A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Plum, M. A.

Paper Title Page
MOPAN040 Comparative Study on Lifetime of Stripper Foil using 650keV H- Ion Beam 245
 
  • A. Takagi, I. Sugai, Y. Takeda
    KEK, Ibaraki
  • C. S. Feigerle
    University of Tennessee, Knoxville, Tennessee
  • Y. Irie
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • M. A. Plum, R. W. Shaw
    ORNL, Oak Ridge, Tennessee
 
  Funding: This work is supported by the Japan Society for the Promotion of Science, under contract No. 18540303.

Thick carbon stripper foils of >300 μg/cm2 will be used as a stripping of H-ion beam for 3GeV Rapid Cycling Synchrotron (3GeV-RCS) of the J-PARC. The carbon foils with long lifetime even at >1800 K are required. For this purpose, we have developed a new irradiation system for the lifetime measurement using high current pulsed and dc H- beams of the KEK Cockcroft-Walton accelerator. These high power 650keV H- Ion beams can simulate the high energy deposition in carbon stripper foils at the J-PARC RCS. An automatic data acquisition system is also developed for recording the data of foil temperature and irradiated beam current. The Hybrid Boron mixed Carbon (HBC) stripper foils, which are developed at KEK are irradiated by high current H- ion beam up to 2000 K. A few SNS-diamond and commercially available carbon (CM) foils are also tested for comparing with HBC-foils. The results of the lifetime measurement of HBC and SNS-diamond including CM stripper foils are reported.

 
MOPAS050 Active Damping of the e-p Instability at the LANL PSR 548
 
  • R. C. McCrady, R. J. Macek, S. B. Walbridge, T. Zaugg
    LANL, Los Alamos, New Mexico
  • S. Assadi, C. Deibele, S. Henderson, M. A. Plum
    ORNL, Oak Ridge, Tennessee
  • J. M. Byrd
    LBNL, Berkeley, California
  • S.-Y. Lee
    IUCF, Bloomington, Indiana
  • M. T.F. Pivi
    SLAC, Menlo Park, California
 
  Funding: This work was supported by the United States Department of Energy under contracts DE-AC52-06NA25396 and W-7405-ENG-36.

A prototype of an analog, transverse (vertical) feedback system for active damping of the two-stream (e-p) instability has been developed and successfully tested at the Los Alamos National Laboratory Proton Storage Ring (PSR). This system was able to improve the instability threshold by approximately 30% (as measured by the change in RF buncher voltage at instability threshold). Evidence obtained from these tests suggests that further improvement in performance is limited by beam leakage into the gap at lower RF buncher voltage and the onset of instability in the horizontal plane, which had no feedback. Here we describe the present system configuration, system optimization, results of several recent experimental tests, and results from studies of factors limiting its performance.

 
MOPAS081 Spallation Neutron Source (SNS) Diamond Stripper Foil Development 620
 
  • R. W. Shaw, M. A. Plum, L. L. Wilson
    ORNL, Oak Ridge, Tennessee
  • M. J. Borden, T. Spickermann
    LANL, Los Alamos, New Mexico
  • C. S. Feigerle
    University of Tennessee, Knoxville, Tennessee
  • Y. Irie
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • I. Sugai, A. Takagi
    KEK, Ibaraki
 
  Funding: SNS is managed by UT-Battelle, LLC, for the U. S. DOE under contract DE-AC05-00OR22725. DOE contract W-7405-ENG-36 (LANL) and Japan SPS contract 18540303 (KEK) supported work at those institutions.

Diamond stripping foils are under development for the SNS. Free-standing, flat 350 microgram/cm2 foils as large as 17 x 25 mm have been prepared. These nano-textured polycrystalline foils are grown by microwave plasma-assisted chemical vapor deposition in a corrugated format to maintain their flatness. They are mechanically supported on a single edge by a residual portion of their silicon growth substrate; typical fine foil supporting wires are not required for diamond foils. Six foils were mounted on the SNS foil changer in early 2006 and have performed well in commissioning experiments at reduced operating power. A diamond foil was used during a recent experiment where 12 microCoulombs of protons, approximately 40% of the design value, were stored in the ring. A few diamond foils have been tested at LANSCE/PSR, where one foil was in service for a period of five months (820 Coulombs of integrated injected charge) before it was replaced. Diamond foils have also been tested in Japan at KEK (650 keV H-) where their lifetimes slightly surpassed those of evaporated carbon foils, but fell short of those for Sugai's new hybrid boron carbon (HBC) foils.

 
TUOBKI01 Experimental Characterization of the Spallation Neutron Source Accumulator Ring Collimation System 703
 
  • S. M. Cousineau, S. Assadi, J. A. Holmes, M. A. Plum
    ORNL, Oak Ridge, Tennessee
 
  Funding: ORNL/SNS is managed by UT-Battelle, LLC, for the U. S. Department of Energy under contract DE-AC05-00OR22725.

The SNS ring and associated transport lines, commissioned in January 2006, are designed to accumulate and deliver up to 1.5·1014, 1 GeV protons at 60 Hz to a liquid mercury target for neutron production. In order to control activation and to allow for routine hands-on maintenance of accelerator components, beam loss in most of the ring must remain below 1 W/m . For the full 1.4 MW beam, this translates to a fractional beam loss limit of 0.01%. Accomplishing this loss limit at full beam power will require successful utilization of the ring's two-stage betatron collimation system. In this paper we present the results of initial collimation experiments. We characterize the collimation-induced beam-loss pattern and compare our results with simulations. In addition, we discuss other existing beam-loss-related challenges in the ring.

 
slides icon Slides  
WEXC01 Experimental Tests of a Prototype System for Active Damping of the E-P Instability at the LANL PSR 1991
 
  • C. Deibele, S. Assadi, V. V. Danilov, S. Henderson, M. A. Plum, A. K. Polisetti
    ORNL, Oak Ridge, Tennessee
  • J. M. Byrd
    LBNL, Berkeley, California
  • J. D. Gilpatrick, R. C. McCrady, J. F. Power, T. Zaugg
    LANL, Los Alamos, New Mexico
  • S.-Y. Lee
    IUCF, Bloomington, Indiana
  • M. T.F. Pivi
    SLAC, Menlo Park, California
  • M. J. Schulte, Z. P. Xie
    UW-Madison, Madison, Wisconsin
 
  Funding: ORNL/SNS is managed by UT-Battelle, LLC, for the U. S. Department of Energy under contract DE-AC05-00OR22725.

A prototype of an analog, transverse (vertical) feedback system for active damping of the two-stream (e-p) instability has been developed and successfully tested at the Los Alamos Proton Storage Ring (PSR). This talk describes the system configuration, results of several experimental tests and studies of system optimization along with studies of the factors limiting its performance.

 
slides icon Slides  
WEPMS081 Simulation and Initial Test Result of the SNS Ring RF System 2520
 
  • Y. Zhang, M. S. Champion, P. Chu, S. M. Cousineau, V. V. Danilov, T. W. Hardek, J. A. Holmes, H. Ma, M. F. Piller, M. A. Plum
    ORNL, Oak Ridge, Tennessee
 
  Funding: SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U. S. Department of Energy

A simulation code has been developed for the study of the Spallation Neutron Source (SNS) ring RF control. The code uses the time-domain solvers to compute beam-cavity interactions, and FFT methods to simulate time responses of the linear RF system. The important ingredients of the system are considered in the simulation model, which include the beam loading, dynamic cavity detuning, circuit bandwidth, loop delay, proportional-integral (P-I) controller for feedback and adaptive feed forward, stochastic noise, with-in-turn RF parameter change, beam current fluctuation and beam bunch leakage, etc. The beam loss in the accumulation ring goes up as the beam power increases, and thus a precise control of bunching voltage phase and amplitude is required to limit beam loss. This simulation tool will help the development a correct RF control and to achieve the goal of minimizing the beam loss.

 
THXAB03 Commissioning of the Spallation Neutron Source Accelerator Systems 2603
 
  • M. A. Plum
    ORNL, Oak Ridge, Tennessee
 
  Funding: ORNL/SNS is managed by UT-Battelle, LLC, for the U. S. Department of Energy under contract DE-AC05-00OR22725.

The Spallation Neutron Source accelerator complex consists of a 2.5 MeV H- front-end injector system, a 186 MeV normal-conducting linear accelerator, a 1 GeV superconducting linear accelerator, an accumulator ring, and associated beam transport lines. The linac was commissioned in five discrete runs, starting in 2002 and completed in 2005. The accumulator ring and associated beam transport lines were commissioned in two runs in February and April 2006. With the completed commissioning of the SNS accelerator, the facility has begun initial low-power operations. In the course of beam commissioning, most beam performance parameters and beam intensity goals have been achieved at low duty factor. A number of beam dynamics measurements have been performed, including emittance evolution, transverse coupling in the ring, beam instability thresholds, and beam distributions on the target. The commissioning results, achieved beam performance and initial operating experience of the SNS will be presented.

 
slides icon Slides  
TUPAS074 Performance of the SNS Front End and Linac 1820
 
  • A. V. Aleksandrov, S. Assadi, W. Blokland, P. Chu, S. M. Cousineau, V. V. Danilov, C. Deibele, J. Galambos, S. Henderson, D.-O. Jeon, M. A. Plum, A. P. Shishlo, M. P. Stockli, Y. Zhang
    ORNL, Oak Ridge, Tennessee
 
  Funding: SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U. S. Department of Energy.

The Spallation Neutron Source accelerator systems will deliver a 1.0 GeV, 1.4 MW proton beam to a liquid mercury target for neutron scattering research. The accelerator complex consists of an H- injector, capable of producing one-ms-long pulses at 60 Hz repetition rate with 38 mA peak current, a 1 GeV linear accelerator, an accumulator ring and associated transport lines. The 2.5 MeV beam from the Front End is accelerated to 86 MeV in the Drift Tube Linac, then to 185 MeV in a Coupled-Cavity Linac and finally to 1 GeV in the Superconducting Linac. With the completion of beam commissioning, the accelerator complex began operation in June 2006 and beam power is being gradually ramped up toward the design goal. Operational experience with the injector and linac will be presented including chopper performance, transverse emittance evolution along the linac, and the results of a beam loss study.

 
THYKI02 Laser Stripping of H- beams: Theory and Experiments 2582
 
  • V. V. Danilov, A. V. Aleksandrov, S. Assadi, W. Blokland, S. M. Cousineau, C. Deibele, W. P. Grice, S. Henderson, J. A. Holmes, Y. Liu, M. A. Plum, A. P. Shishlo, A. Webster
    ORNL, Oak Ridge, Tennessee
  • I. Nesterenko
    BINP SB RAS, Novosibirsk
  • L. Waxer
    LJW, Saint Louis
 
  Funding: Research sponsored by LDRD Program of Oak Ridge National Laboratory, managed by UT-Battelle, LLC, for the U. S. Department of Energy under Contract No. DE-AC05-00OR22725.

Thin carbon foils are used as strippers for charge exchange injection into high intensity proton rings. However, the stripping foils become radioactive and produce uncontrolled beam loss, which is one of the main factors limiting beam power in high intensity proton rings. Recently, we presented a scheme for laser stripping an H- beam for the Spallation Neutron Source ring. First, H- atoms are converted to H0 by a magnetic field, then H0 atoms are excited from the ground state to the upper levels by a laser, and the excited states are converted to protons by a magnetic field. In this paper we report on the first successful proof-of-principle demonstration of this scheme to give high efficiency (around 90%) conversion of H- beam into protons at SNS in Oak Ridge. The experimental setup is described, and comparison of the experimental data with simulations is presented. In addition, future plans on building a practical laser stripping device are discussed.

 
slides icon Slides  
THPAS076 ORBIT Injection Dump Simulations of the H0 and H- Beams 3657
 
  • J. A. Holmes, M. A. Plum, J.-G. Wang, Y. Zhang
    ORNL, Oak Ridge, Tennessee
  • M. R. Perkett
    Denison University, Granville, Ohio
 
  Funding: ORNL/SNS is managed by UT-Battelle, LLC, for the U. S. Department of Energy under contract DE-AC05-00OR22725.

Simulations of the transport of H0 and H- beams to the SNS ring injection dump are carried out using the ORBIT code. During commissioning and early operations, beam losses in this region have been the highest in the accelerator and presented the most obvious hurdle to cross in achieving high intensity operation. Two tracking models are employed:

  1. a piecewise continuous symplectic representation of the lattice elements in the injection chicane and dump line, and
  2. particle tracking in full 3D magnetic fields, as obtained from OPERA code evaluations.
The physics models also include estimations of scattering from both the primary and secondary stripper foils, and beam losses due to apertures throughout the beam line.