Paper | Title | Page |
---|---|---|
WPAE042 | Beam Loss and Residual Activation Trending | 2726 |
|
||
Funding: This work was supported by SNS through UT-Batelle, LLC, under contract DE-AC05-00OR22725 for the U.S. DOE. The SNS is a partnership of six national laboratories: Argonne, Brookhaven, Jefferson, Lawrence Berkeley, Los Alamos, and Oak Ridge. The SNS Front End, Drift Tube Linac and most of the Coupled Cavity Linac have been operated during commissioning. Beam loss data were taken with differential Beam Current Monitors, and Beam loss Monitors during commissioning. Residual activation data were taken at various times during and after the run. An analysis of beam loss trending, beam loss monitor data and residual activation will be shown. |
||
FPAE033 | Operational Availability of the SNS During Commissioning | 2289 |
|
||
Funding: This work was supported by SNS through UT-Batelle, LLC, under contract DE-AC05-00OR22725 for the U.S. DOE. The SNS is a partnership of six national laboratories: Argonne, Brookhaven, Jefferson, Lawrence Berkeley, Los Alamos, and Oak Ridge. The SNS Front End, Drift Tube Linac and most of the Coupled Cavity Linac have been operated during commissioning. Operating statistics were taken and used by system owners to target developments to improve accelerator availability. This progression will be shown along with the overall availability goals of the SNS and a RAM calculation showing the system and subsystem availability required to meet these goals. |