WPAT002 High Power (35 kW and 190 kW) 352 Solid State Amplifiers for the SOLEIL Synchrotron 811
 
  • P. Marchand, M.D. Diop, R.L. Lopes, J. Polian, F. Ribeiro, T. Ruan
    SOLEIL, Gif-sur-Yvette
 
  In the SOLEIL Storage Ring, two cryomodules, each containing a pair of superconducting cavities will provide the maximum power of 600 kW, required at the nominal energy of 2.75 GeV with the full beam current of 500 mA and all the insertion devices. Each of the four cavities will be powered with a 190 kW solid state amplifier consisting in a combination of 315 W elementary modules (about 750 modules per amplifier). The amplifier modules, based on a technology developed in house, with MOSFET transistor, integrated circulator and individual power supply, are fabricated in the industry. In the booster, a 35 kW solid state amplifier (147 modules) will power a 5-cell copper cavity of the LEP type. The first operational results and the status of the RF power plants are reported in this paper. Although quite innovative for the required power range, the solid state technology proved to be very attractive with significant advantages as compared to vacuum tubes.  
RPAE031 Progress Report on the Construction of SOLEIL 2203
 
  • M.-P. Level, J.C. Besson, P. Brunelle, R. Chaput, A. Dael, J.-C. Denard, J.-M. Filhol, J.M. Godefroy, C. Herbeaux, V. Le Roux, P. Marchand, A. Nadji, L.S.N. Nadolski, R. Nagaoka, M.-A. Tordeux
    SOLEIL, Gif-sur-Yvette
 
  Funding: SOLEIL

This paper reports the progress achieved in the construction of the accelerators of SOLEIL. Started in January 2002, the construction comes near to its end and the installation of the equipment on the site has begun from September 2004 and shall be completed within one year. The progress on the LINAC and Booster are reported separately, therefore this paper will focus more particularly on the Storage Ring: Dedicated measuring benches have been built to perform the magnetic measurements on all the magnets and the results of measurements have been analysed in term of particle dynamics behaviour in order to prepare the operating point for the commissioning. The status of innovative developments engaged from the beginning as super-conducting RF cavities, NEG coated vacuum chambers and BPMs digital electronics will be described. The construction of the first 6 insertion devices is also well advanced and will be reported. Finally, the machine impedance budget was further evaluated with consequently, still some modifications to the design of some components.

 
RPPE058 Successful RF and Cryogenic Tests of the SOLEIL Cryomodule 3438
 
  • P. Marchand, M. Louvet, M. Louvet-Monsanglant, K. Tavakoli, C. Thomas-Madec
    SOLEIL, Gif-sur-Yvette
  • L. Arnaudon, O. Brunner, R. Losito, P. Maesen, E. Montesinos, G. Pechaud, M.P. Prax
    CERN, Geneva
  • P. Bosland, P. Bredy, S. Chel, G. Devanz
    CEA/DSM/DAPNIA, Gif-sur-Yvette
 
  In the Storage Ring (SR) of the Synchrotron SOLEIL light source, two cryomodules will provide the maximum power of 600 kW required at the nominal energy of 2.75 GeV with the full beam current of 500 mA and all the insertion devices. A cryomodule prototype, housing two 352 MHz superconducting single-cell cavities with strong damping of the Higher Order Modes has been built and successfully tested in the ESRF. Even though the achieved performance (3 MV and 380 kW) does meet the SOLEIL requirement for the first year of operation, it was decided to upgrade the cryomodule prototype before its implementation in the SR. Modifications of the internal cryogenic system as well as the input power and dipolar HOM couplers required complete disassembling, reassembling and testing of the cryomodule, which were carried out at CERN. This refurbishment program, which was achieved in the framework of a collaboration between SOLEIL, CEA and CERN, is reported in this paper. A second cryomodule, similar to the modified prototype, is under manufacturing and will be implemented in the SR by the end of 2006.