu, T. Honda, K. Hosoyama, M. Izawa, E. Kako, H. Kawata, M. Kikuchi, Y. Kobayashi, M. Kuriki, T. Mitsuhashi, T. Miyajima, S. Nagahashi, T. Naito, T. Nogami, S. Noguchi, T. Obina, S. Ohsawa, M. Ono, T. Ozaki, S. Sakanaka, H. Sasaki, S. Sasaki, K. Satoh, M. Satoh, T. Shioya, T. Shishido, T. Suwada, M. Tadano, T. Takahashi, Y. Tanimoto, M. Tawada, M. Tobiyama, K. Tsuchiya, T. Uchiyama, K. Umemori, S. Yamamoto
    KEK, Ibaraki
  • R. Hajima, H. Iijima, N. Kikuzawa, E. J. Minehara, R. Nagai, N. Nishimori, M. Sawamura
    JAEA/ERL, Ibaraki
  • H. Hanaki, H. T. Tomizawa
    JASRI/SPring-8, Hyogo-ken
  • A. Ishii, I. Ito, H. Kudoh, N. Nakamura, H. Sakai, S. Shibuya, K. Shinoe, H. Takaki
    ISSP/SRL, Chiba
  • M. Katoh, A. Mochihashi, M. Shimada
    UVSOR, Okazaki
 
  Energy Recovery Linacs (ERL), based on superconducting accelerators, are one of the most promising synchrotron light sources in future. The KEK and the JAEA, in collaboration with the ISSP, the UVSOR, and the SPring-8, are considering to realize together the ERL-based next-generation light source in Japan. To establish key technologies for that, active R&D efforts started. The R&D program includes the developments of ultra-low-emittance photocathode guns and of superconducting cavities, as well as experimental proofs of accelerator-physics issues at the ERL test facility, which will be built at the KEK campus. We are currently working on constructing a prototype photocathode gun, on designing superconducing cavities, and on designing a prototype ERL. The current plan of the prototype ERL comprises a full injector linac, one or two cryomodules for the main linac, and the beam return loop, which can be operated at beam energies from 60 to 160 MeV. The up-to-date R&D status will be reported.  
TUPAN045 Beam Operation with Crab Cavities at KEKB 1487
 
  • H. Koiso, T. Abe, T. A. Agoh, K. Akai, M. Akemoto, A. Akiyama, A. Arinaga, K. Ebihara, K. Egawa, A. Enomoto, J. W. Flanagan, S. Fukuda, H. Fukuma, Y. Funakoshi, K. Furukawa, T. Furuya, K. Hara, T. Higo, S. Hiramatsu, H. Hisamatsu, H. Honma, T. Honma, K. Hosoyama, T. Ieiri, N. Iida, H. Ikeda, M. Ikeda, S. Inagaki, S. Isagawa, H. Ishii, A. Kabe, E. Kadokura, T. Kageyama, K. Kakihara, E. Kako, S. Kamada, T. Kamitani, K.-I. Kanazawa, H. Katagiri, S. Kato, T. Kawamoto, S. Kazakov, M. Kikuchi, E. Kikutani, K. Kitagawa, Y. Kojima, I. Komada, T. Kubo, K. Kudo, N. K. Kudo, K. Marutsuka, M. Masuzawa, S. Matsumoto, T. Matsumoto, S. Michizono, K. Mikawa, T. Mimashi, S. Mitsunobu, K. Mori, A. Morita, Y. Morita, H. Nakai, H. Nakajima, T. T. Nakamura, H. Nakanishi, K. Nakao, S. Ninomiya, Y. Ogawa, K. Ohmi, Y. Ohnishi, S. Ohsawa, Y. Ohsawa, N. Ohuchi, K. Oide, M. Ono, T. Ozaki, K. Saito, H. Sakai, Y. Sakamoto, M. Sato, M. Satoh, K. Shibata, T. Shidara, M. Shirai, A. Shirakawa, T. Sueno, M. Suetake, Y. Suetsugu, R. Sugahara, T. Sugimura, T. Suwada, O. Tajima, S. Takano, S. Takasaki, T. Takenaka, Y. Takeuchi, M. Tawada, M. Tejima, M. Tobiyama, N. Tokuda, S. Uehara, S. Uno, Y. Yamamoto, Y. Yano, K. Yokoyama, Ma. Yoshida, M. Yoshida, S. I. Yoshimoto, K. Yoshino
    KEK, Ibaraki
  • E. Perevedentsev
    BINP SB RAS, Novosibirsk
 
  Beam operation with crab cavities is planned in early 2007 at KEKB. The crab crossing scheme is expected to increase the vertical beam-beam tune-shift parameter significantly. One crab cavity will be installed in each ring where conditions for beam optics are matched to compensate the beam crossing angle of 22 mrad. Operation results on collision tuning with the crab cavities will be presented.

For the KEKB Accelerator Group.