MOPAS079 Spallation Neutron Source (SNS) High Pulse Repetition Rate Considerations 614
 
  • M. P. McCarthy, D. E. Anderson, I. E. Campisi, F. Casagrande, R. I. Cutler, G. W. Dodson, J. Galambos, D. P. Gurd, Y. W. Kang, K.-U. Kasemir, S.-H. Kim, H. Ma, B. W. Riemer, J. P. Schubert, M. P. Stockli
    ORNL, Oak Ridge, Tennessee
 
  Funding: SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U. S. Department of Energy.

Increasing the pulse repetition rate (PRR) of the SNS Linac to its designed maximum of 60 Hz to provide 1.4 MW of beam on target is in progress. Operation above 60 Hz in the future to provide beam to a second target is also being considered. Increasing the PRR to 80 Hz would allow the additional pulses to be diverted to a second target. This paper discusses the impact of increasing the PRR on the SNS infrastructure including Radio Frequency (RF) systems and structures, the ion source, cryogenics, controls and the target.

 
WEPMS074 Design and High Power Processing of RFQ Input Power Couplers 2505
 
  • Y. W. Kang, A. V. Aleksandrov, D. E. Anderson, M. S. Champion, M. T. Crofford, P. E. Gibson, T. W. Hardek, P. Ladd, M. P. McCarthy, D. Stout, A. V. Vassioutchenko
    ORNL, Oak Ridge, Tennessee
 
  Funding: This work was supported by SNS through UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U. S. Department of Energy.

A RF power coupling system has been developed for future upgrade of input coupling of the RFQ in the SNS linac. The design employs two coaxial loop couplers for 402.5 MHz operation. Each loop is fed through a coaxial ceramic window that is connected to an output of a magic-T waveguide hybrid through a coaxial to waveguide transition. The coaxial loop couplers are designed, manufactured, and high power processed. Two couplers will be used in parallel to power the accelerating structure with up to total 800 kW peak power at 8% duty cycle. RF and mechanical properties of the couplers are discussed. Result of high power RF conditioning that is performed in the RF test facility of the SNS is presented.

 
WEPMS075 Development and Testing of High Power RF Vector Modulators 2508
 
  • Y. W. Kang, M. S. Champion, T. W. Hardek, S.-H. Kim, M. P. McCarthy, A. V. Vassioutchenko, J. L. Wilson
    ORNL, Oak Ridge, Tennessee
 
  Funding: This work was supported by SNS through UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U. S. Department of Energy.

High power vector modulators can allow a fan-out RF power distribution system that can power many accelerating cavities from a single high-power klystron amplifier. The configuration enables independent control of amplitudes and phases of RF voltages at the cavities. A vector modulator employs either one or two hybrids with two fast phase shifters. Prototype high power RF vector modulators employing a hybrid and two fast ferrite phase shifters in coaxial TEM transmission lines for 402.5 MHz and 805 MHz are built and tested. RF properties of the design and result of high power testing are presented.

 
WEPMS076 Status of the SNS Cryomodule Test 2511
 
  • S.-H. Kim, I. E. Campisi, F. Casagrande, M. T. Crofford, Y. W. Kang, Z. Kursun, D. Stout, A. V. Vassioutchenko
    ORNL, Oak Ridge, Tennessee
 
  Funding: SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U. S. Department of Energy

The cryomodule tests are on going to have better understandings of physics as a whole and eventually to provide safe and reliable operation for neutron production. Some features are revealed to be interesting issues and need more attentions than expected, such as operating condition, collective effects between cavities, HOM coupler issues, end-group stability, cavity-coupler interactions, and vacuum/gas physics, waiting for more investigations. Up to now SNS cryomodules were mainly tested at 4.4 K, 10 pulse per second (pps) and 30 pps/60 pps tests are under progress. This paper presents the experiences and the observations during tests of cryomodules.

 
WEPMS080 SRF Cavity Transient Beam Loading Detection - Simulation and Measurement 2517
 
  • Y. Zhang, I. E. Campisi, C. Deibele, J. Galambos, S. Henderson, Y. W. Kang, H. Ma, J. L. Wilson
    ORNL, Oak Ridge, Tennessee
 
  Funding: SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U. S. Department of Energy.

Beam phase measurement based on detection of transient beam loading signal in a Superconducting (SC) cavity is utilized to setup the cavity synchronous phase. It has the potential to become a fast tune-up technique for a high intensity SC electron linac, as cavity phase could be determined precisely with only a few beam pulses. The paper introduces a transient detector study in the Spallation Neutron Source (SNS) proton linac, and discusses one of the major challenges - stochastic noise in the cavity RF system, which deteriorates the precision and increases the time needed for phase measurement with this technique. We analyze the influence of RF noise to the phase measurement in a simulation study with a beam-cavity model. Beam signal measurement with the cavity Low Level RF (LLRF) system and the initial experiment of prototype detectors are briefly introduced.

 
MOPAS082 Status of the Spallation Neutron Source Superconducting RF Facilities 623
 
  • D. Stout, S. Assadi, I. E. Campisi, F. Casagrande, M. T. Crofford, W. R. DeVan, X. Geng, T. W. Hardek, S. Henderson, M. P. Howell, Y. W. Kang, W. C. Stone, W. H. Strong, D. C. Williams, P. A. Wright
    ORNL, Oak Ridge, Tennessee
 
  Funding: SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U. S. Department of Energy

The SNS project was completed with only limited SRF facilities installed as part of the project, namely a 5 MW, 805 MHz RF test stand, a fundamental power coupler processing system, a concrete test cave shell, and temporary cleaning/assembly facilities. A concerted effort has been initiated to install the infrastructure and equipment necessary to maintain and repair the superconducting Linac, and to support power upgrade R&D. Installation of a Class10/100/10,000 cleanroom and outfitting of the test cave with RF, vacuum, controls, personnel protection and cryogenics systems is underway. A horizontal cryostat, which can house a helium vessel/cavity and fundamental power coupler for full power, pulsed testing, is being procured. Equipment for cryomodule assembly/disassembly and cavity processing also is being designed. This effort, while derived from the experience of the SRF community, will provide a unique high power test capability as well as long term maintenance capabilities. This paper presents the current status and the future plans for the SNS SRF facilities.

 
WEOCKI03 Status of the R&D Towards Electron Cooling of RHIC 1938
 
  • I. Ben-Zvi, J. Alduino, D. S. Barton, D. Beavis, M. Blaskiewicz, J. M. Brennan, A. Burrill, R. Calaga, P. Cameron, X. Chang, K. A. Drees, A. V. Fedotov, W. Fischer, G. Ganetis, D. M. Gassner, J. G. Grimes, H. Hahn, L. R. Hammons, A. Hershcovitch, H.-C. Hseuh, D. Kayran, J. Kewisch, R. F. Lambiase, D. L. Lederle, V. Litvinenko, C. Longo, W. W. MacKay, G. J. Mahler, G. T. McIntyre, W. Meng, B. Oerter, C. Pai, G. Parzen, D. Pate, D. Phillips, S. R. Plate, E. Pozdeyev, T. Rao, J. Reich, T. Roser, A. G. Ruggiero, T. Russo, C. Schultheiss, Z. Segalov, J. Smedley, K. Smith, T. Tallerico, S. Tepikian, R. Than, R. J. Todd, D. Trbojevic, J. E. Tuozzolo, P. Wanderer, G. Wang, D. Weiss, Q. Wu, K. Yip, A. Zaltsman
    BNL, Upton, Long Island, New York
  • D. T. Abell, G. I. Bell, D. L. Bruhwiler, R. Busby, J. R. Cary, D. A. Dimitrov, P. Messmer, V. H. Ranjbar, D. S. Smithe, A. V. Sobol, P. Stoltz
    Tech-X, Boulder, Colorado
  • A. V. Aleksandrov, D. L. Douglas, Y. W. Kang
    ORNL, Oak Ridge, Tennessee
  • H. Bluem, M. D. Cole, A. J. Favale, D. Holmes, J. Rathke, T. Schultheiss, J. J. Sredniawski, A. M.M. Todd
    AES, Princeton, New Jersey
  • A. V. Burov, S. Nagaitsev, L. R. Prost
    Fermilab, Batavia, Illinois
  • Y. S. Derbenev, P. Kneisel, J. Mammosser, H. L. Phillips, J. P. Preble, C. E. Reece, R. A. Rimmer, J. Saunders, M. Stirbet, H. Wang
    Jefferson Lab, Newport News, Virginia
  • V. V. Parkhomchuk, V. B. Reva
    BINP SB RAS, Novosibirsk
  • A. O. Sidorin, A. V. Smirnov
    JINR, Dubna, Moscow Region
 
  Funding: Work done under the auspices of the US DOE with support from the US DOD.

The physics interest in a luminosity upgrade of RHIC requires the development of a cooling-frontier facility. Detailed cooling calculations have been made to determine the efficacy of electron cooling of the stored RHIC beams. This has been followed by beam dynamics simulations to establish the feasibility of creating the necessary electron beam. Electron cooling of RHIC at collisions requires electron beam energy up to about 54 MeV at an average current of between 50 to 100 mA and a particularly bright electron beam. The accelerator chosen to generate this electron beam is a superconducting Energy Recovery Linac (ERL) with a superconducting RF gun with a laser-photocathode. An intensive experimental R&D program engages the various elements of the accelerator: Photocathodes of novel design, superconducting RF electron gun of a particularly high current and low emittance, a very high-current ERL cavity and a demonstration ERL using these components.

 
slides icon Slides  
WEPMS072 Status and Performance of the Spallation Neutron Source Superconducting Linac 2502
 
  • I. E. Campisi, S. Assadi, F. Casagrande, M. S. Champion, M. T. Crofford, G. W. Dodson, J. Galambos, M. Giannella, S. Henderson, M. P. Howell, Y. W. Kang, K.-U. Kasemir, S.-H. Kim, Z. Kursun, P. Ladd, H. Ma, D. Stout, W. H. Strong, Y. Zhang
    ORNL, Oak Ridge, Tennessee
 
  Funding: SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U. S. Department of Energy

The Superconducting Linac at SNS has been operating with beam for almost two years. As the first operational pulsed superconducting linac, many of the aspect of its performance were unknown and unpredictable. A lot of experience has been gathered during the commissioning of its components, during the beam turn on and during operation at increasingly higher beam power. Some cryomodules have been cold for well over two years and have been extensively tested. The operation has been consistently conducted at 4.4 K and 10 and 15 pulses per second, with some cryomodules tested at 30 and 60 pps and some tests performed at 2 K. Careful balance between safe operational limits and the study of conditions, parameters and components that create physical limits has been achieved. This paper presents the experience and the performance of the superconducting cavities and of the associated systems with and without beam.

 
FROAAB02 Advanced RF-Driven H- Ion Sources at the SNS 3774
 
  • R. F. Welton, J. R. Carmichael, J. Carr, D. W. Crisp, R. H. Goulding, Y. W. Kang, N. P. Luciano, S. Murray, M. P. Stockli
    ORNL, Oak Ridge, Tennessee
 
  The power upgrade of the US Spallation Neutron Source* (SNS) will require substantially higher average H- beam current from the ion source than can be produced using the baseline source. H- currents of 70-100 mA with an RMS emittance of 0.20-0.35 mm mrad, respectively, and a ~7% duty-factor will have to be injected into the accelerator. We are, therefore, investigating several advanced ion source concepts based on RF-excited plasmas. We have designed and tested three inductively coupled ion sources featuring external antennas. First, a simple prototype source was developed based on a ceramic plasma chamber and no magnetic plasma confinement. Next, a source featuring an internal Faraday shield with integrated magnetic multicusp plasma confinement was investigated as well as an ion source based on an AlN plasma chamber and external multicusp confinement field. H- generation in each source is quantified and compared. Also, experiments investigating the possibility of using helicon-wave coupling were performed and are reported. Finally, an advanced elemental Cs collar and feed system was developed and tested with each source.

ORNL/SNS is managed by UT-Battelle, LLC, for the U. S. Department of Energy under contract DE-AC05-00OR22725