A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Iida, N.

Paper Title Page
MOZAKI01 Compensation of the Crossing Angle with Crab Cavities at KEKB 27
 
  • K. Oide, T. Abe, K. Akai, M. Akemoto, A. Akiyama, A. Arinaga, K. Ebihara, K. Egawa, A. Enomoto, J. W. Flanagan, S. Fukuda, H. Fukuma, Y. Funakoshi, K. Furukawa, T. Furuya, K. Hara, T. Higo, S. Hiramatsu, H. Hisamatsu, H. Honma, K. Hosoyama, T. Ieiri, N. Iida, H. Ikeda, M. Ikeda, S. Isagawa, H. Ishii, A. Kabe, E. Kadokura, T. Kageyama, K. Kakihara, E. Kako, S. Kamada, T. Kamitani, K.-I. Kanazawa, H. Katagiri, S. Kato, T. Kawamoto, S. Kazakov, M. Kikuchi, E. Kikutani, K. Kitagawa, H. Koiso, Y. Kojima, K. Komada, T. Kubo, K. Kudo, N. K. Kudo, K. Marutsuka, M. Masuzawa, S. Matsumoto, T. Matsumoto, S. Michizono, K. Mikawa, T. Mimashi, S. Mitsunobu, K. Mori, A. Morita, Y. Morita, H. Nakai, H. Nakajima, T. T. Nakamura, H. Nakanishi, K. Nakao, S. Ninomiya, Y. Ogawa, K. Ohmi, Y. Ohnishi, S. Ohsawa, Y. Ohsawa, N. Ohuchi, M. Ono, T. Ozaki, K. Saito, H. Sakai, Y. Sakamoto, M. Sato, M. Satoh, K. Shibata, T. Shidara, M. Shirai, A. Shirakawa, T. Sueno, M. Suetake, Y. Suetsugu, R. Sugahara, T. Sugimura, T. Suwada, O. Tajima, S. Takano, S. Takasaki, T. Takenaka, Y. Takeuchi, M. Tawada, M. Tejima, M. Tobiyama, N. Tokuda, S. Uehara, S. Uno, Y. Yamamoto, Y. Yano, K. Yokoyama, Ma. Yoshida, M. Yoshida, S. I. Yoshimoto, K. Yoshino
    KEK, Ibaraki
  • E. Perevedentsev, D. N. Shatilov
    BINP SB RAS, Novosibirsk
 
  The crab cavities are presently being installed in the KEKB rings to compensate the crossing angle at collision and thus increase luminosity. This will be the first experience with such cavities in colliders. Results on the beam operation of the new cavities, both for single and colliding beams, will be presented including the luminosity performance and limitations.

Work presented on behalf of the KEKB Accelerator Group.

 
slides icon Slides  
TUPAN042 Synchroton Radiation Interferometer Calibration Check by Use of a Size Control Bump in KEKB 1478
 
  • N. Iida, J. W. Flanagan, Y. Funakoshi, K. Oide
    KEK, Ibaraki
 
  KEKB B-Factory is one of the second generation lepton colliders. The energies of the two beams are 3.5 GeV for positron and 8 GeV for electron. Synchrotron Radiation Monitors(SRMs) are installed in the both rings and usually used for measuring beam sizes on real times. On the other hand, we use useful vertical bumps to control beam sizes of the beams. In this paper a method for calibrating the SRM by using the vertical bumps is described.  
TUPAN045 Beam Operation with Crab Cavities at KEKB 1487
 
  • H. Koiso, T. Abe, T. A. Agoh, K. Akai, M. Akemoto, A. Akiyama, A. Arinaga, K. Ebihara, K. Egawa, A. Enomoto, J. W. Flanagan, S. Fukuda, H. Fukuma, Y. Funakoshi, K. Furukawa, T. Furuya, K. Hara, T. Higo, S. Hiramatsu, H. Hisamatsu, H. Honma, T. Honma, K. Hosoyama, T. Ieiri, N. Iida, H. Ikeda, M. Ikeda, S. Inagaki, S. Isagawa, H. Ishii, A. Kabe, E. Kadokura, T. Kageyama, K. Kakihara, E. Kako, S. Kamada, T. Kamitani, K.-I. Kanazawa, H. Katagiri, S. Kato, T. Kawamoto, S. Kazakov, M. Kikuchi, E. Kikutani, K. Kitagawa, Y. Kojima, I. Komada, T. Kubo, K. Kudo, N. K. Kudo, K. Marutsuka, M. Masuzawa, S. Matsumoto, T. Matsumoto, S. Michizono, K. Mikawa, T. Mimashi, S. Mitsunobu, K. Mori, A. Morita, Y. Morita, H. Nakai, H. Nakajima, T. T. Nakamura, H. Nakanishi, K. Nakao, S. Ninomiya, Y. Ogawa, K. Ohmi, Y. Ohnishi, S. Ohsawa, Y. Ohsawa, N. Ohuchi, K. Oide, M. Ono, T. Ozaki, K. Saito, H. Sakai, Y. Sakamoto, M. Sato, M. Satoh, K. Shibata, T. Shidara, M. Shirai, A. Shirakawa, T. Sueno, M. Suetake, Y. Suetsugu, R. Sugahara, T. Sugimura, T. Suwada, O. Tajima, S. Takano, S. Takasaki, T. Takenaka, Y. Takeuchi, M. Tawada, M. Tejima, M. Tobiyama, N. Tokuda, S. Uehara, S. Uno, Y. Yamamoto, Y. Yano, K. Yokoyama, Ma. Yoshida, M. Yoshida, S. I. Yoshimoto, K. Yoshino
    KEK, Ibaraki
  • E. Perevedentsev
    BINP SB RAS, Novosibirsk
 
  Beam operation with crab cavities is planned in early 2007 at KEKB. The crab crossing scheme is expected to increase the vertical beam-beam tune-shift parameter significantly. One crab cavity will be installed in each ring where conditions for beam optics are matched to compensate the beam crossing angle of 22 mrad. Operation results on collision tuning with the crab cavities will be presented.

For the KEKB Accelerator Group.