A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Yanagida, K.

Paper Title Page
FPAE063 Enhancements of Machine Reliability and Beam Quality in SPring-8 Linac for Top-Up Injection into Two Storage Rings 3585
 
  • H. Hanaki, T. Asaka, H. Dewa, T. Kobayashi, A. Mizuno, S. Suzuki, T. Taniuchi, H. Tomizawa, K. Yanagida
    JASRI/SPring-8, Hyogo
 
  SPring-8 has started its top-up operation from May 2004 in order to feed constant photon fluxes to users. The SPring-8 linac has been improved to realize stable and uninterrupted top-up injection into the SPring-8 storage ring and the NewSUBARU storage ring. The beam energy instability of 0.01% rms had been achieved by the following stabilization: RF amplitude and phase stabilization, synchronization of beam timing and linac's 2856 MHz RF and introduction of an energy compensation system (ECS). Feedback controls of steering magnets compensate long-term variation of beam trajectories at ends of beam transport lines. The presentation will include also recent improvements.