A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Hiramatsu, S.

Paper Title Page
MOZAKI01 Compensation of the Crossing Angle with Crab Cavities at KEKB 27
 
  • K. Oide, T. Abe, K. Akai, M. Akemoto, A. Akiyama, A. Arinaga, K. Ebihara, K. Egawa, A. Enomoto, J. W. Flanagan, S. Fukuda, H. Fukuma, Y. Funakoshi, K. Furukawa, T. Furuya, K. Hara, T. Higo, S. Hiramatsu, H. Hisamatsu, H. Honma, K. Hosoyama, T. Ieiri, N. Iida, H. Ikeda, M. Ikeda, S. Isagawa, H. Ishii, A. Kabe, E. Kadokura, T. Kageyama, K. Kakihara, E. Kako, S. Kamada, T. Kamitani, K.-I. Kanazawa, H. Katagiri, S. Kato, T. Kawamoto, S. Kazakov, M. Kikuchi, E. Kikutani, K. Kitagawa, H. Koiso, Y. Kojima, K. Komada, T. Kubo, K. Kudo, N. K. Kudo, K. Marutsuka, M. Masuzawa, S. Matsumoto, T. Matsumoto, S. Michizono, K. Mikawa, T. Mimashi, S. Mitsunobu, K. Mori, A. Morita, Y. Morita, H. Nakai, H. Nakajima, T. T. Nakamura, H. Nakanishi, K. Nakao, S. Ninomiya, Y. Ogawa, K. Ohmi, Y. Ohnishi, S. Ohsawa, Y. Ohsawa, N. Ohuchi, M. Ono, T. Ozaki, K. Saito, H. Sakai, Y. Sakamoto, M. Sato, M. Satoh, K. Shibata, T. Shidara, M. Shirai, A. Shirakawa, T. Sueno, M. Suetake, Y. Suetsugu, R. Sugahara, T. Sugimura, T. Suwada, O. Tajima, S. Takano, S. Takasaki, T. Takenaka, Y. Takeuchi, M. Tawada, M. Tejima, M. Tobiyama, N. Tokuda, S. Uehara, S. Uno, Y. Yamamoto, Y. Yano, K. Yokoyama, Ma. Yoshida, M. Yoshida, S. I. Yoshimoto, K. Yoshino
    KEK, Ibaraki
  • E. Perevedentsev, D. N. Shatilov
    BINP SB RAS, Novosibirsk
 
  The crab cavities are presently being installed in the KEKB rings to compensate the crossing angle at collision and thus increase luminosity. This will be the first experience with such cavities in colliders. Results on the beam operation of the new cavities, both for single and colliding beams, will be presented including the luminosity performance and limitations.

Work presented on behalf of the KEKB Accelerator Group.

 
slides icon Slides  
TUPMN044 Status of R&D Efforts Toward the ERL-based Future Light Source in Japan 1016
 
  • T. Kasuga, T. A. Agoh, A. Enomoto, S. Fukuda, K. Furukawa, T. Furuya, K. Haga, K. Harada, S. Hiramatsu, T. Honda, K. Hosoyama, M. Izawa, E. Kako, H. Kawata, M. Kikuchi, Y. Kobayashi, M. Kuriki, T. Mitsuhashi, T. Miyajima, S. Nagahashi, T. Naito, T. Nogami, S. Noguchi, T. Obina, S. Ohsawa, M. Ono, T. Ozaki, S. Sakanaka, H. Sasaki, S. Sasaki, K. Satoh, M. Satoh, T. Shioya, T. Shishido, T. Suwada, M. Tadano, T. Takahashi, Y. Tanimoto, M. Tawada, M. Tobiyama, K. Tsuchiya, T. Uchiyama, K. Umemori, S. Yamamoto
    KEK, Ibaraki
  • R. Hajima, H. Iijima, N. Kikuzawa, E. J. Minehara, R. Nagai, N. Nishimori, M. Sawamura
    JAEA/ERL, Ibaraki
  • H. Hanaki, H. T. Tomizawa
    JASRI/SPring-8, Hyogo-ken
  • A. Ishii, I. Ito, H. Kudoh, N. Nakamura, H. Sakai, S. Shibuya, K. Shinoe, H. Takaki
    ISSP/SRL, Chiba
  • M. Katoh, A. Mochihashi, M. Shimada
    UVSOR, Okazaki
 
  Energy Recovery Linacs (ERL), based on superconducting accelerators, are one of the most promising synchrotron light sources in future. The KEK and the JAEA, in collaboration with the ISSP, the UVSOR, and the SPring-8, are considering to realize together the ERL-based next-generation light source in Japan. To establish key technologies for that, active R&D efforts started. The R&D program includes the developments of ultra-low-emittance photocathode guns and of superconducting cavities, as well as experimental proofs of accelerator-physics issues at the ERL test facility, which will be built at the KEK campus. We are currently working on constructing a prototype photocathode gun, on designing superconducing cavities, and on designing a prototype ERL. The current plan of the prototype ERL comprises a full injector linac, one or two cryomodules for the main linac, and the beam return loop, which can be operated at beam energies from 60 to 160 MeV. The up-to-date R&D status will be reported.  
TUPAN045 Beam Operation with Crab Cavities at KEKB 1487
 
  • H. Koiso, T. Abe, T. A. Agoh, K. Akai, M. Akemoto, A. Akiyama, A. Arinaga, K. Ebihara, K. Egawa, A. Enomoto, J. W. Flanagan, S. Fukuda, H. Fukuma, Y. Funakoshi, K. Furukawa, T. Furuya, K. Hara, T. Higo, S. Hiramatsu, H. Hisamatsu, H. Honma, T. Honma, K. Hosoyama, T. Ieiri, N. Iida, H. Ikeda, M. Ikeda, S. Inagaki, S. Isagawa, H. Ishii, A. Kabe, E. Kadokura, T. Kageyama, K. Kakihara, E. Kako, S. Kamada, T. Kamitani, K.-I. Kanazawa, H. Katagiri, S. Kato, T. Kawamoto, S. Kazakov, M. Kikuchi, E. Kikutani, K. Kitagawa, Y. Kojima, I. Komada, T. Kubo, K. Kudo, N. K. Kudo, K. Marutsuka, M. Masuzawa, S. Matsumoto, T. Matsumoto, S. Michizono, K. Mikawa, T. Mimashi, S. Mitsunobu, K. Mori, A. Morita, Y. Morita, H. Nakai, H. Nakajima, T. T. Nakamura, H. Nakanishi, K. Nakao, S. Ninomiya, Y. Ogawa, K. Ohmi, Y. Ohnishi, S. Ohsawa, Y. Ohsawa, N. Ohuchi, K. Oide, M. Ono, T. Ozaki, K. Saito, H. Sakai, Y. Sakamoto, M. Sato, M. Satoh, K. Shibata, T. Shidara, M. Shirai, A. Shirakawa, T. Sueno, M. Suetake, Y. Suetsugu, R. Sugahara, T. Sugimura, T. Suwada, O. Tajima, S. Takano, S. Takasaki, T. Takenaka, Y. Takeuchi, M. Tawada, M. Tejima, M. Tobiyama, N. Tokuda, S. Uehara, S. Uno, Y. Yamamoto, Y. Yano, K. Yokoyama, Ma. Yoshida, M. Yoshida, S. I. Yoshimoto, K. Yoshino
    KEK, Ibaraki
  • E. Perevedentsev
    BINP SB RAS, Novosibirsk
 
  Beam operation with crab cavities is planned in early 2007 at KEKB. The crab crossing scheme is expected to increase the vertical beam-beam tune-shift parameter significantly. One crab cavity will be installed in each ring where conditions for beam optics are matched to compensate the beam crossing angle of 22 mrad. Operation results on collision tuning with the crab cavities will be presented.

For the KEKB Accelerator Group.

 
FRPMN035 Crabbing Angle Measurement by Streak Camera at KEKB 4018
 
  • H. Ikeda, J. W. Flanagan, H. Fukuma, S. Hiramatsu, T. Mitsuhashi
    KEK, Ibaraki
 
  Crab cavities will be installed in the KEKB rings in order to increase luminosity. We measure the crabbing angle using a streak camera and show the results in this paper.  
FRPMN041 Study on the Longitudinal Impedance of BPM for KEKB and Super KEKB 4048
 
  • K. Shibata, H. Fukuma, S. Hiramatsu, Y. Suetsugu, M. Tejima, M. Tobiyama
    KEK, Ibaraki
 
  The longitudinal impedance of the KEK B-factory (KEKB) button-type beam position monitors (BPMs) was recalculated by MAFIA in preparation for a future plan to increase the beam current. The diameter and the gap of the button electrode were 12 mm and 1 mm, respectively. For High Energy Ring (HER), an asymmetric structure was applied to extract the TE110 mode into the coaxial cable. The Q-value and shunt impedance were estimated at 91 and 17 Ω (at 7.6 GHz) respectively, and the beam current limit for longitudinal multi-bunch instability was 2.6 A. On the other hand, the electrode of Low Energy Ring (LER) BPM had a symmetric structure and the Q-value and shunt impedance were estimated at 133 and 8 Ω (at 7.6 GHz). In this case, the current limit was 1.7 A. Based on the experiences at the KEKB, the new BPM was designed for the Super KEKB, a future high-intensity B-factory at KEK. In order to reduce the impedance the electrode diameter was cut down to 6 mm from 12 mm. The Q-value and shunt impedance were estimated at 23 and 2 Ω (at 13 GHz). The current limit was expected to be about 7 A in full bucket operation (5120 bunches), and more than 10 kA in 4-bucket spacing operation.